DCSIMG
:) MPO Library Index at Miami-Dade MPO
TEXT ONLY | MOBILE | RSS
Miami-Dade Metropolitan Planning Organization
HOME RESOURCES BOARD and COMMITTEES PLANS and PROGRAMS STUDIES DOWNLOADS MINI-SITES ABOUT US
Downloads Past Meeting Minutes / Agendas Resolutions Library Index
Visit our Facebook page for faster updates! MPO Library Index
Custom MPO Search

 

     
     
 
3-ring Binders
  1. 137th Avenue Corridor Study, Final Report, 6/2007 by The Corradino Group
    Download above document.
  2. Administrative Action Final Environmental Impact Statement (FEIS), 3/1992 by FHWA; FDOT
  3. Alternatives for Intermodal Improvements in Miami-Dade County, 6/1998 by Kimley-Horn & Associates (KHA)
    Download above document at SkyDrive.
  4. Arterial Investment Study, NW/SW 107th Avenue, Final Report  by Miller Consulting, Inc.
  5. Basic FSUTMS Travel Demands Forecasting Workshop, Participants Workbook, 11/1994 by FDOT (Florida Dept. of Transportation)
  6. Beacon Countyline Development of Regional Impact, Application for Development Approval, 11/2007 by Flagler Development Group
  7. Beacon Countyline Development of Regional Impact, Response to Third Statement of Information Needed, 10/2008 by Flagler Development
    Download above document at SkyDrive.
  8. Beacon Lakes Development Regional Impact (DRI), Application to Development Approval, 2/2001 by Keith And Schnars, P.A.
  9. Beacon Lakes, Appendix 2: Supporting Documents and Information for Question 21 Transportation, 6/2001
  10. Beacon Tradeport Development Regional Impact (DRI), 5/1996 by David Plummer & Associates (DPA)
  11. Bicycle and Pedestrian Traffic Count Program, 5/2008 by David Plummer & Associates (DPA)
    Download above document.
  12. Bicycle Facilities Planning & Design Manual, Official Standards, Revised Edition 1982 by FDOT (Florida Dept. of Transportation)
  13. Biscayne Boulevard Transportation Enhancement Study, 9/1994 by Kimley-Horn & Associates
    Download above document at SkyDrive.
  14. Capital Improvement Program, Business Plan, 3/2003 by Miami-Dade Aviation Department
  15. City of Aventura Municipal Public Transit Study Phase III: Transit Enhancement, Expansion and Improvement Plan, 11/2002 by CUTR (Center for Urban Transportation Research); Craven Thompson
    Download above document.
  16. City of Doral Transportation Master Plan, 11/2004 by The Corradino Group
  17. City of Miami Beach Municipal Mobility Plan, Existing Conditions Report, Future Conditions Report, Special Users Report, Ten-Year Plan, 12/1998 by Corradino
    Download above document at SkyDrive.
  18. City of Miami Beach Municipal Mobility Plan, Implementation Plan, Program of Interrelated Projects, 9/1999 by Corradino
  19. City of North Miami Beach Community Mobility Program, A Multimodal Program of Transportation Improvements, 10/2003 by Chatterton
    Download above document at SkyDrive.
  20. Community Impact Assessment Handbook, A Handbook for Transportation Professionals, 11/2000 by CUTR (Center for Urban Transportation Congested Intersections Study, 6/1999 by TAP (Transportation Analysis Professionals)
    Download above document at SkyDrive.
  21. Congestion Mitigation: Private-Public Partnerships Study, Final Report, 3/1994 by Carr Smith Associates/Corradino
  22. Congestion Mitigation: Public-Private Partnerships Study, 3/1994 by The Corradino Group; Carr Smith Associates
  23. Continuing to Grow Today's Successes, While Preparing For Tomorrow's Challenges, RFP #332, 3/2002 by VPSI, Inc.
  24. Dade County Transit Development Program, Volume 1: Report in Brief & Service Standards, 9/1973 by Simpson & Curtain Transportation
  25. East-West Multimodal Corridor Study DEIS, Major Investment Study, 10/1995 by FDOT/FHWA
  26. East-West Multimodal Corridor: Existing Conditions Report, Station Area Aesthetics, Design & Development, 6/1998 by FDOT District 6
  27. Electric Vehicle Community Market Launch Manual Volume I: Policy; A Guide to Prepare Your Community for Electric Vehicles, 12/1995 by USDOT; U.S. Department of Energy
  28. Electric Vehicle Community Market Launch Manual Volume II: Infrastructure, A Guide to Prepare Your Community for Electric Vehicles, 12/1995 by USDOT; U.S. Department of Energy
  29. ETDM Interim Guidelines, "Efficient Transportation Decision Making", 2/2003 by URS
  30. Federal Circulars 1983 by USDOT/UMTA
  31. Federal Register, Part 3, 5/2000 by FHWA/FTA
  32. Financial Planning And Programming for MPOs, Federal Training Program, 2/1996 by NTI (National Transportation Institute)
  33. Florida City Commons Development of Regional Impact, Application for Development Approval, 7/2005 by Holland & Knight LLP
  34. Florida City Commons Development of Regional Impact, Application for Development Approval, Appendices, 7/2005 by Holland & Knight LLP Florida City Commons Development of Regional Impact, Response to Statement of Information Needed, 2/2006 by Holland & Knight LLP
  35. Florida Commission for the Transportation Disadvantaged, Annual Performance Report, 1/1997 by State of Florida
  36. Florida High Speed Transportation System (Proposal); Florida Overland Express, Executive Summary and Video, 10/1995 by FOX (Florida Overland Express)
  37. Florida High Speed Transportation System (Proposal); Florida Overland Express, Volume 1, 10/1995 by FOX (Florida Overland Express)
  38. Florida High Speed Transportation System (Proposal); Florida Overland Express, Volume 2, 10/1995 by FOX (Florida Overland Express)
  39. Florida High Speed Transportation System, Application for Franchise, 10/1995 by Rail Florida
  40. Florida Highway Landscape Guide, 4/1995
  41. Florida Highway System Plan: Level of Service Standards and Guideline Manual, 8/1989 by FDOT (Florida Dept. of Transportation)
  42. Florida Intrastate Highway System District 6 [includes CD-ROM], 12/1998 by FDOT (Florida Dept. of Transportation)
  43. Florida ITS Architecture Development, 9/2000 by ITS Florida Team of Champions
  44. Florida MPOAC Orientation and Reference Manual, First Edition 1999 by Florida MPOAC
  45. Florida's Commuter Assistance Program, Program Directors Manual  by FDOT (Florida Dept. of Transportation)
  46. FSUTMS Advanced Microcomputer Workshop, Student Reference Notebook, 7/1990 by FDOT (Florida Dept. of Transportation)
  47. FSUTMS, Florida's Standard Models, Intermediate Travel Demands Forecast Workshop, Participants Workbook, 5/1996 by TSG
  48. General Transportation Planning Consulting Services (E02-MPO-01), 8/2002 by HNTB
  49. Highway Capacity Manual, Special Report 209 1985 by TRB (Transportation Research Board)
  50. Homestead Reuse Plan, Briefing Book, 8/2001 by Beacon Council
  51. I-95 HOV Systems, Review of National Practices, Technical Memorandum, 11/1998 by Vanasse Hangen Brustlin, Inc.
  52. I-95 HOV Systems, System Overview, Technical Memorandum, 11/1998 by Vanasse Hangen Brustlin, Inc.
  53. Innovations in Public Involvement for Transportation Planning, 1/1994 by FHWA/FTA
  54. Intelligent Transportation Systems (ITS) Corridor Plan for Interstate 75, Draft Technical Report No. 1, Task 3 - Data Collection and Analysis, 1/2003 by TEI Engineers & Planners; PBSJ; RCC Consultants; Kittelson & Associates
  55. Interstate 395 Alternative Review & Development, 4/2004 by Kimley-Horn & Associates
  56. ITS Deployment Analysis System Build 1, User's Manual with CD-ROM, 12/1998 by FHWA (Federal Highway Administration)
  57. Jitney Service Pilot Program, Project Notebook Volume I, 7/2002 by Miller Consulting, Inc.
  58. Jitney Service Pilot Program, Project Notebook Volume II, 7/2002 by Miller Consulting, Inc.
  59. Kendall Area Transit Improvement Study, Final Report, 4/1996 by Carr Smith Associates
  60. Krome Avenue Action Plan, 10/1999 by Keith And Schnars, P.A.
    Download above document at SkyDrive.
  61. Lakes Of The North Development Regional Impact (DRI), 8/1999 by Lakes of The North, Inc.
  62. Letter of Interest and Performance Data Sheets, 2025 Long-Range Transportation Plan Update Study; DBD Project No. E99-MPO-02, 2/2000 by Gannett Fleming
  63. Level of Service Handbook 1998 [includes disk], 12/1998 by FDOT (Florida Dept. of Transportation)
  64. Metro VanPool Program Manual, Revision A, 8/1992 by Municipality of Metropolitan Seattle
  65. Metro-Dade Road Pricing Study, Final Report, 5/1995 by Kimley-Horn & Associates
  66. Metrorail/Coconut Grove Connection Study Phase II, Final Report, 1/2007 by Reynolds, Smith and Hills, Inc. (RS&H)
  67. Miami Beach Electric Wave, The South Beach Electric Shuttle Study, Appendices, Draft, 6/1997 by Carr Smith Associates
    Download above document at SkyDrive.
  68. Miami Beach Electric Wave, The South Beach Electric Shuttle Study, Draft, 6/1997 by Carr Smith Associates/Corradino
    Download above document at SkyDrive.
  69. Miami Beach Light Rail Transit System Feasibility Study, Summary Report, Final, 7/1989 by PBQD (Parsons Brinckerhoff Quade & Douglas) Miami Beach Municipal Mobility Plan, Existing Traffic Conditions Interim Report, 11/1997 by Corradino
  70. Miami Gardens Drive, Project Feasibility/Fatal Flaw Analysis, Plemo Study Phase I, Draft, 5/1999 by Miller Consulting, Inc.
  71. Miami International Airport Terminal And Airfield Expansion Program, Development of Regional Impact/Application for Development Approval, Volume 1: Application, 3/1996 by CH2M Hill Team
  72. Miami International Airport Terminal And Airfield Expansion Program, Development of Regional Impact/Application for Development Approval, Volume 2: Appendices, 3/1996 by CH2M Hill Team
  73. Miami Urban Area Transportation Study (MUATS) and Year 2025 LRTP Update, Project Evaluation Workbook, 7/2001 by Gannett Fleming
  74. Miami Urban Area Transportation Study, Status Report (for the Year 1985), Book 1, 3/1968 by Miami-Dade County Download above document at SkyDrive.
  75. Miami Urban Area Transportation Study, Status Report (for the Year 1985), Book 1, 3/1968 by Miami-Dade County
  76. Miami Urban Area Transportation Study, Status Report (for the Year 1985), Book 2, 3/1968 by Miami-Dade County
  77. Miami Urban Area Transportation Study, Status Report (for the Year 1985), Book 4, 3/1968 by Miami-Dade County
  78. Miami Urban Area Transportation Study, Status Report (for the Year 1985), Book 5, 3/1968 by Miami-Dade County
  79. Miami Urban Area Transportation Study, Status Report (for the Year 1985), Book 6, 3/1968 by Miami-Dade County
  80. Miami-Dade Expressway Authority Open Road Tolling Master Plan 2007-2011, 3/2006 by Dade Transportation Consultants
  81. Miami-Dade Transit North East Corridor Major Investment Study (MIS)/Alternative Analysis (AA), Project No. E02-MDT-01,E, 8/2002 by
  82. Mobility Management Process/Congestion Management System, Final Report 1996 by David Plummer & Associates (DPA); Sharpton, Brunson
  83. MUATS 2000 Update 1975 by Miami-Dade County
  84. Neighborhood Impact Study: LeJeune Road Flyover, Miami Springs, Florida, 11/2002 by GMB Engineers & Planners, Inc.; Renaissance
  85. NIH Course No. 15127: Statewide Highway Planning Procedures Participant Workbook, 1/1993 by USDOT; FHWA; National Highway Institute
  86. Northeast Miami Dade Traffic Flow Study (Tasks 1 through 5, Appendices A and B), 7/2007 by The Corradino Group
    Download above document.
  87. Northwest 27th Avenue Transit Corridor Travel Survey, Transit On-Board Origination-Destination Survey, 12/1989 by MDT (Miami-Dade
  88. NW 7th Avenue Traffic and Pedestrian Study, Work Order No. GPC III-41, Final Report, 5/2010 by The Corradino Group
    Download above document.
  89. One Day Seminar on Innovative Approaches to Travel Demand Modeling Activity Based Methods, 5/1996 by University of Florida, Department of Civil and Environmental Engineering
  90. Parkland Development of Regional Impact, Response to First Statement of Information Needed, 10/2006 by The Curtis Group
  91. Port of Miami Tunnel And Access Improvements DEIS, 4/1996 by FDOT/Port of Miami
  92. Private Sector Briefs: Private Sector Involvement in Public Transportation, 3/1988 by USDOT/UMTA
  93. Program of Interrelated Projects, 2/1997 by MDT (Miami-Dade Transit)
  94. Proposed New Runway at Miami International Airport DEIS, Volume 1: Documentation, 12/1997 by USDOT/FAA
  95. Proposed New Runway at Miami International Airport DEIS, Volume 2: Appendices, 12/1997 by USDOT/FAA
  96. Public Involvement in Transportation Decisionmaking, Federal Program Training, Course Manual, 10/1997 by NTI (National Transportation Public Transportation Blue Ribbon Task Force, with Final Report, 5/1986 by Miami-Dade County/Greater Miami Chamber of Commerce
  97. Reversible Flow Lane Study: SR 5/US 1/South Dixie Highway from SW 40th Street/SR 976/Bird Road to I-95, Appendix I- Synchro Output Results, 12/2007 by The Corradino Group
  98. Reversible Flow Lane Study: SR 5/US 1/South Dixie Highway from SW 40th Street/SR 976/Bird Road to I-95, Preliminary Project Report GPC III-07, 12/2007 by The Corradino Group
  99. Road Pricing and Expressway Authority Study Technical Appendix (Expressway Authority Legislation), 12/1993 by Kimley-Horn & Associates (KHA); Barbara Howard & Associates
    Download above document at SkyDrive.
  100. Short Courses for Metropolitan Planning, 9/1994 by USDOT/FHWA
  101. South Florida Transit Analysis Study, Executive Summary, Draft, 3/2003 by PBSJ (Post Buckley Schuh & Jernigan)
  102. South Florida Transit Analysis Study, Final Report, 5/2003 by PBSJ (Post Buckley Schuh & Jernigan)
  103. South Florida Vanpool Internal Operations Manual  by VPSI, Inc.
  104. South Florida Vanpool Program Marketing Plan, FY03-FY04, 3/2003 by VPSI, Inc.
  105. Southeast Florida Intelligent Corridor System, Transit Workshop, 5/1993 by Kimley-Horn & Associates
  106. Southeast Florida Intelligent Transportation System, Final Report, 11/1993 by JHK and Associates; Kimley-Horn & Associates; Biscayne Southeast Florida Regional Planning Model, Data Collection and Development Methodologies, WPI No. 4590339, 1/1998 by PAB Consulting Southeast Florida Regional Travel Characteristics Study, 10/1998 by FDOT District 6
  107. Southeast Florida Travel Characteristics Evaluation Study, Final Report, 8/1987 by FDOT (Florida Dept. of Transportation)
  108. SR826 Transportation & Land Use Study, Appendices, 3/1998 by Corradino
  109. SR826 Transportation & Land Use Study, Final Report, 3/1998 by Corradino
  110. State of Florida Air Implementation Plan, 1/1972 by Florida Dept. Pollution Control
  111. Street Closure/Traffic Flow Modification Study, 7/1996 by DPW/Miami-Dade MPO
  112. Summit Of The Americas, Volunteer Handbook 1994 by Office of Volunteer Coordination, Summit Of The Americas
  113. Town of Medley, NW South River Drive Corridor Study Area Expansion, Volume 1: Engineering Analysis (Master Plan), 11/2005 by Corzo Castella Carballo Thompson Salman, P.A.
  114. Town of Medley, NW South River Drive Corridor Study Expansion, Volume II: Traffic Report, 11/2005 by Corzo Castella Carballo Thompson
  115. Traffic Noise Analysis, Noise Barrier Design Guidelines, 7/1990 by FDOT (Florida Dept. of Transportation)
  116. Training Program for Major Investment Studies, Course Manual  by NTI/PBQD
  117. Transit "Bridge" Corridor Alternatives Analysis, Volume 1, 9/2002 by Kittelson & Associates Inc.
  118. Transit "Bridge" Corridor Alternatives Analysis, Volume 2, 9/2002 by Kittelson & Associates Inc.
  119. Transit "Bridge" Corridor Alternatives Analysis, Volume 3, 9/2002 by Kittelson & Associates Inc.
  120. Transit "Bridge" Study, Added Alternative Analysis, Public Involvement Activity Report, 3/2004 by Reynold Public Relations Inc.
  121. Transit "Bridge" Study, Added Alternative Analysis, Volume 1, 3/2004 by Reynold Public Relations Inc.
  122. Transit Financial Capacity Assessment Seminars, 11/1987 by UMTA; USDOT
  123. Transit Improvement Program Citizens Participation Program Work Plan, 6/1974 by Kaiser Engineers
  124. Transit Systems Planning and Alternatives Analysis Workshop, 7/1990 by CUTR (Center for Urban Transportation Research)
  125. Transportation Disadvantaged Handbook, 1/1990 by State of Florida
  126. Transportation, Infrastructure and Concurrency Task Force, 9/1991 by Miami-Dade County
  127. Travel Demand Management: A Reader, Volume 1, 2/1992 by Barton-Aschman Associates Inc.
  128. Travel Demand Management: A Reader, Volume 2, 2/1992 by Barton-Aschman Associates Inc.
  129. Tri-County Commuter Rail Authority, Consent Agendas/Minutes: Administration And Finance, 5/1996 by Tri-County Commuter Rail Authority
  130. Tri-County Commuter Rail Authority, Consent Agendas/Minutes: Administration And Finance, 9/1996 by Tri-County Commuter Rail Authority
  131. Tri-County Commuter Rail Authority, Station Site Planning Design Guidelines, 9/1994 by EDSA
  132. Turnpike Enterprise Value Pricing Study, Final Report, 9/2002 by Florida's Turnpike; USDOT
  133. UMTA '91 Resource Book, 5/1991 by UMTA (Urban Mass Transit Administration)
  134. Urban Transportation Planning Model Update, FDOT Standard Model Documentation Tasks A - D, Book 1 of 2, 7/1979 by Schimper Corradino
  135. Urban Transportation Planning Model Update, FDOT Standard Model Documentation Tasks E - J, Book 2 of 2, 7/1979 by Schimper Corradino
  136. US-1 Phase 2 Exclusive Buslanes; Project Development & Environmental Study, Traffic Report, 6/1996 by Carr Smith Associates
  137. US-1 Phase 2 Exclusive Buslanes; Project Development & Environmental Study, Traffic Report, Final, 10/1996 by Carr Smith Associates
  138. US1 Phase II Exclusive Buslanes, Project Development & Environmental Study, Final Traffic Report/Volume I: Main Report, 7/1997 by Carr Smith Associates
  139. UTPS (Urban Transportation Planning System) V87, Program Write-Ups (Copy 1 of 3), 12/1984 by UMTA; USDOT
  140. UTPS (Urban Transportation Planning System) V87, Program Write-Ups (Copy 2 of 3), 10/1985 by UMTA; USDOT
  141. UTPS (Urban Transportation Planning System) V87, Reference Manual (Copy 3 of 3), 12/1982 by UMTA; USDOT
  142. Welfare to Work: A Study of WAGES Clients, Employment Opportunities, Transit Availability, Best Practices, and Commuting Alternatives for Welfare Recipients, Draft, 11/1998 by Florida International University (FIU)
  143. West Palm Beach Urban Study Area, 2020 Long Range Transportation Plan, 11/1998 by Leftwich Consulting
  144. Your Plan Or Mine? Marketing Mobility in the 21st Century, 8/1996 by University of Wisconsin
Go to TOP
 
