Miami-Dade Metropolitan Planning Organization
This is the text version of the page titled Transportation Studies.
Click here for the formatted version.
Two options: Menu | Contents
Menu: Home |
Resources | Boards
and Committees | Plans and Programs | Studies (you
are here) | Downloads |
Mini-Sites | About
Us
Contents: Table of Contents |
List of Transportation Studies | Search
| Translate
Table of Contents. (Next 211 items are links to the List of
Transportation Studies also located on this page.)
- 79th Street Corridor Neighborhood Initiative 2002
- 107th Avenue Pedestrian and Transit Greenways Corridor
Study 2002
- 137th Avenue Corridor Study 2005
- Access to SW 137th Avenue to and from SR 874 Study
- Adding Turbo Lanes to T-Intersections Study 2009
- Aesthetic Guidelines for Transportation Projects
in Miami-Dade County 2009
- Arterial Grid Network Analysis 2006
- Arterial Investment Study: 107th Avenue
- Automated Bicycle Rental System and Parking Plan 2009
- Bay Link (Miami-Miami Beach Transportation Corridor Study
2002)
- Bicycle/Pedestrian Mobility Plan for the Miami Downtown
Development Authority 2009
- Bicycle/Pedestrian Plan Update 2007
- Bicycle and Pedestrian Traffic Count Program 2006
- Bicycle Boulevard Planning Study 2009
- Bicycle Facilities Plan 1997
- Bicycle Parking Plan for Miami-Dade Transit 2002
- Bicycle Project Feasibility Evaluation 2003
- Bicycle Safety Education Program 2009
- Bicycle Safety Program Plan 2005
- Bikes-on-Bus Service Delivery in Dade County Study
1995
- Black Creek Trail Segment B Study 2006
- Bus Rapid Transit Opportunities Study 2003
- Bus-on-Shoulder Service Evaluation Study 2007
- Central Dade Transport Zone Study 2007
- Citizen's Guide to Transportation 2004 (also known as
Pocket Guide)
- Citizen's Guide to Transportation 2007 (also known as
Pocket Guide)
- City of Aventura Municipal Transit Study 1998
- City of Coral Gables Circulator System Study 1996
- City of Doral Transportation Master Plan 2005
- City of Doral Transportation Master Plan Update 2009
- City of Hialeah Circulator Study 1997
- City of Homestead Downtown Area Transportation Plan
Update 2003
- City of Miami Beach Municipal Mobility Plan 1998
- City of Miami Car-Sharing Feasibility Study 2009
- City of Miami Gardens Transportation Master Plan 2004
- City of Miami Health District Bicycle and Pedestrian
Mobility Study 2011
- City of Miami Springs 36th Street District Traffic
Impact Study 2008
- City of Miami Springs Traffic Circulation and Parking
Study for Westward Drive 2010
- City of North Miami Beach Community Mobility Program
2002
- City of North Miami Beach Fulford City Center
Geometric Roadway Design Study 2003
- City of North Miami Beach Pedestrian & Bicycle
Safety Analysis Study 2004
- City of North Miami Bike, Park and Ride Study 2007
- City of South Miami Hometown Intermodal Transportation
Study 2002
- City of South Miami Trolley/Circulator Feasibility
Study 2006
- City of South Miami US-1 Pedestrian Overpass Study
2000
- City of Sunny Isles Bridge to Link a Pedestrian/Bicycle
Greenway Study 2003
- Civic Center TMO Commuter Characteristics Study
1994
- Civic Center TMO Pedestrian Amenities and Safety Study
- Coastal Communities Transportation Master Plan 2006
- Coconut Grove Planning Study 1996
- Compare Transit Survey Results Study 2010
- Comprehensive Parking Study for Freight Transport
in Miami-Dade County Study 2009
- Community Characteristics Project Phase V 2008
- Community Characteristics Project Phase VI 2009
- Congestion Intersection Improvement Study Phase II
2006
- Congestion Management Process (CMP) Update 2009
- Congestion Management System Update Study 2003
- Coral Gables Trolley Route Expansion Study 2005
- Countywide High-Crash Location Safety Study 2009
- Countywide Park and Ride Facilities Study 2009
- Countywide Parking Policy Study for Miami-Dade County
1999
- Countywide Traffic Safety Program 2008
- CSX Corridor Evaluation Study 2008
- Curtiss Parkway/NW 36 Street Traffic Study 2005
- Cutler Bay Town-Wide Bicycle and Pedestrian Master
Plan 2010
- Dadeland Regional Activity Center Study 1997
- Develop Procedures and Criteria for Establishing
School Crossing Guard Locations 2010
- Development of a Service Plan for Waterborne Transportation
Services in Miami-Dade County 2004
- Doral Circulator Study 2006
- Downtown Kendall Transportation Study 2002
- East West Corridor Study
- Economic Impact of Parking Policy Options 1986
- Effects of Transportation Plan Development on Minority
and Impoverished Urban Communities 1998
- Electric Transit Circulator Feasibility Study 2000
- Electrowave Shuttle Report 1998
- Evaluation of Current Methodology to Determine Traffic
Concurrency 2010
- Feasibility of Implementing Tech Centers in Miami-Dade
County 2004
- Feasibility of Utilizing Miami-Dade County Waterways
for Urban Commuter Travel 2002
- Feasibility Study: A Public-Private Partnership
for Transit Vehicle Purchasing and Leasing 1998
- Feasibility Study: Northside Intermodal Terminal 1985
- Fiber Optic Communications Concept Plan for Miami-Dade
County's Intelligent Transportation Infrastructure 1998
- Freight Movement Study 1996
- Flagler Street Reversible Flow Study 1992
- Florida East Coast (FEC) Transit Connection Study
2009
- Golden Glades Multimodal Transportation Facility
