EQCB Class Extensions of Time

An Environmental Quality Control Board (EQCB) Class Extension of Time is an extension of time to comply with requirements of Chapter 24 of the Code of Miami-Dade County that applies to a group of businesses, properties or the entire county.

Board Order 10-57  -- grants existing residential and non-residential properties a two-year extension of time to connect to a public sanitary sewer system provided the existing property has an uncontaminated and operational septic tank and complies with additional conditions as stated in the board order.

Board Order 10-34  -- provides the use of any on-site domestic well shall cease and connection shall be made to a public water main to an existing meter box within one hundred and twenty (120) days from the date that the Director or his designee determines that the approved water main is made available and operative.

Board Order 10-34  -- provides the use of any on-site domestic well shall cease and connection shall be made to a public water main within the public right-of-way within three hundred and sixty-five (365) days from the date that the Director or his designee determines that the approved water main is made available and operative.

Board Order 10-34  -- provides the use of an approved domestic sewage storage, disposal or treatment method shall cease and connection shall be made to an existing sanitary service lateral at the property line within one hundred and twenty (120) days from the date that the Director or his designee determines that the approved public sanitary service lateral is made available and operative.

Board Order 10-34  -- provides the use of an approved domestic sewage storage, disposal or treatment method shall cease and connection shall be made to an existing sanitary sewer main within the public right-of-way within three hundred and sixty-five (365) days from the date that the Director or his designee determines that the approved public gravity sewer line is made available and operative.

Board Order 10-34  -- provides the use of an approved domestic sewage storage, disposal or treatment method shall cease and connection shall be made to an existing sanitary sewer force main, including a sanitary sewer pump station, within the public right-of-way within three hundred and sixty-five (365) days from the date that the Director or his designee determines that the approved public sanitary sewer main is made available and operative.

If you cannot view PDF Get Acrobat! files, you can download Acrobat Reader  for free from Adobe Systems, Inc. In order to use PDF files, you must have Acrobat installed on your computer.

Back to Top Page Last Edited: Wed Jul 6, 2011 3:28:21 PM
derm
sect_5
 
 
Switch to mobile version.

© 2012 Miami-Dade County.
All rights reserved.
Miami-Dade County
 
Urchin Tracking Image
Corner
  • Facebook Twitter YouTube RSS
  • Print Print Email this page Email Page   | Bookmark and Share
  • Minimize Tools
Corner

You are now leaving the official website of Miami-Dade County government. Please be aware that when you exit this site, you are no longer protected by our privacy or security policies. Miami-Dade County is not responsible for the content provided on linked sites. The provision of links to these external sites does not constitute an endorsement.

Please click 'OK' to be sent to the new site, or Click 'Cancel' to go back.