 [Bottom Shelf #1]
  1. Bicycle Project Feasibility Evaluation, Work Order #GPC 11-02, 11/2003 by Kimley-Horn & Associates
    Download above document.
  2. East-West Multimodal Corridor Study, DEIS Major Investment Study: Plan and Profile Drawings - Appendix A, 6/1995 by FDOT (Florida Dept. of Transportation)
  3. East-West Multimodal Corridor, Final Environmental Impact Statement  by FDOT (Florida Dept. of Transportation)
  4. Integrated Transportation Management System (ITMS) Maps, 11/1998 by David Plummer & Associates (DPA); Sharpton, Brunson & Co.
  5. Miami Intermodal Center, Major Investment Study/Draft Environmental Impact Statement, Supplemental Drawing Package, 10/1995 by FDOT (Florida Dept. of Transportation)
  6. Transit "Bridge" Corridor Alternatives Analysis/Draft EIS, Public Involvement Activities Report, Deliverable #5, 8/2002 by Kittelson &
  7. Transportation Plan For A New Century, Northwest/North/Beach/West/Central/South Area Improvements, 3/1999 by Miami-Dade County
  8. Transportation System Hurricane Emergency Preparedness Study, Appendix 1A: Transportation System Maps, 6/1995 by PBSJ (Post Buckley Schuh & Jernigan)
  9. Vision Workshop IV, Project Information Package, 7/2002 by Miami-Dade Expressway Authority (MDX)
Go to TOP
 
 [Bottom Shelf #2]
  1. City of South Miami US-1 Pedestrian Overpass Study (Revised), 7/2000 by McHarry Associates
    Download above document at SkyDrive.
  2. Congested Intersection Improvements Volume I: Action Plan, 3/2008 by David Plummer & Associates (DPA)
    Download above document.
  3. East-West Multimodal Study, Seaport Alternatives, Biscayne Boulevard Alignments, 2/1995 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  4. Krome Avenue Action Plan: Improvements to Krome Avenue (SR 997), Summary Report, Revised, 2/1999 by Keith And Schnars, P.A.
  5. Metropolitan Dade County Transportation Improvement Program, Preliminary Engineering/Architectural Drawings, 6/1975 by Kaiser Engineers Metrorail M-Path Master Plan, 7/2007 by Kimley-Horn & Associates
    Download above document.
  6. Miami Beach Intermodal Feasibility Study, Task I- Technical Memorandum, 8/2000 by Corradino
  7. Miami North Corridor Draft Environmental Impact Statement/Preliminary Engineering, Appendix A: Plan and Profile Drawings, 12/1997 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  8. Miami-Dade County Typical Roadway Section and Zoned Right-of-Way Update Study, 12/2007 by Kimley-Horn & Associates
  9. MIC/Earlington Heights Connector Study Draft Environmental Impact Statement, Vol. 2: Plan and Profile Drawings, 5/2003 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  10. Miracle Mile Traffic Circulator Study, Revised, 5/1994 by David Plummer & Associates (DPA)
    Download above document at SkyDrive.
  11. Railroad Rights-of-Way Assessment, Appendix VIII- ROW Maps, 8/1993 by ICF Kaiser Engineers
  12. Revitalization of the Economic Gateway to Downtown Miami, 10/1999 by David Plummer & Associates (DPA)
Go to TOP
 
[Bottom Shelf #3]
  1. A Major Highway Plan for Metropolitan Dade County, Florida, 12/1956 by Wilbur Smith Associates
  2. Adding Turbo Lanes to T-intersections Final Report, 5/2010 by David Plummer & Associates (DPA)
    Download above document.
  3. Black Creek Trail Segment B Planning and Feasibility Study, 10/2007 by Kimley-Horn & Associates
    Download above document.
  4. Catalyst For Prosperity, MDX Roadway Work Program: The Economic Impact, 9/1999 by Miami-Dade Expressway Authority (MDX)
  5. City of North Miami Beach Pedestrian/Bicycle Safety Study, 3/2008 by URS Corporation
    Download above document.
  6. Ludlam Trail Non-Motorized Corridor Study Master Plans, 2/2003 by Reynolds, Smith and Hills, Inc. (RS&H)
  7. Snake Creek Bike Trail Planning and Feasibility Study Final Report, 9/2005 by Kimley-Horn & Associates
    Download above document.
  8. Snapper Creek Trail Segment A Planning Study, 10/2008 by Kimley-Horn & Associates
    Download above document.
  9. Village of Palmetto Bay Bicycle & Pedestrian Master Plan, 8/2009 by Corradino
    Download above document.
Go to TOP
 
Aesthetics
  1. North Ponce de Leon Boulevard Median Evaluation, 11/2002 by David Plummer & Associates (DPA)
    Download above document.
  2. The North Beach Recreational Corridor, 10/1993 by Kimley-Horn & Associates
    Download above document at SkyDrive.
Go to TOP
 
Airport 1977-1990
  1. Description And Technical Review Of The Miami International Airport Satellite Transit Shuttle System, Final Report, 9/1979 by USDOT (United States Dept. of Transportation)
  2. Miami International Airport Transportation Study, Final Report: Summary And Recommendations, 1/1989 by Frederic R Harris (FRH)
    Download above document at SkyDrive.
  3. Miami International Airport Transportation Study, Technical Memorandum 1: Existing Conditions, 11/1987 by Frederic R Harris (FRH)
    Download above document at SkyDrive.
  4. Miami International Airport Transportation Study, Technical Memorandum 2: Future Conditions, 4/1988 by Frederic R Harris (FRH)
    Download above document at SkyDrive.
  5. Miami International Airport Transportation Study, Technical Memorandum 3: Formulation And Assessment Of Alternatives, 12/1988 by Frederic R Harris (FRH)
    Download above document at SkyDrive.
Go to TOP
 
Airport 1991-1995
  1. Airport Area Multimodal Access Study, Final Report, 4/1992 by Frederic R Harris (FRH)
    Download above document at SkyDrive.
  2. Airport Area Multimodal Access Study, Final Report Executive Summary 1992 by Frederic R Harris (FRH)
    Download above document at SkyDrive.
  3. Airport Area Multimodal Access Study, Tech Memo No. 1: Background/Previous Studies, 3/1991 by Frederic R Harris (FRH)
  4. Airport Area Multimodal Access Study, Tech Memo No. 2: Analysis of Feasibility of Access Modes, 1/1992 by Frederic R Harris (FRH)
  5. Florida Aviation System Plan, South Florida Metropolitan Area 1992-2010 1993 by FDOT/FAA
  6. Metro-Dade Aviation Department, Miami International Airport, Annual Report 1994 by Miami-Dade Aviation Department
  7. Miami International Airport Master Plan Update, Concept Development, 3/1993 by MDC Aviation Dept.
Go to TOP
 
Airport 1996-2000
  1. Disposal Of Portions Of The Former Homestead Air Force Base, Florida, Draft Supplemental Environmental Impact Statement, Summary, 12/1999 by USAF/FAA
  2. Southwest 112th Avenue Study Project Concept Report, Dade County-Homestead Regional Airport, Final Report, 7/1997 by PBSJ (Post Buckley Schuh & Jernigan)
Go to TOP
 
Area Planning Studies
  1. Area Planning Report, Commission District  1, 1/1994
  2. Area Planning Report, Commission District  2, 9/1996
  3. Area Planning Report, Commission District  8, 5/1996
  4. Area Planning Report, Commission District 11, 1/1994
  5. Area Planning Report, Commission District 9, 5/1996
  6. Coconut Grove Planning Study, 10/1997 by Coconut Grove Charrette Team (various entities)
  7. Dadeland Regional Activity Center Implementation Measures Report, 9/1998 by Miami-Dade County Planning, Development & Regulation
    Download above document at SkyDrive.
  8. Dadeland Regional Activity Center Specific Area Planning Report For Improving Mobility, 9/1996 by Metro-Dade County Planning, Development & Regulation
    Download above document at SkyDrive.
  9. Feasibility Analysis: Proposed Overtown Improvements, 6/1998
    Download above document at SkyDrive.
  10. Status Report, Commission District 4, Area Planning Report & Sunny Isles Study Area, 4/1995 by MDTA (Miami-Dade Transit Agency)
Go to TOP
 
Bike/Ped: Plans and Programs
  1. Bicycle Facilities Plan 2001, 4/2002 by Gannett Fleming
    Download above document.
  2. Dade County Bicycle Facilities Plan, Project No. MPO-93-1, 3/1993 by Miami-Dade MPO
    Download above document at SkyDrive.
  3. Metro-Dade Bicycle Facilities Plan, Executive Summary 1997 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  4. Metropolitan Dade County Comprehensive Bicycle Plan, 8/1986 by Miami-Dade MPO
    Download above document at SkyDrive.
  5. Pedestrian Plan 2001 by Gannett Fleming
    Download above document at SkyDrive.
  6. Safe Routes to School Program, Executive Summary, 9/2005 by Reynolds, Smith and Hills, Inc. (RS&H)
  7. Safe Routes to School Program: Safe Routes for Pilot Schools, Final, 9/2005 by Reynolds, Smith and Hills, Inc. (RS&H)
    Download above document.
  8. Walkable Communities, Twelve Steps For An Effective Program (guidelines), 6/1993 by FDOT (Florida Dept. of Transportation)
Go to TOP
 
Bike/Ped: Studies 1995-1999
  1. North Dade Greenways Master Plan Final Report, 11/1998 by Florida International University (FIU), School of Architecture
  2. Overtown Neighborhood Bicycle/Pedestrian Facilities Implementation Program, 4/1999 by Dames & Moore Group
    Download above document at SkyDrive.
  3. South Dade Greenway Network, Biscayne Trail, 30% Submission, 6/1998 by E.R. Brownell & Associates; EAC Consulting; Sanchez Zaneli & Associates
    Download above document at SkyDrive.
  4. South Dade Greenway Network, Southern Glades Trail and Everglades Trail, 8/1998 by E.R. Brownell & Associates; EAC Consulting; Sanchez Zaneli & Associates
    Download above document at SkyDrive.
Go to TOP
 
Bike/Ped: Studies 2000-2010
  1. Black Creek Trail Segment B Planning and Feasibility Study, Executive Summary, 10/2007 by Kimley-Horn & Associates
    Download above document.
  2. City of Coral Gables Bicycle Lanes & Pedestrian Sidewalks Assessment, 12/2002 by Marlin Engineering
  3. City of North Miami Beach Pedestrian and Bicycle Safety Analysis, 12/2004 by Dover, Kohl & Partners
    Download above document.
  4. City of Sunny Isles Beach Feasibility Study Summary of a Bridge to Link a Pedestrian/Bicycle Greenway, 9/2004 by Calvin, Giordano & Associates, Inc.
    Download above document.
  5. Metrorail M-Path Master Plan, Executive Summary, 7/2007 by Kimley-Horn & Associates
    Download above document.
  6. Rail Convertibility Study, Final Report, 11/2004 by The Corradino Group
    Download above document.
  7. Traffic Calming for Pedestrians at Miami Dade College Wolfson Campus, Technical Memorandum 3: Final Report, 9/2004 by HDR Engineering, Inc.
    Download above document.
Go to TOP
 
Certification: Federal
  1. 2004 Federal Certification of the Metropolitan Planning Organization for the Miami Urbanized Area, 2/2004 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. 2007 Certification Report, Miami Urbanized Area; Palm Beach, Broward, and Miami-Dade Metropolitan Planning Organizations, 8/2007 by USDOT; FTA
    Download above document at SkyDrive.
Go to TOP
 
Congestion 1990-1994
  1. A Green Light For Mobility, A Summary of The Metropolitan Dade County Regional Mobility Forum, 4/1991 by Miami-Dade County
  2. Bird Road - Palmetto Expressway Warehouse District Traffic Study, 12/1994 by Carr Smith Associates
    Download above document at SkyDrive.
  3. Congestion Management Plan, Background Report, 9/1992 by Barton-Aschman Associates Inc.
  4. Congestion Management Plan, Final Draft (incl. "Nightmare" highway brochures), 3/1993 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  5. Current Efforts In Transportation Demand Management And Tools For Its Implementation In Dade County, 3/1992 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  6. Dade County Transportation Demand Management & Congestion Mitigation Study, 4/1993 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  7. Dade County Transportation Demand Management & Congestion Mitigation Study, Final Draft, 3/1993 by Barton-Aschman Associates Inc.
  8. Flagler Street Reversible Flow Study, 5/1992 by Transport Analysis Professionals
    Download above document at SkyDrive.
  9. Miami Urbanized Area Congestion Management System, Technical Memo #1 Institutional Issues, 12/1994 by David Plummer & Associates (DPA)
    Download above document at SkyDrive.
Go to TOP
 
Congestion 1995-1999
  1. Dade County Mobility Management Process/Congestion Management System, Technical Memorandum 1: Institutional Issues, 8/1996 by David Plummer & Associates (DPA)
    Download above document at SkyDrive.
  2. Low Cost Improvement Program for RUSH (Resourceful Use of Streets and Highways), 9/1996 by David Plummer & Associates (DPA)
  3. Metro-Dade Road Pricing Study, Final Report, 5/1995 by Kimley-Horn & Associates
    Download above document at SkyDrive.
  4. Miami Urbanized Area Mobility Management Process/Congestion Management System, Draft Final Report, 10/1995 by David Plummer & Associates (DPA)
  5. Mobility Management Process/Congestion Management System, Executive Summary 1996 by David Plummer & Associates (DPA)
  6. Mobility Management Process/Congestion Management System, Final Report 1996 by David Plummer & Associates (DPA)
Go to TOP
 
Congestion 2000-2005
  1. Alternative Strategies for Mitigating Traffic Congestion, 10/2000 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Congestion Management System (CMS) Update, Review and Evaluation of Potential Congested Corridors, 11/2004 by Kimley-Horn &
  3. Congestion Management System (CMS) Update, Review and Evaluation of Potential Congested Corridors, Executive Summary, 11/2004 by Kimley-Horn & Associates
  4. Kendall Drive Mobility Enhancement Study, Final Submittal, 9/2002 by Gannett Fleming
  5. Miami-Dade County Grade Separation Study, 6/2005 by The Corradino Group
  6. New WASD Building at Douglas Station Traffic Study, 6/2001 by David Plummer & Associates (DPA)
  7. School Zone Traffic Congestion Study, 4/2002 by David Plummer & Associates (DPA)
  8. Transit ContraFlow Feasibility Study, Executive Summary, 6/2002 by Kimley-Horn & Associates
  9. Transit ContraFlow Feasibility Study, Final Report, 6/2002 by Kimley-Horn & Associates
Go to TOP
 