Feasibility Study 1994
- Health District Comprehensive Traffic Study 2008
- Hialeah Transit System Express Service Feasibility
Study 2009
- Hialeah Transit System Services And Opportunities
Study 2003
- I-395 Alternatives Financial Assessment Study 2002
- Implementation of Advanced Warning in School Speed
Zones Study 2011
- Improving Access in FIU Biscayne Bay Campus Area
2010
- Improving Regional Transportation Planning 2011
- Indirect Left Turns Study 2007
- Integrated Transportation Information System (ITIS)
2010
- Integrated Transportation Management System (ITMS) 1998
- Intelligent Transportation System Plan for Dade County
1996
- Intelligent Transportation System Plan Update for
Miami-Dade County 1999
- InteracTIP 2003
- Interactive Transportation Information Systems (Kiosk)
1997
- Investigation of Alternative TMAs 1994
- Kendall Drive Mobility Enhancement Study 2002
- Kendall-Link Alternatives Analysis Study 2005
- LeJeune Road Corridor Traffic Impact Study 1996
- Local Municipal Transit Circulator Policy Study 2002
- Locate Sites for Bus Shelter Installations Study 2008
- Ludlam Trail Non-Motorized Corridor Planning Environmental
Study 2003
- Metro-Dade Road Pricing Study 1994
- Metropolitan Dade County Comprehensive Bicycle Plan
1986
- Metropolitan Planning Organization Congested Intersections
Study 1999
- Metrorail M-Path Master Plan 2006
- Metrorail/Coconut Grove Connection Study Phase II
2004
- Miami Beach Intermodal Feasibility Study 1999
- Miami Beach Master Plan for the 16th Street Corridor
Study 2004
- Miami Civic Center Circulator Study 2005
- Miami Civic Center Circulator Study Phase II 2007
- Miami Downtown Transportation Master Plan 2001
- Miami Gardens Circulator Feasibility Study 2006
- Miami River Corridor Multimodal Transportation Plan
2006
- Miami Springs Transit System Service and Opportunity
Study 2004
- Miami Surface Shuttle Services Technical Assistance
2000
- Miami-Dade County Bicycle and Pedestrian Facility
Maintenance Program 2008
- Miami-Dade County Grade Separation Feasibility Study
2004
- Miami-Dade County Typical Roadway Section and
Zoned Right-of-Way Update Study 2007
- Miami-Dade Freight Plan 2007
- Miracle Mile Traffic Circulator Study 1993
- Mobility Management Process/Congestion Management
System 1996
- Model Validation to Cube Voyager 2007
- Modeling Support for Near Term Transportation Improvements
Study 2010
- Near-Term Plan for Improved Transportation Services
Study 2010
- North Dade Greenways Master Plan 1997
- North Miami Community Transit Circulator Study 2000
- North Ponce de Leon Boulevard Median Evaluation 2002
- Northeast Corridor Traffic Flow Implementation Plan
Study 2008
- Northeast Miami-Dade Traffic Flow Study 2006
- NW 7th Avenue Traffic and Pedestrians Study 2009
- NW/NE 36th Street Study 2006
- On the Waterfront: Implementation Plan to Finish
15 Mile 2011
- Opa-Locka Circulator/Transit Improvement Feasibility
Study 2008
- Origin Destination Study for the 95 Express 2010
- Palmetto Bay Transportation Master Plan Study 2004
- Palmetto Corridor Light Rail Transit Feasibility
Study 1996
- Pedestrian Safety Around High Risk Schools Study
2010
- Pedestrian/Bicycle Safety Study 2007
- Port of Miami City Street Improvements 2000
- Port of Miami Freight Access Study 2006
- Post Hurricane Short Range Transportation Study 1995
- Public Involvement Effectiveness Evaluation Program
2001
- Rail Convertibility Study 2003
- Railroad Rights-Of-Way Assessment Study 1993
- Regional Freight Plan 2008
- Regional Long Range Transportation Plan 2007
- Safe Routes to Parks Study 2009
- Safe Routes to School Online Map System Pilot Program
2009
- Safe Routes to School Program Study 2003
- Safe Routes to School Program Study 2006
- Safe Routes to School Program Study 2007
- Senior High School Student Safety Campaign 2008
- School Zone Traffic Congestion Study 2002
- Service Enhancements to the Hialeah Transit System
2007
- Short Range Truck Traffic Study for the Airport
West Area 2002
- Signage Program for the Miami Health District 2011
- Simulation and Analysis of Potential Mass Evacuation
of Miami-Dade Residents 2006
- Snake Creek Bike Trail Planning and Feasibility Study
2004
- Snapper Creek Park & Ride Feasibility Study 1998
- Snapper Creek Trail Segment A Planning Study 2007
- Sociocultural Effects Program 2003
- South Beach Bicycle and Pedestrian Study 1994
- South Dade Greenway Network Master Plan 1994
- South Dade Managed Lanes 2007
- South Florida Clean Energy and Greenhouse Gas Emission
Reduction Program 2009
- South Link (South Miami-Dade Transit Corridor Study
2004)
- Special Use Lane Study 2004
- Special Use Lanes Study: Transit Use of Shoulder
By-Pass Lanes 2005
- SR-826 and Biscayne Boulevard Pedestrian & Bicycle
Safety Study 2007
- Strategies for Integration of Sustainability and the
Transportation System 2010
- Superarterial Network Study 1996
- SW 152nd Street Corridor Transportation Study 2007
- Town of Cutler Bay Transportation Master Plan 2008
- Town of Medley NW 116th Way Corridor Study 2009
- Town of Medley NW South River Drive Corridor Study
2003
- Town of Medley NW South River Drive Corridor
Area Expansion Study 2005
- Town of Medley Transit Circulator Services Implementation
Study 2005
- Town of Miami Lakes Transportation Master Plan 2004
- Traffic Calming for Pedestrians at Miami-Dade
Community College Wolfson Campus Study 2003
- Traffic Safety Plan for Elderly Pedestrians in Miami-Dade
County 2010
- Traffic Signs Research Study for Miami-Dade County
2006
- Transit Center Connections Study 2003
- Transit Contraflow Feasibility Study 2002
- Transit Corridors Transitional Study 1994
- Transit Hub Evaluation Study 2008
- Transit On-Board Survey 2008
- Transit Oriented Development Master Plans for Exclusive
Busway Corridors Study 2003
- Transit Service Evaluation Study 2009
- Transportation and Economic Impact Analysis for Freight
Industry 2010
- Transportation Data Management System (TDMS) 2001
- Transportation Demands of the 21st Century 2007
- Transportation Financial Analyses and Assessments Study
1997
- Transportation System Hurricane Emergency Preparedness
Plan 1995
- Transportation System Performance Monitoring 2007
- Trends in Heavy Truck Traffic Management Study 2003
- Truck Route System for Miami-Dade County 2006
- Update of the Miami-Dade County GIS Crash Data
System 2009
- US-1 Intersection Improvements Study 2007
- US-1 Reversible Flow Lane Study 2006
- US-1/SR-878 Intersection Sub-Area Traffic Study
2009
- Vanpool Demonstration Program 1996
- Village of Palmetto Bay Bicycle and Pedestrian Master
Plan 2008
- Village of Palmetto Bay Safe Routes to School Program
Study 2009
- Village of Pinecrest Safe Routes to School Study 2010
- Web-based Bicycle Route Planning Tool 2010
- Welfare to Work: Transportation Issues and Opportunities
in Miami-Dade County 1998
- West Flagler Street Corridor Study 1997
- Westchester Traffic Impact Study 2007
List of Transportation Studies. (Next 213 items listed
alphabetically below have links to Adobe PDF documents, web pages and/or websites.)
- 79th Street Corridor Neighborhood Initiative 2002
- Also called 79th Street Corridor Redevelopment Plan or 79th Street Corridor
Urban Study. To transform the portion of the 79th Street between NW 22nd Avenue
and NW 42nd Avenue into a cohesive neighborhood. This includes a mixed-use transit
oriented development, dedicated bus facilities, a kiss-and-ride facility, parking
and the relocation of the
Amtrak station, and a redevelopment of the Northside Shopping Center. The
work was directed by the 79th Street Corridor Neighborhood Initiative, a partnership
of non-profit economic development agencies. Started September 2002 and completed
December 2003. Work by Zyscovich, Inc.
Download the
Transportation
Analysis Draft Report (September 2002),
Final Report (December 2003) and
Presentation (October 2005). Contact
Susan Schreiber at 305-375-1887 for
complete details.
- 107th Avenue Pedestrian and Transit Greenways Corridor
Study 2002 - Explore the construction of a pedestrian transit greenway along
107th avenue from Flagler Street to SW 8th Street, in the
City of Sweetwater. Started
December 2002 and completed August 2003. Work by
Florida International University. Download
the
Final Report (December 2003). Contact
David Henderson at 305-375-1647 for
complete details.
- 137th Avenue Corridor Study 2005 - Feasibility
of making SW 137th Avenue into a major north/south corridor between the
City of Homestead and central
Miami-Dade County. Started in 2005 and completed June 2007. Work by
The Corradino Group. Download the
Final Report and Executive Summary (June 2007) and
SW 137th Avenue Corridor Study (From SW 184th Street to Turnpike Extension)
(February 2005). Contact Jesus Guerra
at 305-375-2069 for complete details.
- Access to SW 137th Avenue to and from SR 874 Study
- Feasibility of creating a connection between SW 137th Avenue and State Road
874 also known as the Don Shula Expressway. Work by
Kimley-Horn & Associates. Download
the
Executive Summary (April 2002) and
Final Report (April 2002). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Adding Turbo Lanes to T-Intersections Study 2009
- The objective of this study is to evaluate T-intersections that can be converted
to turbo lanes within the county boundaries. Started May 2009 and completed
March 2010. Work by David Plummer & Associates.
The budgeted cost is approximately $83,000 including 10% for contingencies.
Download the
Executive Summary (May 2010),
Final Report (May 2010),
Appendices (May 2010), and
Presentation (May 2, 2010). Contact
Jesus Guerra at 305-375-2069 for complete details.
- Aesthetic Guidelines for Transportation Projects in
Miami-Dade County 2009 - Develop a set of countywide aesthetic guidelines
and best practices to assist transportation agencies, project managers and consultants,
as to how aesthetics can be incorporated into transportation projects. Started
March 2010. Expected completion was December 2010. Work by
HTNB. The approximate cost is $64,931. Download
the
Action Plan (November 2011). Contact
Susan Schreiber at 305-375-1887 for
complete details.
- Arterial Grid Network Analysis 2006 - Intended to
determine whether improvements could be made to the grid system as a long-term
traffic congestion relief measure, rather than stop-gap improvements that may
slightly improve traffic flow in one corridor while potentially “shifting” the
problem to a different corridor. Started April 2006 and completed March 2007.
Work by Kimley-Horn & Associates.