Congestion 2006-2008
  1. Congested Intersection Improvements Executive Summary, 3/2008 by David Plummer & Associates (DPA)
    Download above document.
  2. Congested Intersection Improvements Volume II: Selected Data and Analysis, 3/2008 by David Plummer & Associates (DPA)
    Download above document.
  3. Feasibility of Implementing Tech Centers in Miami-Dade County, 7/2006 by CUTR (Center for Urban Transportation Research)
  4. Feasibility of Implementing Tech Centers in Miami-Dade County, Executive Summary, 7/2006 by CUTR (Center for Urban Transportation Research)
  5. I-95 Managed Lanes Traffic And Revenue Study, Summary of Findings, 3/2006 by Wilbur Smith Associates
  6. Indirect Left Turns Study Executive Summary, 12/2008 by David Plummer & Associates (DPA)
    Download above document.
  7. Indirect Left Turns Study formerly Left Turns Via 3 Rights, Work Order #GPC III-22,  Final Report, 12/2008 by David Plummer & Associates (DPA)
    Download above document.
  8. Northeast Miami-Dade Traffic Flow Study 2007 by The Corradino Group
  9. South Dade Managed Lanes Study, Executive Summary, 9/2008 by Kimley-Horn & Associates
    Download above document.
  10. South Dade Managed Lanes Study, Final Report, 9/2008 by Kimley-Horn & Associates
    Download above document.
  11. US 1 Reversible Flow Lane Study, Executive Summary 2007 by The Corradino Group
    Download above document.
  12. US-1 Intersection Improvement Study, 4/2008 by Florida International University (FIU), Lehman Center for Transportation Research
  13. US-1 Intersection Improvement Study Presentation, 5/2008 by Florida International University (FIU), Lehman Center for Transportation Research
  14. Westchester Traffic Impact Study Final Report, 6/2008 by Gannett Fleming
    Download above document.
Go to TOP
 
Congestion 2009-2014
  1. Adding Turbo Lanes to T-intersections Appendices, 5/2010 by David Plummer & Associates (DPA)
    Download above document.
  2. Adding Turbo Lanes to T-intersections Study Executive Summary, 5/2010 by David Plummer & Associates (DPA)
    Download above document.
  3. Health District Traffic Study, 5/2009 by The Corradino Group
    Download above document.
  4. Implementation Plan for the Northeast Corridor Traffic Flow Study (Work Order #GPC 111-36), 1/2010 by Kimley-Horn & Associates
    Download above document.
  5. Implementation Plan for the Northeast Corridor Traffic Flow Study Executive Summary, 1/2010 by Kimley-Horn & Associates
    Download above document.
  6. The 2009 Congestion Management Process Update, 10/2009 by Gannett Fleming
    Download above document.
  7. The 2009 Congestion Management Process Update Executive Summary, 10/2009 by Gannett Fleming
    Download above document.
  8. US-1/SR-878 Intersection Sub-Area Traffic Study (DPA Project #09140), Revised, 3/2010 by David Plummer & Associates (DPA)
    Download above document.
Go to TOP
 
Congestion: Superarterial Network
  1. Arterial Grid Analysis Study, Work Order #GPC II-15, Final report, 3/2007 by Kimley-Horn & Associates
    Download above document.
  2. Superarterial Network Study, Project No. MPO-96-07 Final Report, 10/1998 by PBQD (Parsons Brinckerhoff Quade & Douglas)
    Download above document at SkyDrive.
  3. Superarterial Network Study, Project No. MPO-96-07, Recommended Improvements 1998 by PBQD (Parsons Brinckerhoff Quade & Douglas)
    Download above document at SkyDrive.
  4. Superarterial Network Study, Project No. MPO-96-07, Technical Memorandum #1: Study Coordination, 3/1997 by PBQD (Parsons Brinckerhoff Quade & Douglas)
    Download above document at SkyDrive.
  5. Superarterial Network Study, Project No. MPO-96-07, Technical Memorandum #2: Literature Review, 2/1997 by PBQD (Parsons Brinckerhoff Quade & Douglas)
    Download above document at SkyDrive.
  6. Superarterial Network Study, Project No. MPO-96-07, Technical Memorandum 3: Data Collection, 3/1997 by PBQD (Parsons Brinckerhoff Quade & Douglas)
    Download above document at SkyDrive.
  7. Superarterial Network Study, Project No. MPO-96-07, Technical Memorandum 7: Preliminary Testing and Evaluation of Test Candidates, 2/1998 by PBQD (Parsons Brinckerhoff Quade & Douglas)
    Download above document at SkyDrive.
  8. Superarterial Network Study, Project No. MPO-96-07, Technical Memorandum 8: Estimation of Test Implementation Requirements, 2/1998 by PBQD (Parsons Brinckerhoff Quade & Douglas)
    Download above document at SkyDrive.
Go to TOP
 
Corridor Studies 1990-1995
  1. Dixie Highway Transportation Corridor Planning And Design Study, Fatal Flaw Analysis, Draft, 10/1994 by Kimley-Horn & Associates
  2. Dixie Highway Transportation Corridor Planning And Design Study, Technical Report #1: Data Collection And Mapping, Draft, 11/1994 by Kimley-Horn & Associates
  3. NW 36th Street/NW 41st Street - SR112 Extension Corridor Concept Study Report, 6/1995 by PBSJ (Post Buckley Schuh & Jernigan)
  4. NW 36th Street/NW 41st Street - SR112 Extension, Corridor Concept Study Report, 9/1995 by PBSJ (Post Buckley Schuh & Jernigan)
  5. SR-836/I-395 PD&E Study (State No. 87200-1532), 1/1994 by Metric Engineering Inc.
Go to TOP
 
Corridor Studies 1996-2000
  1. Dixie Highway Transportation Corridor Planning and Design Study, Corridor Planning and Design Report, 1/1998 by Kimley-Horn & Associates
  2. Kendall Drive Traffic Study, Draft Report, 8/1996 by Kimley-Horn & Associates
  3. West Flagler Street Corridor Study Final Report For Improving Mobility Specific Area Planning Report, 9/1997 by Miami-Dade County Planning, Development & Regulation
    Download above document at SkyDrive.
  4. West Flagler Street Corridor Study, Implementation Measures Report, 9/1998 by Miami-Dade County Planning, Development & Regulation
    Download above document at SkyDrive.
Go to TOP
 
Corridor Studies 2001-2002
  1. 79th Street Corridor Redevelopment Plan Transportation Analysis Draft Report, 9/2002 by Kimley-Horn & Associates
    Download above document.
  2. Downtown Kendall Transportation Study, 3/2002 by Gannett Fleming
    Download above document at SkyDrive.
  3. Kendall - SR 826 Corridor Major Investment Study, Executive Summary. Local Preferred Alternative, 6/2001 by Daniel, Mann, Johnson & Mendenhall
  4. Livable Communities Initiative: SR 934 Corridor Study Phase I, 11/2002 by FDOT (Florida Dept. of Transportation)
  5. Living Communities Initiative: SR 934 Corridor Study Phase II, Technical Memorandum No. 4 Evaluation of Alternatives, Draft, 11/2002 by FDOT (Florida Dept. of Transportation)
Go to TOP
 
Corridor Studies 2003-2004
  1. Livable Communities Initiative: SR 934 Corridor Study Phase II, 7/2003 by FDOT (Florida Dept. of Transportation)
  2. Town of Medley, NW South River Drive Corridor Study, NW 107th Avenue to the Palmetto Expressway (SR-826) Volume 1: Engineering Analysis, 12/2003 by Corvo Castella Carballo Thompson Salman, PA
    Download above document.
  3. Town of Medley, NW South River Drive Corridor Study, NW 107th Avenue to the Palmetto Expressway (SR-826) Volume II: Traffic Report, 12/2003 by Corzo Castella Carballo Thompson Salman, P.A.; Metric Engineering
Go to TOP
 
Corridor Studies 2005-2008
  1. Miami River Corridor Multi-Modal Transportation Plan, Appendices, 8/2007 by Kimley-Horn & Associates
  2. Miami River Corridor Multi-Modal Transportation Plan, Final Report, 8/2007 by Kimley-Horn & Associates
  3. NW/NE 36th Street Study, Executive Summary, 6/2007 by Kimley-Horn & Associates
    Download above document.
  4. NW/NE 36th Street Study, Final Report (Work Order #GPC III-05), 6/2007 by Kimley-Horn & Associates
    Download above document.
  5. SW 137th Avenue Corridor Study (From SW 184th Street to Turnpike Extension), 2/2005 by Miami-Dade Planning & Zoning
    Download above document.
  6. SW 152nd Street Corridor Transportation Study Executive Summary Report, 7/2008 by Gannett Fleming
    Download above document.
  7. SW 152nd Street Corridor Transportation Study Final Report, 7/2008 by Gannett Fleming
    Download above document.
Go to TOP
 
Corridor Studies 2009-Present
  1. Town of Medley NW 116th Way Corridor Study, 6/2010 by Calvin, Giordano & Associates, Inc.
    Download above document.
Go to TOP
 
Demography
  1. 2000 Census Population and Housing Profiles of General Demographic Characteristics, 6/2001 by Miami-Dade Planning & Zoning
  2. Dade County Facts, 8/1986 by Metro-Dade Planning Department
  3. Hispanics in Dade County 1990, 3/1994 by Metropolitan Dade County Planning Department, Research Division
  4. Population Estimates and Projections, Dade County, Florida, Statistical Areas and Census Tracts 1970-2005, 7/1985 by Metro-Dade Planning Department
  5. Population Estimates and Projections, Patterns of Population Change, Dade County, Florida, 1970-2010, 2/1987 by Metro-Dade Planning Department
  6. Population Projections, Dade County, Florida, 1985-2010, 6/1986 by Metro-Dade Planning Department
  7. Profile of the Black Population 1990, 12/1995 by Metropolitan Dade County Planning Department, Research Division
  8. Trends in Metropolitan America, 2/1977 by Advisory Commission of Intergovernmental Relations
    Download above document at SkyDrive.
Go to TOP
 
Downtown Studies 1970-1989
  1. Demographics and Demand Factors Affecting the Appeal of the SE Overtown/Park West Comm., 9/1985
    Download above document at SkyDrive.         
  2. Downtown Government Center Master Plan, 5/1976
    Download above document at SkyDrive.
  3. Downtown Miami - Master DRI Overview, 12/1987
    Download above document at SkyDrive.
  4. Downtown Miami Transportation Report to the Dade County Metropolitan Planning Organization, Revised, 3/1986 by Downtown Development Authority
    Download above document at SkyDrive.
  5. Miami: 3 Proposals for Downtown, 9/1970 by I.M. Pei & Partners; Vincent Ponte; Travers Associates
    Download above document at SkyDrive.
  6. Miami: Downtown Master Plan, A Vision For The Future 1989 by Downtown Development Authority
    Download above document at SkyDrive.
Go to TOP
 
Downtown Studies 1990-1994
  1. DDA Miami Facts: The Making of A Global City, Downtown Miami 1994 by DDA Miami
  2. Final Report for I-95 Dupont Plaza Ramps Alternative Feasibility Study, 9/1993 by Carr Smith Associates
    Download above document at SkyDrive.
  3. Final Report for I-95 Dupont Plaza Ramps Alternative Feasibility Study, Executive Summary, 9/1993 by Carr Smith Associates
    Download above document at SkyDrive.
  4. Flagler Marketplace, Draft Executive Summary, 8/1994 by Carr Smith Associates
  5. Metro-Miami Marketplace: Destination 2001 1994 by Miami-Dade County
  6. Metromover-Bayside Pedestrian Promenade Concept Master Plan, Technical Memorandum No. 1, 3/1993 by Bermello, Ajamil & Partners, Inc.
    Download above document at SkyDrive.
  7. Metromover-Bayside Pedestrian Promenade Concept Master Plan, Technical Memorandum No. 2, 3/1993 by Bermello, Ajamil & Partners, Inc.
    Download above document at SkyDrive.
  8. Metromover-Bayside Pedestrian Promenade Concept Master Plan, Technical Memorandum No. 3, 3/1993 by Bermello, Ajamil & Partners, Inc.
    Download above document at SkyDrive.
Go to TOP
 
Downtown Studies 1995-1999
  1. Flagler Marketplace Two-Year Implementation Program Update, 7/1995 by DDA Miami
    Download above document at SkyDrive.
  2. Flagler Marketplace, Traffic Impact Study, 6/1995 by Carr Smith Associates
    Download above document at SkyDrive.
  3. Metro-Miami Marketplace: Destination 2001, Executive Summary, 4/1995 by Miami-Dade County
  4. Proposal to the Dade County MPO for The Brickell Village Street Improvements, 12/1995 by DDA Miami
    Download above document at SkyDrive.
  5. Year 2000 Fast Track Transportation Initiative, 11/1999 by Downtown Development Authority (DDA) Miami
Go to TOP
 
Downtown Studies 2000-2004
  1. Downtown Miami Transportation Master Plan, 6/2000 by DDA Miami
    Download above document at SkyDrive.
  2. I-95 Dupont Plaza Ramps Alternatives Land And Development Assessment Study, Final Assessment Report To The Miami-Dade MPO, 3/2000 by DDA Miami
    Download above document at SkyDrive.
  3. Miami Downtown Transportation Master Plan, 4/2003 by David Plummer & Associates (DPA); Leftwich Consulting; MRD Consulting; Precision
    Download above document.
  4. Miami Downtown Transportation Master Plan, Executive Summary, 4/2003 by David Plummer & Associates (DPA)
    Download above document.
  5. Notification of a Proposed Change to a Previously Approved Development of Regional Impact (DRI) [Watson Island Boundaries Expansion], 4/2004 by Florida Dept. of Community Affairs
    Download above document at SkyDrive.
  6. Transportation Assessment: Proposed Boundary Change to the Downtown Miami DRI Increment II, Revised, 3/2004 by David Plummer & Associates (DPA)
    Download above document at SkyDrive.
Go to TOP
 
East-West: Corridor
  1. East-West Mulitmodal Corridor: Multimodal Projects Briefing  by FDOT (Florida Dept. of Transportation)
  2. East-West Multimodal Corridor Study & Miami Intermodal Center Study Major Investment Studies Project Update, 2/1995
  3. East-West Multimodal Corridor Study & Miami Intermodal Center Study Major Investment Studies Project Update, 8/1995 by FDOT (Florida Dept. of Transportation)
  4. East-West Multimodal Corridor Study, Description of Project, 1/1997 by FDOT (Florida Dept. of Transportation)
  5. East-West Multimodal Corridor Study, Description of Project, 5/1997 by FDOT (Florida Dept. of Transportation)
    Download above document at SkyDrive.
  6. East-West Multimodal Corridor Study, Description of Project, 10/1998 by FDOT (Florida Dept. of Transportation)
    Download above document at SkyDrive.
  7. East-West Multimodal Corridor Study, Detailed Definition of Alternatives, 2/1995 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  8. East-West Multimodal Corridor Study, MPO Locally Preferred Alternative Report, 6/1996
  9. East-West Multimodal Corridor Study, Policy and Technical Steering Committees' Recommendation Report, 1/1996 by FDOT (Florida Dept. of Transportation)
    Download above document at SkyDrive.
  10. East-West Multimodal Corridor Study, Staff Recommendation Report, 1/1996 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  11. East-West Multimodal Corridor Study, Vehicle Storage Yard and Maint. Facility Concepts, 8/1995 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  12. East-West Multimodal Corridor, Station Area Aesthetics, Design & Development Program, State Project No. 87200-1537, WPI No. 6114334  by FDOT (Florida Dept. of Transportation)
  13. East-West Multimodal Corridor/Miami Intermodal Center (MIC) Preliminary Engineering and Environmental Studies Project Update, 10/1994
Go to TOP
 
East-West: MIC
  1. Connecting People East-West, Definition Of Alternatives Report, Miami Intermodal Center, 2/1995 by FDOT (Florida Dept. of Transportation)
  2. Connecting People East-West, Joint Development Market Analysis/Development Program, Miami Intermodal Center Project, 1/1995 by FDOT (Florida Dept. of Transportation)
  3. Connecting People East-West, Major Investment Study/Draft Environmental Impact Statement (DEIS), Miami Intermodal Center, 12/1995 by FDOT (Florida Dept. of Transportation)
  4. Connecting People East-West, Miami Intermodal Center Policy And Technical Steering Committees' Recommendation Report, 2/1996 by ICF Kaiser Engineers
    Download above document at SkyDrive.
  5. Connecting People East-West, Program Description, Miami Intermodal Center, 7/1999 by FDOT (Florida Dept. of Transportation)
  6. Connecting People East-West, Project Description, Miami Intermodal Center, 2/1997 by FDOT (Florida Dept. of Transportation)
  7. Connecting People East-West, Project Development Environmental Study Update, Miami Intermodal Center Project, 11/1994 by FDOT (Florida Dept. of Transportation)
  8. Miami Intermodal Center, Scoping Document, 12/1993 by ICF Kaiser Engineers
  9. MIC / Rental Car Center / Miami Central Station, Summer 2006 Edition 2006 by FDOT (Florida Dept. of Transportation)
Go to TOP
 
e-Government
  1. Background Research On Kiosk Projects Around The United States, Technical Memorandum #1, 10/1996 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  2. Metro-Dade Traveler Information Station, Technical Memorandum #2 - Data Analysis and Needs, 2/1996 by CUTR (Center for Urban Transportation Research)
Go to TOP
 