Download the
Final Report (March 2007), and
Presentation (2007). Contact Wilson
Fernandez at 305-375-1886 for complete details.
- Arterial Investment Study: 107th Avenue - In conjunction
with FDOT, a pilot Arterial Investment
Study for SW/NW 107th Avenue was conducted to evaluate multimodal solutions.
This study was considered as a pre-PD&E study, which resulted in a wide range
of recommendations. Please
visit our office to view or receive a copy of this report. Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Automated Bicycle Rental System and Parking Plan 2009
- This study will evaluate the feasibility of implementing a self-service bicycle
rental system and a bicycle parking transit center. The scope of work also includes
development of uniform design standards for bicycle racks. Started December
2009 and completed November 2011. Work by
Kimley-Horn & Associates. The
budgeted cost is $55,000. Download the
Automated Bicycle Rental and Parking Plan 2011. Contact
David Henderson at 305-375-1647 for
complete details.
- Bay Link (Miami-Miami Beach Transportation Corridor
Study 2002) - This would study a double tracked, street-level light rail alignment
that would serve downtown Miami, Watson Island, and the southern portion of
Miami Beach. Two rounds of public meetings (each) were held separately in
Miami and
Miami Beach. One to outline the system
and the other to get comments and concerns. Completed August 2004. Work by
Parsons Brinckerhoff. Download the
Presentation to the MPO (July 29, 2004). RESULTS: Systems planning was completed
October 2002. Alternatives Analysis/Draft Environmental Impact Statement was
done May 2003. A Locally Preferred Alternative (LPA) was adopted by the MPO
on September 26, 2003. And PE/Final Environmental Impact Statement was completed
August 2004. Contact Wilson Fernandez
at 305-375-1886 for complete details.
- Bicycle/Pedestrian Mobility Plan for the Miami Downtown
Development Authority 2009 - This study will analyze existing street conditions,
traffic crash data, pedestrians and bicyclist counts and a user survey to recommended
improvements and implement strategies for improving walking and bicycling conditions
within Miami's Downtown Development Authority
(DDA) area. Started December 2009. Scheduled completion was September 2010.
Work by Kimley-Horn & Associates.
The budgeted cost is approximately $60,000. Download the
Final Report (March 2011). Contact
David Henderson at 305-375-1647 for complete details.
- Bicycle/Pedestrian Plan Update 2007 - This will prepare
an update to the MPO’s Bicycle and Pedestrian plans including a vision, measurable
goals and objectives, long range element and short range element. Topics include
on- and off-road networks, prioritized pavement and trail projects, bike parking,
Bike & Ride, safe routes to school, municipal coordination, encouragement and
safety. Started in September 2007 and completed October 2008. Work by
Gannett Fleming. The budgeted cost
was $98,711. Download the
Final Report (April 23, 2009). Contact
David Henderson at 305-375-1647 for
complete details.
- Bicycle and Pedestrian Traffic Count Program 2006
- Provide information on the current usage of bicycling and walking at selected
locations around the county for use in identifying and prioritizing improvements,
performing “before-and-after” evaluations of programs and facilities and provide
a baseline to monitor long-term trends. Started August 2006 and completed May
2008. by David Plummer & Associates.
The approximate cost was $64,075. Download the
Report (May 2008). Contact David Henderson
at 305-375-1647 for complete details.
- Bicycle Boulevard Planning Study 2009 - This study
will look at ways to improve conditions for bicycling through the development
of “bicycle boulevards” within the county. Started December 2008 and completed
October 2009. Work by Kimley-Horn
& Associates. The budgeted cost was $85,000. Download the
Final Report (December 2009) and
Field Review (April 2010). Contact
David Henderson at 305-375-1647 for complete details.
- Bicycle Facilities Plan 1997 The plan examined existing
roadway conditions relating to bicycle travel and proposed a set of improvements
of both on- and off-road facilities to incorporate into the TIP. Completed in
1997. Work by Barton-Aschman Associates. Download the
Executive Summary (1997). (SkyDrive)Contact
David Henderson at 305-375-1647 for
complete details.
- Bicycle Parking Plan for Miami-Dade Transit 2002
- The purpose of this study was to develop recommendations for new and improved
bicycle parking facilities at
Miami-Dade Transit
Metrorail stations,
park-and-ride lots and other transit hubs. Started in 2002. Work by by
Center for Urban Transportation Research
(CUTR) of the University of South Florida.
Download the
Final Report (2002) and
Presentation (2002). RESULTS: Phase 1 racks installed in 2006 (Dadeland
South – Earlington Heights
Metrorail Stations).
Phase 2 racks (Brownsville-Palmetto Stations and other transit hubs) to be installed
in Fall, 2008. Phase 3 (bike locker replacement in Winter, 2009). Contact
David Henderson at 305-375-1647 for
complete details.
- Bicycle Project Feasibility Evaluation 2003 - This
study (Work Order No. GPC11-02) was to evaluate seven high-priority bicycle
project through Miami-Dade County: the Commodore, Bird Road, NW 11th Street,
Palm Avenue, Red Road, North Federal Highway, and M-Path trails. Started August
2003 and completed March 2004. Work by
Kimley-Horn & Associates. Download
the
Final Report (November 2003). RESULTS: Under design. $1 million programmed
for design and construction in fiscal years 2008-2010 (GOB #127). Public workshop
on design scheduled for 6/30. Contact
David Henderson at 305-375-1647 for complete details.
- Bicycle Safety Education Program 2009 - Through this
project staff from the University of Miami's
Miller School of Medicine will develop,
evaluate and implement on-going and effective bicycle safety education programs
for middle school children and adults in cooperation with
Miami-Dade Park and Recreation.