Environmental
  1. Air Quality Report, US 1 Exclusive Bus Lanes, 8/1992 by FDOT (Florida Dept. of Transportation)
    Download above document at SkyDrive.
  2. DERM Air Quality Report, Technical Report #95-4 1994 by Miami-Dade DERM
  3. Transportation Control Measure Information Documents, 3/1992 by Cambridge Systematics Inc.
Go to TOP
 
Expressways
  1. Access to SW 137th Avenue to and from SR 874 (Don Shula Expressway), Work Order #GPC-06, Final Report, 4/2002 by Kimley-Horn & Associates
  2. Assessment of the Miami Urban Watch Alternative for Rebuilding I-395, 7/2002 by University of Miami School of Architecture Center for Urban & Community Design
    Download above document.
  3. Dade County Expressway Authority Evaluation Report, 4/1995 by Kimley-Horn & Associates
  4. Executive Summary: Assessment of the Miami Urban Watch Alternative for I-395, 7/2002 by University of Miami School of Architecture Center for Urban & Community Design
  5. Five-Year Work Program, Fiscal Year 1999 - 2003, 10/1998 by Dade Transportation Consultants
  6. I-95 Study, Project Overview, Presentation Book  by Kimley-Horn & Associates
    Download above document at SkyDrive.
  7. Miami Urban Watch Alternative to I-395, 10/2002 by University of Miami School of Architecture Center for Urban & Community Design
    Download above document at SkyDrive.
  8. Presentation: P.A.C./Omni Area Access Improvements, Presented to: I-395 MPO Sub-Committee, 3/2003 by Metric Engineering Inc.
  9. SR 112 Extension Concept Study from LeJeune Road to HEFT presentation
  10. SR 112 Extension Study Issues Paper, 1/1995 by PBSJ (Post Buckley Schuh & Jernigan); URS Consultants Inc.
    Download above document at SkyDrive.
  11. SR-836/I-395 Study MPO Presentation, 7/2000 by Miami-Dade MPO
  12. Transportation Programs and Projects for the Omni & Performing Arts Center Areas, I-395 Alternatives Review Study, Status Report, 3/2003 by Miami-Dade MPO
  13. US-1, The 18-mile Stretch to the Florida Keys, MPO Presentation, 2/2001 by Miami-Dade MPO
  14. Value Pricing - Hot Lanes in South Florida, Final Report, Results of Survey and Conclusions, 10/2000 by CUTR (Center for Urban Transportation Research)
Go to TOP
 
Finance
  1. Connector Route to Miami International Airport Economic Study, 6/1965 by Howard, Needles, Tammen & Bergendoff Consulting Engineers
    Download above document at SkyDrive.
  2. Financing Dade County's Long Range Transportation Plan, Executive Summary, 7/1997 by KPMG
  3. Local Option Gas Tax at Work 1996 by Miami-Dade MPO
  4. Local Option Gas Tax Expenditure Report, 2/1996
  5. Transportation Financial Analyses and Assessments, Executive Summary, 7/1997 by KPMG Peat Marwick LLP; Sharpton, Brunson & Co.
    Download above document at SkyDrive.
  6. Transportation Financial Analysis And Assessments, Final Report, 7/1997 by KPMG
Go to TOP
 
Freight 1990-1999
  1. Freight Movement Study, Executive Summary, 12/1996 by The Corradino Group
    Download above document at SkyDrive.
  2. Freight Movement Study, Final Report, 12/1996 by The Corradino Group
    Download above document at SkyDrive.
  3. Freight Movement Study, Technical Memorandum #1: Data Collection & Preliminary Analysis, 6/1995 by The Corradino Group
  4. Freight Movement Study, Technical Memorandum #2: Analysis of Data, Application of Freight Modes…, 11/1995 by The Corradino Group
  5. Freight Movement Study, Technical Memorandum #3, 3/1996 by The Corradino Group
Go to TOP
 
Freight 2000-2008
  1. Central Dade Transport Zone Study Executive Summary, 8/2008 by Kimley-Horn & Associates
    Download above document.
  2. Central Dade Transport Zone Study Final Report, 8/2008 by Kimley-Horn & Associates
    Download above document.
  3. Port of Miami Freight Access Study, Executive Summary, 2/2007 by Cambridge Systematics Inc.
  4. Port of Miami Freight Access Study, Final Report, 2/2007 by Cambridge Systematics Inc.
  5. Short Range Truck Traffic Study for the Airport West Area, Executive Summary, 7/2002 by David Plummer & Associates (DPA)
  6. Short Range Truck Traffic Study for the Airport West Area, Final Report, 7/2002 by David Plummer & Associates (DPA)
  7. Trends in Heavy Truck Traffic Management, Executive Summary, 2/2005 by Cambridge Systematics Inc.
    Download above document.
  8. Trends in Heavy Truck Traffic Management, Final Report, 2/2005 by Cambridge Systematics Inc.
    Download above document.
  9. Truck Parking in Unincorporated Miami-Dade Residential Areas Study, Background Research, 10/2001 by David Plummer & Associates (DPA)
    Download above document at SkyDrive.
  10. Truck Route System for Miami-Dade County Executive Summary, 6/2007 by The Corradino Group
    Download above document.
  11. Truck Route System for Miami-Dade County Final Report, 6/2007 by The Corradino Group
    Download above document.
Go to TOP
 
Freight 2009-Present
  1. Medley Sub-Area Freight Study, Final Report, 3/2009 by Gannett Fleming
    Download above document.
  2. Miami-Dade CSX Corridor Evaluation Final Report, 8/2009 by Parsons; BCC Engineering Inc.
    Download above document.
  3. Miami-Dade Freight Plan Executive Summary, 3/2009 by Gannett Fleming
    Download above document.
  4. Miami-Dade Freight Plan Final Report, 3/2009 by Gannett Fleming
    Download above document.
Go to TOP
 
GIS
  1. Development of a Visual TIP: Proposed Task for GPC, 1/2002 by Kimley-Horn & Associates
  2. Development of the Miami-Dade County Integrated Transportation Management System (ITMS), Executive Summary 1998 by David Plummer & Associates (DPA); Sharpton, Brunson & Co.
  3. Development of the Miami-Dade County Integrated Transportation Management System (ITMS), Final Report, 11/1998 by David Plummer & Associates (DPA)
    Download above document at SkyDrive.
  4. Improving Welfare-To-Work Transportation Planning: A Geographic Information System (GIS) Application, Final Report, 5/2002 by Florida International University (FIU), Lehman Center for Transportation Research 
  5. InteracTIP, System Definition Draft Document, 10/2002 by David Plummer & Associates (DPA); International Development Advisory Services (IDAS)
  6. Transportation Data Management System, Executive Summary, 2/2002 by David Plummer & Associates (DPA); International Development Advisory Services (IDAS)
    Download above document.
  7. Transportation Data Management System, Final Report, 2/2002 by David Plummer & Associates (DPA); International Development Advisory Services (IDAS)
    Download above document.
  8. Transportation Data Management System, Training Manual, 3/2002 by David Plummer & Associates (DPA); International Development Advisory Services (IDAS)
    Download above document at SkyDrive.
  9. Visual TIP Proposal, 1/2002 by David Plummer & Associates (DPA); International Development Advisory Services (IDAS)
  10. VisualTIP: Transportation Improvement Plan for the 21st Century, 1/2002 by Gannett Fleming
Go to TOP
 
High Speed Rail 1986-1990
  1. Fastrain, 3/1988 by Florida High Speed Rail Corp.
  2. Florida High Speed Rail - Franchise Component: Sufficiency Response for the Franchise Application, 7/1990 by Florida High Speed Rail Corp.
  3. Florida High Speed Rail Line, Request For Proposals And Reference Documents, 12/1986
  4. Florida High Speed Rail Project  by Bombardier, Inc.
  5. Florida High Speed Rail Transportation Commission, Executive Summary, 3/1988 by Bombardier, Inc.
  6. Florida High Speed Rail Transportation Commission, Franchise Component, 3/1988 by Bombardier, Inc.
  7. Florida's High Speed Rail Study
  8. High Speed Rail Task Force Report, 11/1986 by Greater Miami Chamber of Commerce
  9. Working Together To Bring High Speed Rail Service To Florida  by Stone & Webster
Go to TOP
 
High Speed Rail 1991-1995
  1. Application for Franchise: Florida High Speed Transportation System, Executive Summary, 10/1995 by Rail Florida
  2. Florida High Speed Transportation System (FHSTS) Proposal, Chapter 1: Business Entity Information and Applicant Qualifications, 10/1995 by Florida Maglev Consortium, Inc.
  3. Florida High Speed Transportation System (FHSTS) Proposal, Chapter II: Florida's Travel and Transportation Market, 10/1995 by Florida Maglev Consortium, Inc.
  4. Florida High Speed Transportation System (FHSTS) Proposal, Chapter III: System Development Plan, 10/1995 by Florida Maglev Consortium, Inc.
  5. Florida High Speed Transportation System (FHSTS) Proposal, Chapter IV: Environmental and Community Effects, 10/1995 by Florida Maglev Consortium, Inc.
  6. Florida High Speed Transportation System (FHSTS) Proposal, Executive Summary, 10/1995 by Florida Maglev Consortium, Inc.
  7. Florida High Speed Transportation System, Florida Overland Express, Executive Summary 1995 by Florida Overland Express
  8. Florida High Speed Transportation System, Proposal to Florida Department of Transportation, 10/1995 by Florida Magplane, Inc.
  9. Florida Intercity Rail Passenger Service, Options For The 21st Century, A Component of the Florida Transportation Plan  by FDOT (Florida Dept. of Transportation)
Go to TOP
 
Historical
  1. Comprehensive Development Master Plan for Metropolitan Dade County, Florida, 7/1979 by Miami-Dade County
  2. Historical Impacts of Transportation Projects on the Overtown Community, Final Report, 3/1998 by Florida International University (FIU), Metropolitan Center Institute of Government
    Download above document at SkyDrive.
  3. Land Use Plan, A Component of the Comprehensive Development Master Plan for Metro-Dade County Florida, Adopted 1990 and 2005, 7/1983 by Metro-Dade County
  4. Miami Comprehensive Neighborhood Plan 1976-1986  by City of Miami Planning Department
  5. Proposed General Land Use Master Plan, Metropolitan Dade County, Florida, 10/1963 by Miami-Dade Planning Department
  6. Resourceful Rehab, A Guide For Historic Buildings In Dade County 1987 by Miami-Dade Historical Preservation
Go to TOP
 
HOV
  1. Catch The 95 Magic Diamond Ride, HOV Information  by Gold Coast Commuter Services
  2. HOV Conceptual Design Study, Interim Report #1: South Dade, Palmetto and East-West Expressways, 7/1985 by Kimley-Horn & Associates
  3. HOV Conceptual Design Study, Interim Report #2: South Dade, Palmetto and East-West Expressways, 10/1985 by Kimley-Horn & Associates
  4. I-95 HOV Systems Plan, Phase II System-wide Operations Study, Technical Memorandum #1: Data Analysis, Draft, 5/2002 by Kimley-Horn & Associates
  5. SR 826 Palmetto Expressway HOV Lanes Staging Plan, 7/1996 by PBSJ (Post Buckley Schuh & Jernigan)
Go to TOP
 
Hurricane 1994
  1. Post Hurricane Short Range Transportation Plan, Technical Report #1 Existing Data: Compilation, Review and Analysis, 2/1994 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  2. Post Hurricane Short Range Transportation Plan, Technical Report #4 Summary of Pre- and Post-Hurricane Data, Draft, 4/1994 by Barton-Aschman Associates Inc.
  3. Post Hurricane Short Range Transportation Plan: Technical Report #3 Summary of Survey Results Household Travel and Hurricane Impact Survey, 5/1994 by Barton- Aschman Associates Inc.
  4. Travel Diary Addendum to Summary of Survey Results Household Travel and Hurricane Impact Survey, 5/1994 by Barton-Aschman Associates Inc.
Go to TOP
 
Hurricane 1995
  1. Dade County Transportation System Hurricane Emergency Preparedness Study 1995 by PBSJ (Post Buckley Schuh & Jernigan)
    Download above document at SkyDrive.
  2. Post Hurricane Short Range Transportation Study - West Dade Area Task, Technical Memorandum A: Existing Transportation Conditions, Draft, 2/1995 by Barton-Aschman Associates Inc.
  3. Post Hurricane Short Range Transportation Study - West Dade Area Task: Final Recommendation, 8/1995 by Barton-Aschman Associates Inc.
  4. Transportation System Hurricane Emergency Preparedness Study, Appendix 2B, 4/1995 by PBSJ (Post Buckley Schuh & Jernigan)
Go to TOP
 
Intermodal & Multimodal 1985-1995
  1. Airport - Seaport Rail Connection and Airport Multimodal Facility Status Report, 1/1992 by Miami-Dade
    Download above document at SkyDrive.
  2. Feasibility Study, Northside Intermodal Terminal, 2/1986 by MDTA (Miami-Dade Transit Agency)
    Download above document at SkyDrive.
  3. Golden Glades Multimodal Transportation Facility Feasibility Study, Executive Summary, 3/1994 by ICF Kaiser
    Download above document at SkyDrive.
  4. Golden Glades Multimodal Transportation Facility Feasibility Study, Final Report, 3/1994 by ICF Kaiser
    Download above document at SkyDrive.
  5. Golden Glades Multimodal Transportation Facility Feasibility Study, Project No. MPO-92-4, 3/1993 by ICF Kaiser
  6. Golden Glades Multimodal Transportation Facility, Executive Summary  by DMJM+Harris
Go to TOP
 
Intermodal & Multimodal 1996-Present
  1. City of South Miami Hometown Intermodal Transportation Study, Final Report, 8/2002 by Kimley-Horn & Associates
    Download above document.
  2. Golden Glades Multimodal Transportation Facility, Technical Memorandum #2 Transportation Study, 2/2001 by Frederic R Harris (FRH); Sanchez-Zeinali and Associates, Inc.
    Download above document at SkyDrive.
  3. I-95 Multimodal Transportation Corridor Study, Executive Summary 2000 by Kimley-Horn & Associates
    Download above document at SkyDrive.
  4. Miami Beach Intermodal Feasibility Study 2000 by Corradino/PBQD
  5. Miami Beach Intermodal Feasibility Study, Executive Summary 2000 by Corradino/PBQD
  6. Miami Beach Intermodal Feasibility Study, Task II Technical Memorandum: Marketing Analysis, 10/2000 by Corradino/PBQD
  7. South Miami Intermodal Transportation Study, 6/2001 by Gannett Fleming
    Download above document.
Go to TOP
 
ITS
  1. Automatic Vehicle Location for Measurement of Corridor Level-of-Service: The Miami Method, 9/1994 by CUTR (Center for Urban Transportation Research)
  2. Fiber-Optic Communications Concept Plan for Dade County's Intelligent Transportation Infrastructure, 6/1998 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  3. Fiber-Optic Communications Concept Plan For Dade County's Intelligent Transportation Infrastructure, Executive Summary 1998 by CUTR (Center for Urban Transportation Research)
  4. Intelligent Transportation System (ITS) Plan Update for Miami-Dade County, 6/1999 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  5. Intelligent Transportation System Plan for Dade County, 7/1996 by Miami-Dade MPO
    Download above document at SkyDrive.
  6. Intelligent Transportation Systems, 2002 Annual Report of Countywide Efforts by Agency, 8/2002 by Miami-Dade MPO
  7. Intelligent Transportation Systems, 2003 Annual Report of Countywide Efforts by Agency, 8/2003 by Miami-Dade MPO
  8. Intelligent Transportation Systems, 2004 Annual Report of Countywide Efforts by Agency, 8/2004 by Miami-Dade MPO
    Download above document.
  9. Intelligent Transportation Systems, 2005 Annual Report of Countywide Efforts by Agency, 8/2005 by Miami-Dade MPO
    Download above document.
  10. Intelligent Transportation Systems, 2006 Annual Report of Countywide Efforts by Agency, 8/2006 by Miami-Dade MPO
    Download above document.
  11. Interactive Transportation Information Stations, 12/1997 by CUTR (Center for Urban Transportation Research)
  12. ITS Operations Center Quarterly, 6/1998 by Frederic R Harris (FRH)
  13. Key Findings From The Intelligent Transportation Systems (ITS) Program, What Have We Learned?, 9/1996 by USDOT/FHWA
  14. Moving Transportation Into The Information Age  by FDOT (Florida Dept. of Transportation)
  15. Traffic Radio Feasibility Study, 6/2001 by Fierro & As
  16. Transportation Management Center (TMC) Functionality Study, Final Report, 12/2001 by CUTR (Center for Urban Transportation Research)
  17. What is ITS?  by ITS America
Go to TOP
 
Jitneys
  1. Jitney Enforcement Strategies, 6/1994 by CUTR (Center for Urban Transportation Research)
  2. Jitney Enforcement Strategies Experience In Dade County, Technical Memorandum Number 1, Draft Report, 1/1994 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  3. Jitney Enforcement Strategies Experience In Other Cities, Technical Memorandum No. 2: Final Report, 12/1993 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  4. Jitney Services Pilot Program Study, Executive Summary  by Miller Consulting, Inc.
  5. The Miami Jitneys, 8/1992 by Urban Mobility Corporation; KPMG Peat Marwick
    Download above document at SkyDrive.
  6. Transit Corridors Transitional Study, Jitney Report, 7/1992 by Carr Smith Associates
    Download above document at SkyDrive.
  7. Transit Corridors Transitional Study, Jitney Report, Appendix B, #1, 7/1992 by Carr Smith Associates
    Download above document at SkyDrive.
  8. Transit Corridors Transitional Study, Jitney Report, Appendix B, #2, 7/1992 by Carr Smith Associates
    Download above document at SkyDrive.
Go to TOP
 
Land Use 1994-2004
  1. Florida City DRI - Pre-Application Summary, Draft, 3/2004 by South Florida Regional Planning Council (SFRPC)
  2. Hialeah Transportation Concurrency Management Areas, 3/2003 by The Corradino Group
  3. Model Land Development & Subdivision Regulations That Support Access Management For Florida Cities And Counties, 1/1994 by CUTR/FDOT
  4. Pre-Application Materials for Florida City Development of Regional Impact, 2/2004
  5. Pre-Application Summary Materials for Flagler Station, 6/2003 by Flagler Development Company
  6. Providence: A Planned New Town Development, Pre-Application Summary Materials, 4/2004 by Curtis & Kimball
  7. Transportation And Land Use Connection: Report On The Creation Of A Prototype Visualization Tool Based On Best Practices, 6/1999 by FAU/FIU Joint Center For Environmental & Urban Problems
  8. Transportation And Land Use Study Committee, Final Report, 1/1999
Go to TOP
 
Land Use 2005-Current
  1. Franjo Triangle, Commercial Island District Ordinance, 6/2005 by Miami-Dade County, Miami-Dade MPO, Village of Palmetto Bay
Go to TOP
 
Legislation / Regulation
  1. A Guide To Metropolitan Transportation Planning Under ISTEA, How The Pieces Fit Together 1995 by USDOT (United States Dept. of Transportation); NTL (National Transportation Library)
    Download above at National Transportation Library.
  2. Federal Register, Parts III, IV, and V, 5/2000 by USDOT (United States Dept. of Transportation)
    Download above document at SkyDrive.
  3. Intermodal Surface Transportation Efficiency Act, Flexible Funding Opportunities For Transportation Investments, 3/1995 by USDOT (United States Dept. of Transportation); FHWA (Federal Highway Administration)
    Download above at National Transportation Library.
  4. ISTEA, Intermodal Surface Transportation Efficiency Act of 1991 1991 by United States Congress; NTL (National Transportation Library)
    Download above at National Transportation Library.
  5. Metropolitan Transportation Planning Under ISTEA: The Shape Of Things To Come 1997 by USDOT (United States Dept. of Transportation); Volpe Center
    Download above document at SkyDrive.
  6. Miami-Dade County, Office of Public Transportation Management, FY 2004 Federal Legislative Package 2004 by Office of Public Transportation Management (OPTM)
  7. TEA-21 Fact Sheets, 8/1998 by USDOT (United States Dept. of Transportation); FHWA (Federal Highway Administration)
    Download above at Federal Highway Administration.
  8. Title VI Civil Rights Act of 1964 1995 Report, Response to UMTA Circular 4702.1, Draft, 3/1995 by Metro-Dade Transit Administration
    Download above document at SkyDrive.
  9. Transportation Equity Act for the 21st Century, Preliminary, 6/1998 by APTA
Go to TOP
 
LRTP 2000
  1. 2000 Up-Date Supplemental Report, S-1, Recommended Staging Of Implementation, 12/1978 by Miami-Dade MPO Download above document at SkyDrive.
  2. MUATS Year 2000 Plan Update, Interim Report II: Existing Ground Transportation Conditions, 9/1975 by Miami-Dade MPO
  3. Proposed Transportation Master Plan For Dade County, A Summary, 2/1969 by MDC Planning Department
    Download above document at SkyDrive.
  4. Transportation Plan For Metropolitan Dade County, Florida, Long Range Element, Final Report, 4/1979 by Miami-Dade MPO
    Download above document at SkyDrive.
Go to TOP
 
LRTP 2005
  1. Long Range Element of The Year 2005, Metro-Dade Transportation Plan and Improvement Priorities, Revised, 6/1985 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Metro-Dade Transportation Plan and Improvement Priorities, Long Range Element (to the Year 2005), Revised, 11/1987 by Miami-Dade MPO
    Download above document at SkyDrive.
  3. Metro-Dade Transportation Plan and Improvement Priorities, Long Range Element (to the Year 2005), Revised, 11/1988 by Miami-Dade MPO
    Download above document at SkyDrive.
  4. Metro-Dade Transportation Plan and Improvement Priorities, Long Range Element (to the Year 2005), Updated, 7/1987 by Miami-Dade MPO
    Download above document at SkyDrive.
  5. Metro-Dade Transportation Plan Update Project, Working Paper No. 2: Baseline Travel Projections Years 1990 & 2005, 8/1983 by Miami-Dade MPO
  6. Metro-Dade Transportation Plan Update Project, Working Paper No. 2: Baseline Travel Projections Years 1990 & 2005, 12/1983 by FDOT (Florida Dept. of Transportation)
    Download above document at SkyDrive.
  7. Year 2005 Metro-Dade Transportation Plan, 1984 Update, Volume I, Final Draft, 9/1984 by Miami-Dade MPO
    Download above document at SkyDrive.
Go to TOP
 
LRTP 2010
  1. Dade County 2010 LRP Node Coordinates 1993 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Long Range Transportation Plan Update, 1990 and 1993 Highway and Transit Networks, 4/1994 by Gannett Fleming; Frederic R Harris Inc
    Download above document at SkyDrive.
  3. Metro-Dade Transportation Plan and Improvement Priorities Long Range Element 2010, 10/1990
  4. Metro-Dade Transportation Plan and Improvement Priorities, Long Range Element (to the Year 2010), 11/1990 by Miami-Dade MPO
    Download above document at SkyDrive.
  5. Metro-Dade Transportation Plan and Improvement Priorities, Long Range Element (to the Year 2010), 11/1991 by Miami-Dade MPO
  6. Metro-Dade Transportation Plan and Improvement Priorities, Long Range Element (to the Year 2010), Amended, 11/1992 by Miami-Dade MPO
  7. Metro-Dade Transportation Plan and Improvement Priorities, Long Range Element (to the Year 2010), Amended, 11/1993 by Miami-Dade MPO
    Download above document at SkyDrive.
  8. Year 2010 Metro-Dade Transportation Plan, Countywide And Individual Area Summaries, Technical Memorandum #8 1991 by Miami-Dade MPO
    Download above document at SkyDrive.
Go to TOP
 
LRTP 2010 Model Validation
  1. Miami Urban Area Transportation Study (MUATS) 2010 Plan Update, Technical Memorandum: Directional Trip Distribution, 10/1989 by Gannett Fleming; Spillman Boatman & Associates; Urban Analysis Group
    Download above document at SkyDrive.
  2. Miami Urban Area Transportation Study (MUATS), Model Validation And Year 2010 Plan Update, Appendices For Technical Report 2, 10/1989 by Gannett Fleming; Spillman Boatman & Associates; Urban Analysis Group
    Download above document at SkyDrive.
  3. Miami Urban Area Transportation Study (MUATS), Model Validation And Year 2010 Plan Update, Technical Memorandum Financial Resources, 10/1989 by Gannett Fleming
    Download above document at SkyDrive.
Go to TOP
 
LRTP 2015
  1. 2015 Metro-Dade Transportation Plan Long Range Element, Federal Review Edition, 12/1995 by Miami-Dade MPO Download above document at SkyDrive.
  2. 2015 Metro-Dade Transportation Plan Long Range Element, Needs Plan and Recommended Cost Feasible Plan, 12/1995 by Miami-Dade MPO
    Download above document at SkyDrive.
  3. 2015 Transportation Plan, Countywide Summary, 5/1995 by Miami-Dade MPO
    Download above document at SkyDrive.
  4. Long Range Transportation Plan Update, Steering Committee, Meeting No. 9, 8/1994 by Gannett Fleming
    Download above document at SkyDrive.
  5. Long Range Transportation Plan Update, Transportation Planning Council Meeting, 9/1994 by Gannett Fleming
    Download above document at SkyDrive.
Go to TOP
 
LRTP 2015 Model Validation (Box 1)
  1. Long Range Transportation Plan Update, Steering Committee, Meeting No. 4, 2/1994 by Gannett Fleming
  2. Long Range Transportation Plan Update, Technical Memorandum: Directional Trip Distribution, 2/1995 by Gannett Fleming
  3. Long Range Transportation Plan Update, Technical Memorandum: Directional Trip Distribution, 2/1996 by Gannett Fleming
  4. Long Range Transportation Plan Update, Technical Report No. 1: Data Compilation And Review Data Supplement, 10/1994 by Gannett Fleming
    Download above document at SkyDrive.
Go to TOP
 
LRTP 2015 Model Validation (Box 2)
  1. Long Range Transportation Plan Update, Technical Report No. 2, Model Validation - Year 1990, 12/1995 by Gannett Fleming
    Download above document at SkyDrive.
  2. Long Range Transportation Plan Update, Technical Report No. 2, Model Validation - Year 1990, Appendix, 12/1995 by Gannett Fleming
    Download above document at SkyDrive.
  3. Metro-Dade Transportation Plan to the Year 2015, Recommended Cost Feasible Plan, Technical Report No. 3…, 12/1995 by Gannett Fleming
    Download above document at SkyDrive.
Go to TOP
 
LRTP 2020
  1. 2020 Transportation Plan Long Range Element Update, 5/2000 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. 2020 Transportation Plan Long Range Element, Adoption Document, 12/1998 by Miami-Dade MPO
    Download above document at SkyDrive.
  3. 2020 Transportation Plan Long Range Element, Adoption Document Mockup of Draft Under Development, 12/1998 by Miami-Dade MPO
  4. 2020 Transportation Plan: The Beach and Central Business District (CBD) Area, Draft, 12/1998 by Miami-Dade MPO
    Download above document at SkyDrive.
  5. 2020 Transportation Plan: The Central Area, Draft, 12/1998 by Miami-Dade MPO
    Download above document at SkyDrive.
  6. 2020 Transportation Plan: The North Area, Draft, 12/1998 by Miami-Dade MPO
    Download above document at SkyDrive.
  7. 2020 Transportation Plan: The Northwest Area, Draft, 12/1998 by Miami-Dade MPO
    Download above document at SkyDrive.
  8. 2020 Transportation Plan: The South Area, Draft, 12/1998 by Miami-Dade MPO
    Download above document at SkyDrive.
  9. 2020 Transportation Plan: The West Area, Draft, 12/1998 by Miami-Dade MPO
    Download above document at SkyDrive.
Go to TOP
 
LRTP 2025
  1. 2025 MDTP: Miami-Dade Transportation Plan for the Year 2025, Adoption Document, 12/2001 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Miami Urban Area Transportation Study (MUATS) & Year 2025 Plan Update, Draft, 9/2001 by Gannett Fleming
  3. Miami Urban Area Transportation Study (MUATS) and Year 2025 Plan Update, 1999 Socioeconomic Data, 2/2001 by Miami-Dade MPO
    Download above document at SkyDrive.
  4. Miami Urban Area Transportation Study (MUATS) and Year 2025 Plan Update, 1999 Socioeconomic Data, 2/2001 by Miami-Dade MPO
  5. Miami-Dade Transportation Plan to the Year 2025 brochure 2001 by Miami-Dade MPO
    Download above document at SkyDrive.
  6. Notice to Professional Consultants: Metropolitan Planning Organization Long Range Transportation Plan Update, E02-MPO-02, 10/2002 by The Corradino Group
  7. Presentation for the Long Range Transportation Plan Update, Project No. E02-MPO-02, 1/2002 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  8. Presentation for the Long Range Transportation Plan Update, Project No. E02-MPO-02, 1/2003 by Gannett Fleming; Paco Group; Public Financial Management; Media Relations Group
Go to TOP
 
LRTP 2030
  1. 2030 Long-Range Transportation System Plan for Miami-Dade County  by The Corradino Group; PMG Associates, Inc.; CommuniKatz, Inc.
  2. 2030 LRTP Interim Review Support, Miami-Dade County Historical LRTP Data Review, Draft, 5/2007 by Gannett Fleming
  3. Miami-Dade MPO Long Range Transportation Plan Update to 2030: Financial Resources Review, Revised Draft, 4/2004 by Public Financial Management
  4. Miami-Dade Transportation Plan (to the Year 2030), 12/2004 by Gannett Fleming
    Download above document.
  5. Miami-Dade Transportation Plan (to the Year 2030) Data Compilation, Review, and Development, 12/2004 by Gannett Fleming; Paco Group; Public Financial Management;  Media Relations Group
  6. Miami-Dade Transportation Plan (to the Year 2030), Air Quality Conformity Determination Summary, Final Draft, 10/2004 by Gannett Fleming
  7. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter Beach/CBD, Summer 2004 by Miami-Dade MPO
  8. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter Central, Summer 2004 by Miami-Dade MPO
  9. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter North, Summer 2004 by Miami-Dade MPO
  10. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter Northwest, Summer 2004 by Miami-Dade MPO
  11. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter South, Summer 2004 by Miami-Dade MPO
  12. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter West, Summer 2004 by Miami-Dade MPO
  13. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter, Autumn 2004 by Miami-Dade MPO
  14. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter, Summer 2004 by Miami-Dade MPO
  15. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter, Summer, Haitian Creole Edition 2004 by Miami-Dade MPO
  16. Miami-Dade Transportation Plan to the Year 2030 Get Involved Newsletter, Summer, Spanish Edition 2004 by Miami-Dade MPO
  17. Miami-Dade Transportation Plan to the Year 2030 Long Range Element Brochure 2004 by Miami-Dade MPO
  18. Miami-Dade Transportation Plan Update to the Year 2030 Air Quality Conformity Determination Report, 12/2004 by Gannett Fleming; Paco Group; Public Financial Management; Media Relations Group
  19. Transport 2030, Smarter. Faster. Easier. 2003 by Gannett Fleming
Go to TOP
 
LRTP 2035
  1. Interim Review Support, A Blue Print for Short Term Transportation Service Improvements in Miami-Dade County, 3/2010 by Gannett Fleming
  2. Miami-Dade 2035 Long Range Transportation Plan Executive Summary (with CD), 10/2009 by Gannett Fleming
    Download above document.
  3. Miami-Dade 2035 Long Range Transportation Plan Final Report, 10/2009 by Gannett Fleming
    Download above document at the LRTP 2035 website.
Go to TOP
 
Modeling
  1. Design Traffic Procedure (Traffic Forecasting and 18 KIP Equivalent Single Axle Load), 6/1994 by FDOT (Florida Dept. of Transportation)
  2. FSUTMS ZDATA2 Development Process, Technical Memorandum 3: Land Use Allocation Methodologies and Their Applicability in Florida, Draft, 5/1996 by Transportation Planning Services, Inc.
  3. Integrated Transit Demand & Supply Modeling Using Comprehensive Travel Behavior Data, Phase 1: Activity-based Travel Survey, Survey Instrument version 1.1, 8/1997 by University of Florida
  4. Integrated Transit Demand & Supply Modeling Using Comprehensive Travel Behavior Data, Technical Memorandum II: Survey Design and Model Development, 12/1997 by University of Florida
  5. Long Range Transportation Plan Update, Modeling Workshop 1994 by Miami-Dade MPO
  6. Miami-Dade MPO Cube Voyager FSUTMS Model, User's Guide, 9/2008 by The Corradino Group
    Download above document.
  7. State Of The County [1997-2006] Report (Transportation Systems Performance Monitoring Study), 11/2008 by Gannett Fleming
    Download above document.
  8. Transportation Systems Performance Monitoring Study, 11/2008 by Gannett Fleming
    Download above document.
Go to TOP
 
Modeling: Southeast Regional
  1. Southeast Florida Regional Travel Characteristics Study, Technical Memorandum No. 1: Survey Management Plan, 10/1998 by Carr Smith Associates
  2. Southeast Florida Regional Travel Characteristics Study, Technical Memorandum No. 2: Public Awareness Campaign, 10/1998 by Carr Smith Associates
  3. Southeast Regional Planning Model IV, Users Manual: PC-X32 Version, 9/1997 by Carr Smith Associates
  4. Southeast Regional Planning Model Workshop, Participant's Workbook, 11/1997 by Carr Smith Associates
Go to TOP
 
Modeling: Stage 1 Rapid Transit
  1. Mode Choice Model Patronage Forecasts (TIP Stage 1 Rapid Transit System), 6/1978 by Kaiser Transit Group
  2. Mode Choice Model User's Manual (TIP Stage 1 Rapid Transit System), 7/1978 by Kaiser Transit Group
  3. Prime Modal Split Model Recalibration Report (TIP Stage 1 Rapid Transit System), 12/1978 by Kaiser Transit Group
Go to TOP
 