Started November 2009 and completed August 2010. Work by
University of Miami and
Miami-Dade Park and Recreation.
The budgeted cost is approximately $50,000. Download the
Final Report (October 2010). Contact
David Henderson at 305-375-1647 for
complete details.
- Bicycle Safety Program Plan 2005 - This study used
Pedestrian and Bicycle Crash Analysis Tool (PBCAT) software developed for the
Federal Highway Administration (FHWA)
to identify common crash types occurring at locations throughout the County
and develop countermeasures to address the same. Completed March 2006. Work
by Cambridge Systematics. Download the
Executive Summary (March 2006) and
Final Report (March 2006). RESULTS: "Share the Road" and "Steer Clear" public
information material distributed. Washington Ave shared-use lane marking evaluation
underway by Miami Beach. Contact
David Henderson at 305-375-1647 for
complete details.
- Bikes-on-Bus Service Delivery in Dade County Study
1995 - The purpose of this study was to determine how a bike-on-bus program
for Dade County can enhance transit service and to identify ways to make such
a program successful and efficient. Please
visit our office to view or receive a copy of the report. Contact
David Henderson at 305-375-1647 for
complete details.
- Black Creek Trail Segment B Study 2006 - Complete
a feasibility and planning study to develop a single non-motorized multi-use
trail and linear park for "Segment B" within the right-of-way along Black Creek
Canal. Started August 2006 and completed October 2007. Work by
Kimley-Horn & Associates. The
approximate cost was $56,000. Download the
Executive Summary (October 2007) and
Final Report (October 2007). RESULTS: $900,000 programmed for construction
in fiscal year 2011 (FM #4209161). Contact
David Henderson at 305-375-1647 for
complete details.
- Bus Rapid Transit Opportunities Study 2003 - This
project will explore the potential for implementing relatively low-cost BRT
service in the major and secondary corridors and arterial streets that are anticipated
to have substantial bus service in place, and to identify the most feasible
types of BRT improvements that can be made. Started October 2003 and completed
March 2005. Work by the Center for Urban
Transportation Research (CUTR). Download the
Technical Memorandum No. 1 (October 2004),
Technical
Memorandum No. 2 (February 2005), and
Technical Memorandum No. 3 (April 2005). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Bus-on-Shoulder Service Evaluation Study 2007 -
This study will evaluate the operation of the “Bus on Shoulder” pilot project
implemented along SR-874 (Don Shula Expressway) and SR-878 (Snapper Creek Expressway).
Started September 2007 and completed January 2009. Work by Parson Transportation
Group. The approximate cost was $70,000. Download the
Executive
Summary (January 2009) and
Final Report (January 2009). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Central Dade Transport Zone Study 2007 - This study
looks at upgrading the infrastructure along the Miami River,
Miami International Airport, the
FEC Rail Yard, the Warehouse District,
the Free-Trade Zone and look at expansion of road facilities throughout the
district. Started September 2007 and completion August 2008. Work by
Kimley-Horn & Associates. The
approximately cost was $80,000. Download the
Executive Summary (August 2008) and
Final Report (August 2008). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Citizen's Guide to Transportation 2004 (also known
as Pocket Guide) - Created by FIU Metropolitan
Center. “On the Move... Miami-Dade County’s Pocket Guide to Transportation”
is the citizen's guide that provides transportation information to transit services,
various highway services, bikes on trains and buses, greenways, ParaTransit
and small mass transit services including vanpools, taxis, airport shuttles,
carpooling, etc., and the ports. Download the
Pocket Guide. Contact Elizabeth Rockwell
at 305-375-1881 for complete details.
- Citizen's Guide to Transportation 2007 (also known
as Pocket Guide) - Created by FIU Metropolitan
Center. “On the Move... Miami-Dade County’s Pocket Guide to Transportation”
is the citizen's guide that provides transportation information to transit services,
various highway services, bikes on trains and buses, greenways, ParaTransit
and small mass transit services including vanpools, taxis, airport shuttles,
carpooling, etc., and the ports. Download the
Pocket Guide, the
Spanish Edition, and the
Haitian Creole Edition. Contact Elizabeth
Rockwell at 305-375-1881 for complete details.
- City of Aventura Municipal Transit Study 1998 -
The objective was to implement a municipal public transit system to serve it's
3.2 square mile area which was previously serviced by
Miami-Dade Transit,
Broward County
Transit, and private shuttle systems. The study would recommend a system
with universal access to all residents of the
City of Aventura. Completed in
1998. Work by Bermello Ajamil & Partners,
Inc. Download the
Final Report (June 1998). Contact Oscar
Camejo at 305-375-1837 for complete details.
- City of Coral Gables Circulator System Study 1996
- Investigate the feasibility of a transit circulator along Ponce de Leon Boulevard
corridor which would provide connectivity to the Downtown/Miracle Mile area,
SW 8th Street, and the
Metrorail.
Completed in 2001. Work by David Plummer
& Associates. Download the
Report (May 2001). Contact Larry Foutz
at 305-375-1522 for complete details.
- City of Doral Transportation Master Plan 2005 -
This report identified existing and future multi-modal transportation deficiencies
and establish a program of transportation improvements in the
City of Doral. Started March 2005
and completed May 2007. Work by the The
Corradino Group. Download the
Executive Summary (May 2007) and
Final Report (May 2007). Contact Oscar
Camejo at 305-375-1837 for complete details.
- City of Doral Transportation Master Plan Update 2009
- To study the existing and future conditions of the transportation system within
the City of Doral, including the roadway
network, the transit system, the pedestrian and bicycle network and to determine
how each interacts with the existing and future land uses. Started in February
2010 and completed August 2010. Work by the
City of Doral. Budgeted cost at $40,000.
(Includes an MPO award of $40,000 and
Doral's contribution of $66,000.) Download the
Plan Update (2010). Contact Oscar Camejo
at 305-375-1837 for complete details.
- City of Hialeah Circulator Study 1997 - The objective
of this study was to explore the feasibility of implementing a local bus service
for the City of Hialeah. The service
would be coordinated with other public transportation providers in the area.
Additionally, the study included available funding sources to implement the
service. Download the
Final Report, October 1998. Contact
Larry Foutz at 305-375-1522 for complete
details.
- City of Homestead Downtown Area Transportation Plan
Update 2003 - Updates the 1997 Homestead Traffic and Mobility Study, to
resolve numerous transportation planning issues in
Homestead's congested urban core.
Specific measures to alleviate congestion have been recommended, but consensus
has not been reached on methods of traffic calming, location for truck routes
within the historic district, and bicycle lane placement vs. parking needs.
Also, new transportation planning projects such as the Urban Transit Village
and the new busway stop locations need to be incorporated in the existing plan.
Started November 2003 and completed December 2005. Please
visit our office to view or receive a copy of this report. Contact
Larry Foutz at 305-375-1522 for complete
details.
- City of Miami Beach Municipal Mobility Plan 1998
- The establishment of a transportation master plan for the
City of Miami Beach. Completed December
1998. Work by The Corradino Group. Download
the
Executive Summary and
Vision Statement. Contact Amelia Lopes-Johnson,
City of Miami Beach, at 305.673.7550
for complete details.
- City of Miami Car-Sharing Feasibility Study 2009
- Also known as the Feasibility Study to Implement Car-Sharing Programs. Evaluate
the feasibility of implementing a car sharing program in the
City of Miami, identify
the benefits and the costs to the community. Started March 2010 and completed
July 2011.Work by the City
of Miami. The approximate cost is $25,000. Download the
Final Report (September 2011) and
Presentation (September 2011).Contact
Thomas Rodrigues at 305.416.1020
or Lilia I. Medina at 305.416.1080
for complete details.
- City of Miami Gardens Transportation Master Plan 2004
- This study will develop Miami Gardens'
first transportation master plan as part of their Comprehensive Development
Master Plan. Completed March 2006. Work by
The Corradino Group. Download the
Executive Summary (April 2006) and
Full Report (May 2006). Contact Larry
Foutz at 305-375-1522 for complete details.
- City of Miami Health District Bicycle and Pedestrian
Mobility Study 2011 - PENDING. A description for this study is forthcoming.
Contact project manager below for information. Started January 2011. Scheduled
completion is January 2012. Work by the City
of Miami. The budget is approximately $48,000. STATUS: 90% complete. (September
2010) Contact Larry Foutz at 305-375-1522
for complete details.
- City of Miami Springs 36th Street District Traffic
Impact Study 2008 - Analyze impacts on traffic in
Miami Springs along NW 36th Street.
Study schedule to be determined. Started January 2009 and completed December
2009. Work by David Plummer & Associates,
for the City of Miami Springs.
The budgeted cost was approximately $20,000. Download the
Final Report (April 2009). Contact
Wilson Fernandez at 305-375-1886 for complete details.
- City of Miami Springs Traffic Circulation and Parking
Study for Westward Drive 2010 - ONGOING . To perform a traffic circulation
and parking analysis to support the
City of Miami Spring’s initiative
of revitalization and renewal of its downtown commercial core. The analysis
will include examination of collecting current conditions data, assessment of
vehicular, bicycle and pedestrian conflicts, identification of deficiencies
and evaluate potential improvements. Started January 2011 and scheduled to complete
January 2012. Work by the City of
Miami Springs. The budget is approximately $16,000. STATUS: Awaiting final
report. (September 2011) Contact Wilson
Fernandez at 305-375-1886 for complete details.
- City of North Miami Beach Community Mobility Program
2002 - A logical extension of the S.R. 826 Study and City Center Design
Charrettes. It defines relationships between previous studies and provides a
detailed work program for implementation. Work done by Chatterton Consulting.
Download the
Final Report (2003), and
Project Bank and Work Plan (2003). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- City of North Miami Beach Fulford City Center
Geometric Roadway Design Study 2003 - A look at creating a town center environment
in an area called Fulford City Center within the
City of North Miami Beach.
Started April 2003 and completed May 2004. Work by
Glatting Jackson Kercher Anglin Lopez Rinehart,
Inc. Download the
Final Report (April 2003). Contact
Larry Foutz at 305-375-1522 for complete details.
- City of North Miami Beach Pedestrian & Bicycle Safety
Analysis Study 2004 - This study lays the groundwork for a network of trails
and bikeways in North Miami Beach,
including the existing Snake Creek Trail. Studied from March 2004 to December
2004. Work by Dover, Kohl and Partners
(under contract to the City of
North Miami Beach). Download the
Safety Analysis (December 2004). Contact
David Henderson at 305-375-1647 for
complete details.
- City of North Miami Bike, Park and Ride Study 2007
- Formerly called North Miami Bicycle Parking and Transit Circulator Feasibility
Study. This will complete a comprehensive bicycle planning and transit circulator
feasibility study to provide better bicycle facilities and identify strategies
that will create greater connectivity between bicycle and public transit systems.
Started October 2007 and completed June 2009. Work by the
City of North Miami and
Kimley-Horn & Associates. The
approximate cost was $55,258 as part of the
Municipal Grant Program. Download the
Final Report (June 2009) and
Presentation (June 2009). Contact
David Henderson at 305-375-1647 for complete details.