MUATS (Pre-LRTP)
  1. Commercial Model Development for Transportation Planning, Miami Urban Area Transportation Study, 11/1968 by MDC Planning Department for the MUATS
    Download above document at SkyDrive.
  2. Controversial Corridors Review: Recommended Transportation Alternatives, 10/1974 by MDC Planning Department
    Download above document at SkyDrive.
  3. Metro-Dade Transportation Plan: Special Report 1, Transportation Needs and Resources in Dade County: The Widening Gap, 10/1982 by Metro-Dade Transportation Administration
    Download above document at SkyDrive.
Go to TOP
 
Municipal Master Plans 1996-2000
  1. City of Miami Beach Municipal Mobility Plan, Implementation Study, Executive Summary 1999 by Corradino
    Download above document at SkyDrive.
  2. City of Miami Beach Municipal Mobility Plan, Vision Statement 1998 by Corradino
    Download above document at SkyDrive.
  3. LeJeune Road Corridor Traffic Impact Study, Miami Springs, Florida, Draft Final Report, 7/1996 by Kimley-Horn & Associates
    Download above document at SkyDrive.
  4. Miami Beach Municipal Mobility Plan Project Bank, 5/1999 by Corradino
  5. Miami Beach Municipal Mobility Plan, Existing Traffic Conditions Interim Report, 12/1997 by Carr Smith Associates/Corradino
  6. Traffic Engineering Analysis, LeJeune Road, Miami Springs, Florida, Existing Conditions, 1/1996 by Kimley-Horn & Associates
    Download above document at SkyDrive.
Go to TOP
 
Municipal Master Plans 2001-2005
  1. City of Homestead Downtown Area Transportation Plan Update Final Report, 3/2005 by Metric Engineering Inc.
  2. City of Homestead, Florida, Comprehensive Plan, Part 1: Goals, Objectives and Policies, Adopted Plan, 4/2001 by HBI Planning Services, Inc; City of Homestead
  3. City of North Miami Beach Community Mobility Program, Project Bank and Work Plan, 10/2003 by Chatterton Consulting
  4. Homestead's 2001 Comprehensive Plan for Quality Community Growth, Part 2: Data and Analysis, Approved Documents, 4/2001 by Iler Planning Group; City of Homestead
  5. Town of Miami Lakes Transportation Master Plan, 2/2004 by Kimley-Horn & Associates
Go to TOP
 
Municipal Master Plans 2006-2012
  1. City of Doral 2010 Transportation Master Plan 2010 by The Corradino Group
    Download above document.
  2. City of Doral Transportation Master Plan, Executive Summary, 11/2006 by The Corradino Group
  3. City of Miami Gardens Transportation Master Plan, 5/2006 by The Corradino Group
  4. City of Miami Gardens Transportation Master Plan, Executive Summary, 3/2006 by The Corradino Group
  5. Coastal Communities Transportation Master Plan, Final Report, 5/2007 by The Corradino Group
Go to TOP
 
Parking 1980-1999
  1. Countywide Parking Policy Study for Dade County Final Technical Memorandum No. 1, Public Involvement Program, 5/1996 by Bermello, Ajamil & Partners, Inc.; Barton- Aschman Associates, Inc.
    Download above document at SkyDrive.
  2. Countywide Parking Policy Study for Dade County, Final Technical Memorandum No. 2-B, User Survey Results and Analysis, 10/1996 by Bermello, Ajamil & Partners, Inc.; Barton-Aschman Associates, Inc.
    Download above document at SkyDrive. 
  3. Countywide Parking Policy Study for Miami-Dade County (Project No. E95-MPO-02R), Executive Summary Report, 10/1999 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive. 
  4. Countywide Parking Policy Study for Miami-Dade County, Final Report, 8/1999 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive. 
  5. Countywide Parking Policy Study Presentation 1996 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  6. Dade County Parking/Transit Ridership Study, Final Report for The Parking Task Force, 1/1987 by KT Analytics, Inc.
    Download above document at SkyDrive. 
  7. Economic Impact Of Parking Policy Options, Final Report, 10/1986 by Zuchelli, Hunter & Associates
    Download above document at SkyDrive. 
  8. Parking Impact Report, 5/1988 by MDTA (Miami-Dade Transit Agency)
    Download above document at SkyDrive.
  9. Snapper Creek Park and Ride Feasibility Study Final Report, 1/1999 by Dames & Moore Group
    Download above document at SkyDrive.
  10. South Beach Parking Study (Project #94119), 8/1994 by David Plummer & Associates (DPA)
    Download above document at SkyDrive.
Go to TOP
 
Parking 2000-Present
  1. Miami-Dade County 2005 Park and Ride Lot Plan, 12/2005 by Gannett Fleming
    Download above document at SkyDrive.
  2. Miami-Dade Countywide Consolidated Park-and-Ride Facilities Plan, 10/2010 by David Plummer & Associates (DPA)
    Download the above document.
Go to TOP
 
Parking: CUTR Studies 1993-1994
  1. Countywide Parking Policy Study, Executive Summary, 12/1994 by CUTR (Center for Urban Transportation Research); USF (University of South Florida)
    Download above document at SkyDrive.
  2. Countywide Parking Policy Study, Literature and Regulations Review, Final Report, 12/1994 by CUTR (Center for Urban Transportation Research); USF (University of South Florida)
    Download above document at SkyDrive.
  3. Parking And Transit Policy Study, Executive Summary, Revised, 12/1993 by CUTR (Center for Urban Transportation Research); USF (University of South Florida)
    Download above document at SkyDrive.
  4. Parking And Transit Policy Study, Technical Memorandum No. 1: Overview Of Urban Transit And Parking Policies, 5/1993 by CUTR (Center for Urban Transportation Research); USF (University of South Florida)
    Download above document at SkyDrive.
  5. Parking And Transit Policy Study, Technical Memorandum No. 2: Evaluation Of Parking And Transit Policies, 5/1993 by CUTR (Center for Urban Transportation Research); USF (University of South Florida)
    Download above document at SkyDrive.
  6. Parking And Transit Policy Study, Technical Memorandum No. 3: Issues And Recommendations, 6/1993 by CUTR (Center for Urban Transportation Research); USF (University of South Florida)
    Download above document at SkyDrive.
Go to TOP
 
Parking: Park&Ride 1992
  1. Countywide Park And Ride Planning Study for Dade County, Handout Materials, 7/1992
  2. Park & Ride Lots Planning Study, Working Paper #1: Site Location Evaluation, 4/1992 by Frederic R Harris (FRH)
  3. Park & Ride Lots Planning Study, Working Paper #2: Demand Estimation And Facility Site Size Estimation, 6/1992 by Frederic R Harris (FRH)
  4. Park & Ride Lots Planning Study, Working Paper #3: Impact Statement, 7/1992 by Frederic R Harris (FRH)
  5. Park & Ride Lots Planning Study, Working Paper #4: Economics Analysis, 10/1992 by Frederic R Harris (FRH)
Go to TOP
 
Parking: Park&Ride 1993
  1. Dade County Park & Ride Lot Plan, 7/1993 by Frederic R Harris (FRH)
  2. Dade County Park & Ride Lot Plan, Justification Report: Miami Beach Corridor Park and Ride Lots 1993 by Frederic R Harris (FRH)
  3. Dade County Park & Ride Lot Plan, Justification Report: North Dade County, NW 27th Avenue Corridor Park and Ride Lots 1993 by Frederic R Harris (FRH)
  4. Dade County Park & Ride Lot Plan, Justification Report: Northeast Dade County, Biscayne Boulevard Corridor Park and Ride Lots 1993 by Frederic R Harris (FRH)
  5. Dade County Park & Ride Lot Plan, Justification Report: South Dade, South Dixie Highway Busway Park And Ride Lots 1993 by Frederic R Harris (FRH)
  6. Dade County Park & Ride Lot Plan, Justification Report: West Dade County Corridor Park and Ride Lots 1993 by Frederic R Harris (FRH)
  7. Excerpts From The Dade County Park & Ride Lot Plan And Justification Reports, 3/1993 by Frederic R Harris (FRH)
Go to TOP
 
Planning Reviews
  1. A Review of the Long-Range Transportation Plans for Florida's Metropolitan Planning Organizations, 8/1997 by CUTR (Center for Urban Transportation Research)
  2. Building the Transportation System of the Future, Summary of Major Activities 1997-1998 1998 by Miami-Dade MPO
  3. Dade County Transportation Authority Evaluation Report, 2/1994
  4. Enhanced Planning Review Of The Miami Metropolitan Area, Final Report, 5/1996 by USDOT (United States Dept. of Transportation)
  5. General Transportation Planning Consultant Services, Project No. E02-MPO-01, 8/2002 by Marlin Engineering, Inc.
  6. General Transportation Planning Consulting Services (E02-MPO-01), 8/2002 by PBSJ (Post Buckley Schuh & Jernigan)
  7. General Transportation Planning Consulting Services, DPA Project #02181, 8/2002 by David Plummer & Associates (DPA)
Go to TOP
 
Prospectus
  1. Prospectus for Transportation Improvements Draft, 6/1977 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Prospectus for Transportation Improvements, 2nd Edition, 9/1983 by Miami-Dade MPO
  3. Prospectus for Transportation Improvements, 3rd Edition Revised, 1/1989 by Miami-Dade MPO
    Download above document at SkyDrive.
  4. Prospectus for Transportation Improvements, 4th Edition Revised, 3/1994 by Miami-Dade MPO
    Download above document at SkyDrive.
  5. Prospectus for Transportation Improvements, 5th Edition Revised, 3/1995 by Miami-Dade MPO
    Download above document at SkyDrive.
  6. Prospectus for Transportation Improvements, 6th Edition Revised, 4/1998 by Miami-Dade MPO
  7. Prospectus for Transportation Improvements, 7th Edition Revised, 10/1999
  8. Prospectus for Transportation Improvements, January 2004 Update, 1/2004 by Miami-Dade MPO
  9. Public Involvement Appendix to Prospectus for Transportation Improvements, 12/1977 by Miami-Dade MPO
  10. Public Involvement Appendix to Prospectus for Transportation Improvements, 3/1978 by Miami-Dade MPO
  11. Prospectus for Transportation Improvements Draft, 6/1977 by Miami-Dade MPO
    Download above document at SkyDrive.
Go to TOP
 
Public Involvement
  1. Preliminary Report on the 2020 Long Range Transportation Plan (LRTP) Public Information Workshops, 5/2000 by Miami-Dade MPO
  2. Public Involvement Activities for the 2003-2007 Transportation Improvement Program (TIP) and Its Air Quality Conformity Determination Report (CDR) 2003 by Miami- Dade MPO
  3. Public Involvement Effectiveness Evaluation Program, 11/2001 by Gannett Fleming
    Download above document.
  4. Public Involvement Process, 2/1995
    Download above document at SkyDrive.
  5. Telephone Survey for NW 25th Street PD&E Study, 10/1996 by Marlin Engineering
Go to TOP
 
Public-Private Partnership
  1. Downtown Miami Baseball Stadium Transportation Assessment Study, 3/2001 by Gannett Fleming
    Download above document at SkyDrive.
  2. Feasibility Study: A Public-Private Partnership for Transit Vehicle Purchasing and Leasing, 1/1999 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  3. Public-Private Transit Feasibility Study, Technical Memorandum 1: Review Of Guidelines, Rules And Regulations, 3/1999 by PAWA
    Download above document at SkyDrive.
  4. Public-Private Transit Feasibility Study, Technical Memorandum 3: Alternative Development & Initial Service Recommendation, 2/1999 by PAWA
Go to TOP
 
Railroads
  1. 1996 Florida Rail System Plan, 12/1996 by Wilbur Smith Associates
    Download above document at SkyDrive.
  2. 2002 Florida Rail System Plan 2002 by Wilbur Smith Associates
  3. Railroad Rights-Of-Way Assessment, 8/1993 by ICF Kaiser Engineers
    Download above document at SkyDrive.
  4. Railroad/Highway Grade Separation Study, Data Collection Report, 2/1992 by Frederic R Harris (FRH)
Go to TOP
 
Regional Plans 1965-1999
  1. Eastward Ho! Development Futures: Paths to More Efficient Growth in Southeast Florida, 2/1999 by Rutgers University
  2. Proposed Islandia-North Key Largo Causeway and Parkway, 7/1965 by Wilbur Smith Associates
  3. Regional Plan for South Florida, 6/1987 by South Florida Regional Planning Council (SFRPC)
  4. Regional Plan for South Florida, 8/1991
    Download above document at SkyDrive.
Go to TOP
 
Regional Plans 2000-Present
  1. I-95 Managed Lanes Traffic and Revenue Study Summary of Findings, 3/2006 by Wilbur Smith Associates
  2. Miami-Dade County and the Upper and Middle Keys, Park and Ride Lot Plan, 12/2005 by Gannett Fleming
    Download above document at SkyDrive.
  3. Transportation Demands of the 21st Century: A Look to the Future- Possible Paths Forward, 10/2009 by CUTR (Center for Urban Transportation Research)
    Download above document.
  4. Transportation Demands of the 21st Century: A Look to the Future- Possible Paths Forward Executive Summary, 10/2009 by CUTR (Center for Urban Transportation Research)
    Download above document.
Go to TOP
 
Safety / Emergency
  1. Continuity Of Operations (COOP), 3/2004 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Continuity Of Operations Plan, 3/2005 by Miami-Dade MPO
    Download above document at SkyDrive.
  3. Continuity Of Operations Plan, 3/2006 by Miami-Dade MPO
    Download above document at SkyDrive.
  4. Continuity Of Operations Plan, 3/2008 by Miami-Dade MPO
    Download above document at SkyDrive.
  5. Metropolitan Dade County Emergency Operations Plan Section 1 Hurricane Procedure, 6/1984 by Metro-Dade County
  6. Simulation and Analysis of Potential Mass Evacuation of Miami-Dade Residents, 6/2007 by Gannett Fleming
  7. Traffic Signs Research Study for Miami-Dade County, Final Report 2006 by CUTR (Center for Urban Transportation Research)
    Download above document.
Go to TOP
 
Seaport
  1. Feasibility & Cost Study of Tunnel Alternatives for Vehicular Access to Port of Miami, 5/1983 by PBSJ (Post Buckley Schuh & Jernigan); Singstad, Hurka & Associates, P.C.
    Download above document at SkyDrive.
  2. Intermodal Connectivity in the Atlantic Commerce Corridor: An Assessment of Seaport, Rail, and Other Regional..., Executive Summary of Findings, 11/2003 by CH2MHill; J.D. Sanchez Consulting, Inc.
  3. Port of Miami City Street Improvements, 9/2000 by Beiswenger, Hoch and Associates, Inc.
    Download above document at SkyDrive.
  4. Port Of Miami Master Development Plan 1988 by PBSJ (Post Buckley Schuh & Jernigan)
  5. Port Of Miami Tunnel & Access Improvements PD&E Study, 10/1994 by PBSJ (Post Buckley Schuh & Jernigan)
    Download above document at SkyDrive.
  6. Strategic Investment Plan to Implement The Intermodal Access Needs Of Florida's Seaports (Landside Access Study), Final Report, 6/1997 by PBSJ (Post Buckley Schuh & Jernigan)
    Download above document at SkyDrive.
Go to TOP
 
TDM / TSM
  1. Current Efforts in Transportation Demand Management and Tools for its Implementation in Dade County, 3/1992 by Barton-Aschman Associates Inc.
  2. Northwest 25th Street Travel Demand Alternatives Analysis Report, Project Development & Environmental Study, 7/1997 by FDOT, Marlin Engineering
  3. Northwest 25th Street Travel Demand Study Report, Project Development & Environmental Study, 1/1997 by FDOT, Marlin Engineering
  4. TDM Modeling: Techniques And Tools, 12/1996 by Eric N. Schreffler
Go to TOP
 
TIP 1977-1985
  1. Transportation Improvement Program (TIP) 1978 by Miami-Dade MPO
  2. Transportation Improvement Program (TIP) 1979 by Miami-Dade MPO
    Download above document at SkyDrive.
  3. Transportation Improvement Program (TIP) 1980 by Miami-Dade MPO
  4. Transportation Improvement Program (TIP) 1981 by Miami-Dade MPO
  5. Transportation Improvement Program (TIP) 1982 by Miami-Dade MPO
  6. Transportation Improvement Program (TIP) 1983 by Miami-Dade MPO
  7. Transportation Improvement Program (TIP) 1984 by Miami-Dade MPO
  8. Transportation Improvement Program (TIP) 1985 by Miami-Dade MPO
Go to TOP
 
TIP 1986-1990
  1. Transportation Improvement Program (TIP) 1986 by Miami-Dade MPO
  2. Transportation Improvement Program (TIP) 1987 by Miami-Dade MPO
  3. Transportation Improvement Program (TIP) 1988 by Miami-Dade MPO
  4. Transportation Improvement Program (TIP) 1989 by Miami-Dade MPO
  5. Transportation Improvement Program (TIP) 1990 by Miami-Dade MPO
Go to TOP
 
TIP 1991-1995
  1. Transportation Improvement Program (TIP) 1991 by Miami-Dade MPO
  2. Transportation Improvement Program (TIP) 1992 by Miami-Dade MPO
  3. Transportation Improvement Program (TIP) 1993 by Miami-Dade MPO
  4. Transportation Improvement Program (TIP) 1994 by Miami-Dade MPO
  5. Transportation Improvement Program (TIP) 1995 by Miami-Dade MPO
Go to TOP
 