- City of South Miami Hometown Intermodal Transportation
Study 2002 - Reevaluate earlier transit-related studies concerning the
City of South Miami central business
district and immediate surrounding area (Hometown District) and develop a multimodal
mobility plan. Completed in August 2002. Work by
Kimley-Horn & Associates. Download
the
Draft Technical Memorandum #3 (June 2002) and
Final Report (August 2002). Contact
Susan Schreiber at 305-375-1887 for
complete details.
- City of South Miami Trolley/Circulator Feasibility
Study 2006 - Develop a plan for the establishment of a pilot service program
that would integrate the City of
South Miami's trolley service with other area shuttle and trolley services.
Started August 2006 and completed August 2007. Work by
Parsons Transportation Group. The approximate
cost was $75,000. Download the
Executive Report (August 2007) and
Final Report (August 2007). Contact
Larry Foutz at 305-375-1522 for complete
details.
- City of South Miami US-1 Pedestrian Overpass Study
2000 - Completed by McHarry Associates.
Investigate and document the potential locations and configurations for a pedestrian
overpass across US-1 (South Dixie Highway). Download the
Report. Contact David Henderson
at 305-375-1647 for complete details.
- City of Sunny Isles Bridge to Link a Pedestrian/Bicycle
Greenway Study 2003 - Sunny Isles Bridge to Link a Pedestrian/Bicycle Greenway
on North Bay Road at NE 172 Street. Studied from December 2003 to December 2004.
Work by Calvin Giordano & Associates
(under contract with the City of Sunny Isles
Beach). Download the
Study Summary (September 2004). Contact
David Henderson at 305-375-1647 for
complete details.
- Civic Center TMO Commuter Characteristics Study 1994
- This study's main purpose was to investigate current pedestrian activities
within the Civic Center area and to develop a Pedestrian Amenities Plan. This
plan included safety issues that were also addressed in the plan. Completed
in December 1997. Work by Center for Urban
Transportation Research (CUTR) of the University
of South Florida. Download the
Executive Summary (February 1998) and
Final Report (December 1997). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Civic Center TMO Pedestrian Amenities and Safety Study
- To identify travel characteristics of employees, students, and visitors in
the Civic Center area, locate transportation facilities within the area, develop
a commuter characteristics data file, and prepare an action plan to implement
short and long term TDM strategies. Work by Barton-Aschman Associates. Please
visit our office to view or receive a copy of this report. Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Coastal Communities Transportation Master Plan 2006
- Produce short-, mid- and long-term multimodal solutions to transportation
issues to the barrier island communities. Study the existing and future sub-regional
transportation network through data collection, analysis and public involvement.
Develop a multimodal list of projects and costs estimates. Prioritize projects
into an implementable 10-year plan. Started February 2006 and completed June
2007. The final cost was $111,546. Download the
Final Report (August 2007). Contact
Wilson Fernandez at 305-375-1886 for
more details.
- Coconut Grove Planning Study 1996 - For the development
of a master plan for the Coconut Grove area which preserves the historical background
of this community, reduce the negative impact of traffic flow, improve parking
conditions and enhance the landscaping of the area. A review of land use policy
and regulations is also included. Started April 1996 and completed October 1997.
Work by Andres Duany and Elizabeth Plater-Zybeck, Architects, Inc.; Carr Smith
and Associates; etc. Please
visit our office to view or receive a copy of this report. Contact
Larry Foutz at 305-375-1522 for complete
details.
- Compare Transit Survey Results Study to Actual Count
Data 2010 - To present the analysis of the Metrorail survey results in terms
of riders' trip making characteristics and the spatial distribution of Metrorail
trips in the region. Started February 2010 and completed September 2010. Work
by Gannett Fleming. The budget
is $79,832. Download the
Final Report (September 2010). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Comprehensive Parking Study for Freight Transport
in Miami-Dade County Study 2009 - This study will look at the provision
of overnight parking for long-haul truckers and for locals independent truckers
who need a location to store their trucks when not in use. Started December
2009 and completed September 2010. Work by
Marlin Engineering. The budgeted
cost is approximately $65,000. Download the
Final Report (September 30, 2010). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Community Characteristics Project Phase V 2008 -
This involves the creation of a web-based application that enables transportation
planners and public involvement offices (PIOs) to create an effective PI program
and accomplish stated Title VI goals that will ultimately allow the identification
of the attitudes and issues facing that particular community. Started January
2008 and completed January 2009. Work by Florida
International University. The approximate cost was $60,000. RESULTS:
Miami-Dade Transportation and Community
Mapping website. Contact Elizabeth
Rockwell at 305-375-1881 for complete details.
- Community Characteristics Project Phase VI 2009
- The objective is to review the social, economic, and geographic characteristics
of an area before public involvement (PI) outreach is initiated. The next cycle
(phase) will be called Integrated Transportation Information System 2009. Started
January 2009. Expected completion in March 2010. Work by
Florida International University. The approximate
cost is $63,000. Download the
Scope of Services 2006-07. RESULTS: A
ITIS website was developed to
replace the Miami-Dade Transportation and
Community Mapping website. Contact
Elizabeth Rockwell at 305-375-1881 for complete details.