TIP 1996-1999
  1. Transportation Improvement Program (TIP) 1996 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Transportation Improvement Program (TIP) 1997 by Miami-Dade MPO
    Download above document at SkyDrive.
  3. Transportation Improvement Program (TIP) 1998 by Miami-Dade MPO
  4. Transportation Improvement Program (TIP) 1999 by Miami-Dade MPO
    Download above document at SkyDrive.
Go to TOP
 
TIP 2000-2003
  1. Transportation Improvement Program (TIP) 2000, 5/1999 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Transportation Improvement Program (TIP) 2001, 5/2000 by Miami-Dade MPO
    Download above document.
  3. Transportation Improvement Program (TIP) 2002, 5/2001 by Miami-Dade MPO
    Download above document.
  4. Transportation Improvement Program (TIP) 2003, 5/2002 by Miami-Dade MPO
    Download above document.
Go to TOP
 
TIP 2004-2005
  1. Transportation Improvement Program (TIP) 2004 by Miami-Dade MPO
    Download above document.
  2. Transportation Improvement Program (TIP) 2005 by Miami-Dade MPO
    Download above document.
Go to TOP
 
TIP 2006-2007
  1. Transportation Improvement Program (TIP) 2006 by Miami-Dade MPO
    Download above document.
  2. Transportation Improvement Program (TIP) 2007 by Miami-Dade MPO
    Download above document.
Go to TOP
 
TIP 2008-2009
  1. Transportation Improvement Program (TIP) 2008 by Miami-Dade MPO
    Download above document.
  2. Transportation Improvement Program (TIP) 2009 by Miami-Dade MPO
    Download above document.
Go to TOP
 
TIP 2010-2011
  1. Transportation Improvement Program (TIP) 2010 by Miami-Dade MPO
    Download above document.
  2. Transportation Improvement Program (TIP) 2011 by Miami-Dade MPO
    Download above document.
Go to TOP
 
TIP: Air Quality CDR
  1. Conformity Of The 1994-98 Transportation Improvement Program With The Amendments To The 1990 Clean Air Act, 5/1993 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Conformity Of The 1995-99 TIP, 2010 LRP With The Amendments To The 1990 Clean Air Act, 4/1994 by Miami-Dade MPO; FDOT (Florida Dept of Transportation); Miami- Dade DERM
    Download above document at SkyDrive.
  3. Transportation Improvement Program 1992, Final Draft, 7/1991 by Miami-Dade MPO
  4. Transportation Improvement Program 1996, Air Quality Conformity Determination Report, 5/1995 by Miami-Dade MPO
    Download above document at SkyDrive.
  5. Transportation Improvement Program 2002, Air Quality Conformity Determination, 5/2001 by Miami-Dade MPO
  6. Transportation Improvement Program 2003, Air Quality Conformity Determination Report (CDR), 5/2002 by Miami-Dade MPO
  7. Transportation Improvement Program, Air Quality Conformity Determination Report (CDR) 2005, 5/2004 by Miami-Dade MPO
  8. Transportation Improvement Program, Air Quality Conformity Determination Report 2004, 5/2003 by Miami-Dade MPO
Go to TOP
 
TIP: Citizens Versions
  1. Citizen's Guide to the Transportation Improvement Program (TIP) 2003 by Miami-Dade MPO
    Download above document.
  2. Transportation Improvement Program, Citizens Version 2002 by Miami-Dade MPO
  3. Transportation Improvement Program, Citizen's Version 2005 by Miami-Dade MPO
    Download above document.
  4. Transportation Improvement Program, Citizen's Version 2007 by Miami-Dade MPO
    Download above document.
  5. Transportation Improvement Program, Citizen's Version 2008 by Miami-Dade MPO
    Download above document.
  6. Transportation Improvement Program, Citizen's Version 2009 by Miami-Dade MPO
    Download above document.
  7. Transportation Improvement Program, Citizen's Version 2010 by Miami-Dade MPO
    Download above document.
  8. Transportation Improvement Program, Citizens' Version 2004 by Miami-Dade MPO
    Download above document.
  9. Transportation Improvement Program, Citizens' Version 2006 by Miami-Dade MPO
    Download above document.
  10. Transportation Improvement Program, Citizen's Version! 2010 by Miami-Dade MPO
    Download above document.
  11. Transportation Improvement Program, Citizen's Version! 2011 by Miami-Dade MPO
    Download above document.
  12. Transportation Improvement Program, Executive Summary 2001 by Miami-Dade MPO
Go to TOP
 
TMA / TMO 1990-1999
  1. Civic Center TMO Commuter Characteristics Study, 12/1997 by CUTR; University of South Florida
    Download above document at SkyDrive.
  2. Civic Center TMO Commuter Characteristics Study, Executive Summary, 2/1998 by CUTR; University of South Florida
    Download above document at SkyDrive.
  3. Dade County Continuing Development of TMAs, Civic Center Pedestrian Amenities and Safety Study, 9/1994 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  4. Dade County Continuing Development of TMAs, Civic Center Pedestrian Amenities and Safety Study Executive Summary, 5/1994 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  5. Dade County Continuing Development of TMAs, Investigation Of Alternative TMAs, 10/1994 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  6. Dade County Continuing Development of TMAs, South Beach Bicycle and Pedestrian Study, 1/1995 by Barton-Aschman Associates Inc.
    Download above document at SkyDrive.
  7. Dade County Mobility Management Program  by Gold Coast Commuter Services
  8. Dade County TMA Evaluation Methodology, Technical Memorandum No. 1: Literature Search And TMA Survey, 1/1995 by ATE Management And Service Company, Inc.
    Download above document at SkyDrive.
  9. Dade County TMA Evaluation Methodology, Technical Memorandum No. 2: Optimal TMA Traffic Congestion Evaluation Measures, 1/1995 by ATE Management And Service Company, Inc.
    Download above document at SkyDrive.
  10. South Florida Commuter Vanpools, Taking the Work Out of Getting to Work!  by South Florida Commuter Services; VPSI
  11. The Commuter Challenge, Driving in Dade County by Miami-Dade MPO
Go to TOP
 
TMA / TMO 2000-Present
  1. Federal Certification Meetings on the MDC Transportation Management Area (TMA) Planning Process, Pre-Meeting Background Report, 4/2001 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Public Transportation Research Study, Price Elasticity of Rideshare: Commuter Fringe Benefits for Vanpools, 6/2004 by CUTR (Center for Urban Transportation Research); NCTR
    Download above document at SkyDrive.
Go to TOP
 
Transit 1975-1985
  1. Dade County Transit Ridership Study, 10/1975 by Office of Transportation Administration
    Download above document at SkyDrive.
  2. MDC Transportation Improvement Program, Stage 1 Rapid Transit System: Draft Report- Incremental Bus Analysis, Appendices A-C, 6/1981 by Kaiser Transit Group
  3. MDC Transportation Improvement Program, Stage 1 Rapid Transit System: Incremental Bus Analysis, 8/1981 by Kaiser Transit Group
  4. Station Area Profile 12, Civic Center, 10/1978 by MDTA (Miami-Dade Transit Agency)
    Download above document at SkyDrive.
  5. The 1980 Dade County On-Board Transit Survey, Data Analysis Report, 8/1983 by Metro-Dade Transit Administration
  6. The 1980 Dade County On-Board Transit Survey, Methodology Report 1982 by Metro-Dade Transit Administration
  7. The Dade County On-Board Transit Survey, Data Analysis Report, 2/1984 by Metro-Dade Transit Administration
    Download above document at SkyDrive.
Go to TOP
 
Transit 1986-1989
  1. Metrorail Information Guide, Metropolitan Dade County Transportation Improvement Program, Stage One Rapid Transit System 1986 by MDT (Miami-Dade Transit)
    Download above document at SkyDrive.
  2. Riverside Center Transit Feasibility Study, 12/1988 by Gannett Fleming
    Download above document at SkyDrive.
Go to TOP
 
Transit 1990-1994
  1. Downtown Miami 1994 by DDA Miami
  2. Environmental Assessment, Miami Metromover Herald Plaza Station, 3/1994 by USDOT; FTA
  3. Florida City Busway Extension Project Cost Estimate, 11/1992 by Carr Smith Associates
  4. Metromover - Bayside Pedestrian Promenade Concept Master Plan, 1/1994 by Bermello, Ajamil & Partners, Inc.
    Download above document at SkyDrive.
  5. Preliminary Engineering Report, US 1 Exclusive Bus Lanes, From: S.W. 200th Street (Caribbean Blvd.), To: South Dadeland Metrorail Station, 8/1992 by Carr Smith Associates
  6. S.W. 136th Street Transit Station Location And Busway Overpass Feasibility Assessment, Final Report, 3/1994 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  7. South Dade Transit Linkage Proposal, 11/1992 by Carr Smith Associates
Go to TOP
 
Transit 1995-1999
  1. Bus Rapid Transit: Background and Options Report, Draft, 9/1999 by PBSJ (Post Buckley Schuh & Jernigan)
  2. Joint Development At Metrorail Stations, Proposed Projects, 12/1998 by MDT (Miami-Dade Transit)
  3. Metrorail/Metromover Community Impact Study, Work Order No. 1996-2, Partial draft, 8/1997 by CUTR (Center for Urban Transportation Research)
  4. North Corridor Alternatives Analysis, Travel Demand Forecasting Methodology Report and Model Verification Summary, 11/1995 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  5. Transit/Land Use Relationship Report, 12/1995 by Gannett Fleming
    Download above document at SkyDrive.
Go to TOP
 
Transit 2000-2005
  1. Comprehensive Bus Operational Analysis (CBOA) Executive Summary and Final Recommendations, 1/2005 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  2. Miami Surface Shuttle Services: Feasibility Study for Transit Circulator Services in Downtown Miami, Brickell, Overtown, and Airport West - Executive Summary, 6/2000 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  3. Miami Surface Shuttle Services: Feasibility Study for Transit Ciruclator Services in Downtown Miami, Brickell, Overtown, and Airport West, Final Report, 6/2000 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  4. MIC/Earlington Heights Connector Study Draft Environmental Impact Statement, Vol. 1, 5/2003 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  5. Monthly Progress Photos [Metrorail Extension to the Palmetto Expressway], 3/2000 by Pistorino & Alam Consulting Engineers Inc.
  6. Monthly Progress Photos [Metrorail Extension to the Palmetto Expressway], 9/2000 by Pistorino & Alam Consulting Engineers Inc.
  7. People's Transportation Plan Status Report, 4/2004 by Miami-Dade County
  8. Transit Development Plan, 2007 Update, 6/2001 by MDT (Miami-Dade Transit)
Go to TOP
 
Transit 2006-Present
  1. Compare Transit Survey Results to Actual Count Data, 9/2010 by Gannett Fleming
    Download above document.
  2. Miami-Dade 2009 Metrorail Transit Survey Final Report, 7/2009 by Gannett Fleming
  3. Modeling Support for Near-Term Public Transportation, Improvements on Major Urban Travel Corridors, 11/2010 by Gannett Fleming
    Download above document.
  4. Transit Hub Evaluation Study Final Report, 5/2009 by The Corradino Group
    Download above document.
Go to TOP
 
Transit Corridors 1977-1989
  1. Metro Transit Expansion Study, System Planning/Staging Analysis, 1/1984 by Metro-Dade Transportation Administration
    Download above document at SkyDrive.
  2. Metropolitan Dade County Rail Rapid Transit Project, Draft Environmental Impact Statement, UMTA Project No. FL-03-0006, 1/1978 by USDOT/UMTA
  3. SR 94 Urban Corridor PTO Conceptual Design Study: Working Paper No. 1 (Draft) Data Collection and Analysis, 4/1985 by PRC Engineering Inc.
    Download above document at SkyDrive.
Go to TOP
 
Transit Corridors 1990-1999
  1. Miami North Corridor, Draft Environmental Impact Statement, 1/1998 by Metro-Dade Transit Agency; Federal Transit Administration
    Download above document at SkyDrive.
  2. Palmetto Corridor Light Rail Transit Feasibility Study, 1/1997 by Gannett Fleming
    Download above document at SkyDrive.
  3. Transit Corridor Implementation Status Report, 9/1993 by MDT (Miami-Dade Transit)
    Download above document at SkyDrive.
Go to TOP
 
Transit Corridors 2000-2009
  1. Bay Link Miami-Miami Beach Transportation Corridor Study Supplemental Draft Environmental Impact Statement Locally Preferred Alternative Report, 2/2003 by PBQD (Parsons Brinckerhoff Quade & Douglas)
  2. Locate Sites for Bus Shelter Installation Study Executive Summary, 11/2009 by David Plummer & Associates (DPA)
    Download above document.
  3. Locate Sites for Bus Shelter Installation Study final report, 11/2009 by David Plummer & Associates (DPA)
    Download above document.
  4. Miami North Corridor Final Environmental Impact Statement, Technical Reports, Draft, 7/2004 by MDT (Miami-Dade Transit)
  5. People's Transportation Plan: Metrorail Phase II (Transit Corridors), The Future Forum Presentation, July 7th 2004, 7/2004 by Miami-Dade Transit
  6. South Miami-Dade Corridor Alternative Analysis Report (South Link Study), 6/2006 by The Corradino Group
  7. South Miami-Dade Corridor Alternative Analysis Report Executive Summary (South Link Study), 6/2006 by The Corradino Group
  8. Transit "Bridge" Corridor Alternatives Analysis/Draft EIS, Scoping Summary Report, 10/2000 by Dickey Consulting Services Inc.; Kittelson & Associates Inc.
Go to TOP
 
Transit Corridors: Transitional 1992-1993
  1. Dade County Transit Corridors Transitional Analysis, Corridors Evaluation Report, 1/1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  2. Dade County Transit Corridors Transitional Analysis, Corridors Evaluation Report, 3/1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  3. Dade County Transit Corridors Transitional Analysis, Corridors Evaluation Report, Executive Summary 1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  4. Dade County Transit Corridors Transitional Study, Task 5: Identification of Preliminary Alternatives, Draft, 1/1992 by PBSJ; PBQD
    Download above document at SkyDrive.
  5. Transit Corridors Transitional Analysis, Tech Memo Task 2: Identification, Collection, and Review, 7/1992 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  6. Transit Corridors Transitional Analysis, Tech Memo Task 4: Evaluation Methodology, Revised, 2/1992 by PBSJ, KPMG, PBQD…(various)
    Download above document at SkyDrive.
  7. Transit Corridors Transitional Analysis, Tech Memo Task 4: Transit Forecasting Process and User's Guide, 2/1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  8. Transit Corridors Transitional Analysis, Tech Memo Task 5: Capital Cost Estimating Process and Results, 2/1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  9. Transit Corridors Transitional Analysis, Tech Memo Task 5: Detailed Definition of Alternatives, 2/1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  10. Transit Corridors Transitional Analysis, Tech Memo Task 5: Operating and Maintenance Cost Estimating Process and Results, 2/1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  11. Transit Corridors Transitional Analysis, Tech Memo Task 5: Transit Forecasting Methodology and Results, 2/1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  12. Transit Corridors Transitional Analysis, Tech Memo Task 6: Financial Analysis, 2/1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
  13. Transit Corridors Transitional Analysis, Tech Memo Task 9: Jitney Survey, 2/1993 by PBSJ, KPMG, PBQD…
    Download above document at SkyDrive.
Go to TOP
 
Transit: CUTR Studies 1992
  1. 1990 Performance Evaluation of Florida Transit Systems, Part 1: Trend Analysis, 1984-1990, 4/1992 by CUTR (Center for Urban Transportation Research)
  2. Analysis Of The Economic And Legal Implications Of Adopting A Transportation Utility Fee for Dade Co., Florida, Final Report, 11/1992 by CUTR (Center for Urban Transportation Research)
  3. Regional Public Transit Fuel Tax Financial Concept Plan, 12/1992 by CUTR (Center for Urban Transportation Research)
  4. Review of Joint Use Efforts Nationwide, Technical Memorandum #1: Metro-Dade Transit Joint Use Policy, 10/1992 by CUTR (Center for Urban Transportation Research)
Go to TOP
 
Transit: CUTR Studies 1993
  1. Assessment Of Advanced Public Transportation Systems Needs For The Metro-Dade Transit Agency, 2/1993 by CUTR (Center for Urban Transportation Research)
  2. Bus Operators' Manual, Metro-Dade Transit Agency, Final Report, 5/1993 by CUTR (Center for Urban Transportation Research)
  3. Final Technical Memorandum Number 2: Fare Policy Alternatives, 12/1993 by CUTR (Center for Urban Transportation Research)
  4. Functional Classification Study: Fiscal Impact Analysis of Proposed Revised Roadway Ownership Criteria, 7/1993 by CUTR (Center for Urban Transportation Research)
  5. MDTA Fare Cross-Elasticity And Allocation, Draft Technical Memorandum Number 4: Characteristics of Cash/Token Users, 10/1993 by CUTR (Center for Urban Transportation Research)
  6.  MDTA Fare Cross-Elasticity And Allocation, Draft Technical Memorandum Number 5: Predicting Changes in Fare Payment Method, 12/1993 by CUTR (Center for Urban Transportation Research)
  7. MDTA Fare Cross-Elasticity And Allocation, Final Technical Memorandum Number 1: Existing Fare Policies/Pass Usage Characteristics, 7/1993 by CUTR (Center for Urban Transportation Research)
  8. MDTA Fare Cross-Elasticity And Allocation, Final Technical Memorandum Number 2: Survey Design And Administration, 7/1993 by CUTR (Center for Urban Transportation Research)
  9. MDTA On-Board Survey Design Analysis, Draft Report, Technical Memorandum Number 3: Metrobus Survey Findings, 10/1993 by CUTR (Center for Urban Transportation Research)
  10. MDTA On-Board Survey Design And Sampling Plan, Final Report, 4/1993 by CUTR (Center for Urban Transportation Research)
  11. MDTA Transit Fare Policies And Strategies, Draft Technical Memorandum Number 3: Evaluation of Preferred Alternatives, 2/1993 by CUTR (Center for Urban Transportation Research)
  12. Metropolitan Dade County General Travel Survey Design and Sampling Plan, Final Report, 4/1993 by CUTR (Center for Urban Transportation Research)
  13. Strategic Plan for Advanced Public Transportation Systems For Metro-Dade Transit Agency, 12/1993 by CUTR (Center for Urban Transportation Research)
Go to TOP
 
Transit: CUTR Studies 1994
  1. Bikes-On-Bus, Service Delivery in Dade County: Suitability and Feasibility, 4/1995 by CUTR (Center for Urban Transportation Research)
  2. Fare Cross-Elasticity And Allocation, 4/1994 by CUTR (Center for Urban Transportation Research)
  3. MDTA Metromover Extensions Transfer Analysis, Final Technical Memorandum Number 1: Current Operating Characteristics of Metrobus Service into/within the Central Business District, 3/1994 by CUTR (Center for Urban Transportation Research)
  4. MDTA Metromover Extensions Transfer Analysis, Final Technical Memorandum Number 2: Metromover Fare Policy Alternatives, 4/1994 by CUTR (Center for Urban Transportation Research)
  5. MDTA Metromover Extensions Transfer Analysis, Final Technical Memorandum Number 3: Analysis Of Impacts Of Proposed Transfers Between Bus And Mover, 4/1994 by CUTR (Center for Urban Transportation Research)
  6. MDTA On-Board Survey Analysis, Final Report, 5/1994 by CUTR (Center for Urban Transportation Research)
  7. MDTA On-Board Survey: Metrobus Route by Route Characteristics, Appendix B: Metrobus Demographic And Travel Characteristics by Route, 1/1994 by CUTR (Center for Urban Transportation Research)
  8. Metromover Extensions Transfer Analysis, 5/1994 by CUTR (Center for Urban Transportation Research)
  9. On The Move in Metro-Dade County, Executive Summary of the CUTR/Metro-Dade Technical Assistance Project 1994 by CUTR (Center for Urban Transportation Research)
  10. Privatization in Mass Transit, Overview and the Florida Experience 1994 by CUTR (Center for Urban Transportation Research)
  11. Transit Fare Policies And Strategies, 9/1994 by CUTR (Center for Urban Transportation Research)
Go to TOP
 
Transit: Municipal 1995-1999
  1. City of Aventura Municipal Transit Study, 6/1998 by Bermello, Ajamil & Partners, Inc.
    Download above document at SkyDrive.
  2. City of Hialeah Circulator Service, 9/1998 by Carr Smith Associates
  3. City of Hialeah Circulator Study, 10/1998 by Carr Smith Associates/Corradino
    Download above document at SkyDrive.
  4. City of North Miami Beach MPO Municipal Grant Circulator Services, End of Year Report, 9/1998 by City of North Miami Beach
  5. Electrowave Immediate Action Plan, Final  by Corradino
  6. Electrowave Seven-Year Long-Range Plan, Final  by Corradino
  7. Electrowave Shuttle Report, 9/1998 by City of Miami Beach
  8. Miami Beach Electric Shuttle Identity & Trail Blazing Signage Study 1998 by Institute for Transportation Research, Andrreas School of Business
    Download above document at SkyDrive.
  9. North Miami Community Transit Circulator Study, Pre-Community Input Interim Report, 2/1999 by PRL & Associates, Inc.; Meridian Consulting, Inc.
Go to TOP
 
Transit: Municipal 2000-2004
  1. 107th Avenue Pedestrian Transit Greenways Corridor at City of Sweetwater, Final Report, 12/2003 by Florida International University (FIU)
    Download above document.
  2. City of Coral Gables Circulator System Study, 5/2001 by David Plummer & Associates (DPA); Jackson, Kercher, Anglin, Lopez & Rinehart
    Download above document.
  3. City of Coral Gables Circulator System Study, Executive Summary 2001 by David Plummer & Associates (DPA)
  4. City of North Miami Beach Community Mobility Program, Project Bank and Work Plan 2000 by Chatterton Consulting
  5. City of North Miami Transit Circulator Plan, Phase II - Implementation Plan, Final Report, 3/2002 by PRL & Associates, Inc.; Meridian Consulting, Inc.
  6. Coconut Grove Transit Circulator Services Technical Assistance Study Final Report, 12/2001 by CUTR (Center for Urban Transportation Research)
    Download above document at SkyDrive.
  7. Electric Transit Circulator Feasibility Study, Executive Summary, 6/2001 by CUTR (Center for Urban Transportation Research)
  8. Electric Transit Circulator Feasibility Study, Final Report, 6/2001 by CUTR (Center for Urban Transportation Research)
    Download above document.
  9. Hialeah Transit System Services And Opportunities Study, 12/2003 by The Corradino Group
    Download above document.
  10. Local Municipal Transit Circulator Policy Study, 6/2002 by Kimley-Horn & Associates
    Download above document.
  11. North Miami Community Transit Circulator Study, Final Report, 4/2000 by PRL & Associates, Inc.; North Meridian Inc.
    Download above document.
Go to TOP
 
Transit: Municipal 2005-2009
  1. City of Aventura Municipal Public Transit Study, Aventura Advantage Onboard Survey & Ride Check and Service Improvement Recommendations 2006 by CUTR (Center for Urban Transportation Research); Craven Thompson
    Download above document.
  2. City of Miami Springs Circulator Study 2006 by The Corradino Group
  3. City of South Miami Trolley/Circulator Feasibility Study, Executive Report, 8/2007 by Parsons Transportation Group; CES Consultants, Inc.
    Download above document.
  4. City of South Miami Trolley/Circulator Feasibility Study, Final Report, 8/2007 by Parsons Transportation Group; CES Consultants, Inc.
    Download above document.
  5. Coral Gables Trolley Route Expansion Study 2006 by David Plummer & Associates (DPA)
    Download above document.
  6. Coral Gables Trolley Route Expansion, Feasibility Study, 3/2006 by David Plummer & Associates (DPA)
    Download above document.
  7. Doral Circulator Study, Final Report, 5/2007 by The Corradino Group
    Download above document.
  8. Hialeah Transit System Express Route and Enhanced Service Draft Final Report, 3/2008 by The Corradino Group
    Download above document.
  9. Miami Civic Center Circulator Study, Executive Summary Report, Draft, 1/2006 by The Corradino Group
  10. Miami Gardens Circulator Feasibility Study, 1/2008 by David Plummer & Associates (DPA)
    Download above document.
  11. Town of Medley Transit Circulator Services Implementation Study, 9/2006 by Westhorp & Associates; BCC Engineering Download above document.
Go to TOP
 
Transit: Municipal 2010-Present
  1. City of Opa-Locka Transit Circulator System Final Report, 3/2010 by Kimley-Horn & Associates
    Download above document.
Go to TOP
 
Transportation Disadvantaged 1980-1990
  1. Disadvantaged Business Enterprise Directory 1988-1989, 3/1989 by MDTA (Miami-Dade Transit Agency)
  2. Elderly and Handicapped Transportation Needs Study Volume 3: The Five Year Improvement Plan (Action Plan), 9/1978 by Office of Transportation Administration
  3. Florida Five-Year Transportation Disadvantaged Plan, Technical Memorandum No. 1, 9/1990 by CUTR (Center for Urban Transportation Research)
  4. Task Force Report For Persons With Disabilities, 10/1987 by MDC (Miami-Dade County)
  5. Transportation Disadvantaged Development Plan 1984 by Miami-Dade MPO
  6. Transportation Disadvantaged Development Plan 1985 by Miami-Dade MPO
  7. Workbook Transportation Disadvantaged, 11/1990 by Florida Transportation Disadvantaged Commission
Go to TOP
 
Transportation Disadvantaged 1991-1995
  1. ADA Coordination Workbook 1992 by MDC (Miami-Dade County)
  2. Florida Five-Year Transportation Disadvantaged Plan, Technical Memorandum No. 2, 5/1991 by CUTR (Center for Urban Transportation Research)
  3. Planning Workbook: A Workbook To Help Develop A Florida Coordinated Transportation Development Plan For The Transportation Disadvantaged, 6/1991 by Florida Transportation Disadvantaged Commission
  4. Proposed Plan To Comply With ADA-Required Complementary Paratransit Service, 12/1991 by MDTA (Miami-Dade Transit Agency)
  5. Transportation Disadvantaged Program Policies & Procedures, 9/1992 by FDOT (Florida Dept. of Transportation)
Go to TOP
 
Transportation Disadvantaged 1996-2000
  1. Effects of Transportation Plan Development on Minority and Impoverished Urban Communities, Technical Memorandum, 6/1998 by University of South Florida (USF); Beverly G. Ward and Eric T. Hill
    Download above document at SkyDrive.
  2. Florida Commission for the Transportation Disadvantaged Agreement, 11/2000
  3. Florida Commission for the Transportation Disadvantaged Annual Performance Report 2000
  4. Welfare to Work: Transportation Issues and Opportunities in Miami-Dade County, Final Report: Executive Summary, 12/1998 by Florida International University (FIU), Metropolitan Center Institute of Government
  5. Welfare to Work: Transportation Issues and Opportunities, Final Report, 12/1998 by Florida International University (FIU), Metropolitan Center Institute of Government
    Download above document at SkyDrive.
Go to TOP
 
Tri-Rail
  1. Cost & Ridership Demand Estimates For The Proposed Extension of Tri-Rail From Miami Int'l Airport to Homestead, 12/1992 by CUTR (Center for Urban Transportation Research)
  2. Cost and Ridership Demand Estimate for the Proposed Extension of Tri-Rail Service to South Dade County, Draft, 1/1993 by Barton-Aschman Associates Inc.
  3. Evolution of a Commuter Rail System in South Florida, 7/1990 by James Rankin
  4. Opa-Locka Station Evaluation: Preliminary Assessment of Impacts, Draft, 1/1992 by CUTR (Center for Urban Transportation Research)
  5. Tri-County Commuter Rail Authority Annual Report, Fiscal Year 1989/90 1990
  6. Tri-County Commuter Rail Authority Business Plan, Fiscal Year 96/97, Draft 1997
  7. Tri-County Commuter Rail Authority, Leading the Way to Greater Mobility in South Florida, Long Range Master Plan: Executive Summary  by Tri-County Commuter Rail Authority
  8. Tri-County Commuter Transit Study, 12/1984 by Transportation & Distribution Associates
  9. Tri-Rail Airport-Seaport Connection Feasibility Study, Final Report, 2/1991 by PBSJ (Post Buckley Schuh & Jernigan)
  10. Tri-Rail Service Extension Financial Concept Plan - Status Update, 12/1992 by CUTR (Center for Urban Transportation Research)
  11. Tri-Rail Service Extension Financial Concept Plan, Draft, 11/1992 by CUTR (Center for Urban Transportation Research)
Go to TOP
 
Turnpike
  1. Analysis of Automatic Vehicle Identification, Technology and Its Potential Application on Florida's Turnpike 1993 by CUTR (Center for Urban Transportation Research)
  2. Florida's Turnpike Traffic Engineer's Annual Report 1996 by URS
  3. Florida's Turnpike, Building On The Past - Preparing For The Future, 1/1997 by Florida's Turnpike
  4. HEFT/SR 874 Study, Turnpike Planning Concept Report, 3/2001 by Florida's Turnpike; FDOT
  5. Preliminary Engineering Report, S.W. 120th Street Interchange with the Homestead Extension of Florida's Turnpike, 6/1985 by Keith And Schnars, P.A.
  6. Turnpike Enterprise Tentative Work Program, FY 2004/05 - 2008/09, 11/2003 by Florida's Turnpike
  7. Turnpike Enterprise Value Pricing Study, Executive Summary, 9/2002 by Florida's Turnpike
Go to TOP
 
UPWP 1970-1980
  1. Unified Planning Work Program Transportation Planning and Related Planning Activities 1978 by Miami-Dade MPO
  2. Unified Planning Work Program Transportation Planning and Related Planning Activities 1979 by Miami-Dade MPO
  3. Unified Work Program for Transportation and Related Planning Activities 1974 by Miami-Dade MPO
  4. Unified Work Program for Transportation and Related Planning Activities 1975 by Miami-Dade MPO
  5. Unified Work Program for Transportation and Related Planning Activities 1976 by Miami-Dade MPO
  6. Unified Work Program for Transportation and Related Planning Activities 1977 by Miami-Dade MPO
  7. Unified Work Program for Transportation Planning and Related Planning Activities 1980 by Miami-Dade MPO
Go to TOP
 
UPWP 1981-1989
  1. Unified Planning Work Program 1983 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Unified Planning Work Program 1984 by Miami-Dade MPO
    Download above document at SkyDrive.
  3. Unified Planning Work Program 1985 by Miami-Dade MPO
  4. Unified Planning Work Program 1986 by Miami-Dade MPO
    Download above document at SkyDrive.
  5. Unified Planning Work Program 1987 by Miami-Dade MPO
    Download above document at SkyDrive.
  6. Unified Planning Work Program for Transportation 1989 by Miami-Dade MPO
    Download above document at SkyDrive.
  7. Unified Planning Work Program for Transportation Planning 1988 by Miami-Dade MPO
    Download above document at SkyDrive.
  8. Unified Planning Work Program Transportation Planning and Related Planning Activities 1982 by Miami-Dade MPO
  9. Unified Work Program for Transportation Planning and Related Planning Activities 1981 by Miami-Dade MPO
Go to TOP
 
UPWP 1990-1995
  1. Unified Planning Work Program for Transportation 1990 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Unified Planning Work Program for Transportation 1991 by Miami-Dade MPO
    Download above document at SkyDrive.
  3. Unified Planning Work Program for Transportation 1992 by Miami-Dade MPO
    Download above document at SkyDrive.
  4. Unified Planning Work Program for Transportation 1993 by Miami-Dade MPO
    Download above document at SkyDrive.
  5. Unified Planning Work Program for Transportation 1994 by Miami-Dade MPO
    Download above document at SkyDrive.
  6. Unified Planning Work Program for Transportation 1995 by Miami-Dade MPO
    Download above document at SkyDrive.
Go to TOP
 
UPWP 1996-2000
  1. Unified Planning Work Program for Transportation 1996 by Miami-Dade MPO
    Download above document.
  2. Unified Planning Work Program for Transportation 1997 by Miami-Dade MPO
    Download above document.
  3. Unified Planning Work Program for Transportation 1998 by Miami-Dade MPO
    Download above document.
  4. Unified Planning Work Program for Transportation 1999 by Miami-Dade MPO
    Download above document.
  5. Unified Planning Work Program for Transportation 2000 by Miami-Dade MPO
    Download above document.  
Go to TOP
 
UPWP 2001-2006
  1. Unified Planning Work Program for Transportation 2001, 5/2000 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Unified Planning Work Program for Transportation 2002, 5/2001 by Miami-Dade MPO
  3. Unified Planning Work Program for Transportation 2003 by Miami-Dade MPO
    Download above document.
  4. Unified Planning Work Program for Transportation 2004, 5/2003 by Miami-Dade MPO
    Download above document.
  5. Unified Planning Work Program for Transportation 2005, 5/2004 by Miami-Dade MPO
    Download above document.
  6. Unified Planning Work Program for Transportation 2006, 5/2005 by Miami-Dade MPO
    Download above document.
Go to TOP
 
UPWP 2007-2014
  1. Unified Planning Work Program for Transportation 2007, 5/2006 by Miami-Dade MPO
    Download above document.
  2. Unified Planning Work Program for Transportation 2008, 5/2007 by Miami-Dade MPO
    Download above document.
  3. Unified Planning Work Program for Transportation 2009-2010, 5/2008 by Miami-Dade MPO
    Download above document.
  4. Unified Planning Work Program for Transportation, Fiscal Years 2011 and 2012, 6/2010 by Miami-Dade MPO
    Download above document.
Go to TOP
 
Vanpools
  1. Request For Proposals for Vanpool Demonstration Program, RFP No. 000064, 1/1997 by Miami-Dade MPO
    Download above document at SkyDrive.
  2. Vanpool Demonstration Program "Summary and Analysis", 8/1997 by Miami-Dade MPO
Go to TOP
 
Water Transit
  1. Development of a Service Plan for Waterborne Transportation Service in Miami-Dade County, Executive Summary, 12/2004 by Kimley-Horn & Associates
    Download above document.
  2. Development of a Service Plan for Waterborne Transportation Service in Miami-Dade County, Final Report, 12/2004 by Kimley-Horn & Associates
    Download above document.
  3. Feasibility of Utilizing Miami-Dade County Waterways for Urban Commuting Travel, 1/2003 by Gannett Fleming; Civil Works, Inc.
    Download above document.
  4. Utilization of Miami-Dade County Waterways for Urban Commuting Travel, Executive Summary, 2/2003 by Gannett Fleming; Civil Works, Inc.
Go to TOP