- Congestion Intersection Improvement Study Phase II
2006 - Evaluate congested intersections and recommend short-term traffic
operational improvements for alleviating traffic congestion. Started August
2006 and completed March 2008. Work by David
Plummer & Associates. The approximate cost was $97,900. Download the
Executive Summary (March 2008),
Volume I (March 2008),
Volume II (March 2008), and the
Presentation (March 2008). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Congestion Management Process (CMP) Update 2009 -
This study will update the Congestion Management System (CMS) to reflect the
new Federal requirement established under
SAFETEA-LU. This update
will be incorporated in the 2035 LRTP, as a planning tool, as recommended in
the 2007 Miami-Dade MPO Federal Certification. Started September 2008 and completed
November 2009. Work by Gannett Fleming.
The approximate cost is $79,439. Download the
Executive Summary (October 2009) and
Final Report (October 2009). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Congestion Management System Update Study 2003 -
This updates the CMS/MMP. It also establishes a Study Advisory Committee and
web-based nationwide research regarding activities conducted in other cities
to alleviate traffic congestion. Based on these findings,
Kimley-Horn developed criteria
to determine the congested corridors within the county, and identified strategies
to improve mobility there. Started October 2003 and completed November 2004.
Work by Kimley-Horn & Associates.
Download the
Final Report (November 2004). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Coral Gables Trolley Route Expansion Study 2005
- Assess the feasibility of routes that connect the
Coral Gables Trolley to the Flagler
Street corridor, the MacFarlane Homestead
Historic District, the University of Miami, and the Riviera Business District.
And identify preliminary trolley stops/spacing. Completed in early 2006. Work
by David Plummer & Associates. Download
the
Executive Summary (2006),
Feasibility Report (March 2006), and
Presentation (2006). Contact Irma San
Roman at 305-375-4507 for complete details.
- Countywide High-Crash Location Safety Study 2009
- Identify traffic safety concerns and recommend countermeasures to improve
the operational safety of twenty high-crash locations county wide. Started March
2010. Scheduled completion is February 2011. Work by
Miami-Dade Public Works. The
budgeted cost is approximately $75,000. Download the
Final Report (February 2011) and
Appendices (February 2011). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Countywide Park and Ride Facilities Study 2009 -
Also known as Miami-Dade Countywide Consolidated Park-and-Ride Facilities Plan.
Examine planned and future Park & Ride facilities at express and priority transit
lines. Started January 2010 and completed October 2010. Work by
David Plummer & Associates. The budgeted
cost is $35,000. Download the
Final Report (October 2010). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Countywide Parking Policy Study for Miami-Dade County
1999 - This phase is a very comprehensive study which includes a set of
recommended parking policies and strategies by area of action, from coordination
to enforcement. Completed in August 1999. Work by Barton-Aschman Associates,
Inc; Parsons Transportation Group. Download
the
Executive Summary (October 1999) and
Final Report (August 1999). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Countywide Traffic Safety Program 2008 - ONGOING.
To adopt a GIS-based, countywide crash data system that will allow traffic engineers
to analyze crashes on all county roads to determine priority locations and predominant
crash types to identify appropriate engineering solutions. The system will allow
users to identify and map the high crash locations based on aggregation of crashes
to intersection and street segments using crash counts, rates and severity index.
In addition, the system will provide diagrams, tables, charts and summarized
reports. Started January 2008. Expected completion was December 2008. Work by
the University of Florida. The budgeted cost
is approximately $100,000. Contact David
Henderson at 305-375-1647 for complete details.
- CSX Corridor Evaluation Study 2008 - This study
will evaluate the feasibility of re-directing rail freight traffic outside the
urbanized Kendall area and examine various concepts to introduce rapid transit
service along the CSX rail corridors south of the Oleander Junction. Started
July 2008 and completed June 2010. Work by
Parsons Transportation Group.
The cost was approximately $138,500. Download the
Final Report (August 2009) and
Presentation (January 2009). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Curtiss Parkway/NW 36 Street Traffic Study 2005
- A study to assess the impact on traffic flow at the intersection of Curtiss
Parkway and NW 36th Street that would be caused by the
City of Miami Springs' proposed
redevelopment of that area. Started December 2005 and completed May 2006. Work
by David Plummer & Associates. Download
the
Final Report (May 2006). Contact Larry
Foutz at 305-375-1522 for complete details.
- Cutler Bay Town-Wide Bicycle and Pedestrian Master
Plan 2010 - Create a vision for non-motorized transportation within of
Town of Cutler Bay and develop projects
or policies and performance measures to accomplish that vision. The report developed
will serve as the non-motorized component of
Cutler Bay's transportation and capital
improvement elements to its Growth Management Plan (comprehensive plan). Started
January 2011 and completed August 2011. Work to be performed by the
Town of Cutler Bay. The cost is approximately
$40,000. Download the
Master Plan (August 2011). Contact Oscar
Camejo at 305-375-1837 for complete details.
- Dadeland Regional Activity Center Study 1997 - The
objective of this study is to develop a set of planning activities to be implemented
for improving mobility in the Dadeland Regional Activity Center area. Download
the
Implementation Measures Report (September 1998) and
Specific Area Planning Report For Improving Mobility (September 1996). Contact
Susan Schreiber at 305-375-1887 for
complete details.
- Develop Procedures and Criteria for Establishing
School Crossing Guard Locations 2010 - ONGOING. Develop a tool to assist
local police departments to objectively rank locations for crossing guards around
schools based on factors such as the characteristics of roadways, traffic and
the student population. Started August 2011. Completion date set in 2012. Work
by HTNB. The approximate
cost was $89,989. STATUS: 25% completed. (September 2011) Contact
David Henderson at 305-375-1647 for
complete details.
- Development of a Service Plan for Waterborne Transportation
Services in Miami-Dade County 2004 - This study would develop a water transit
service plan that would offer alternatives to local commuters driving single
occupant private automobiles, and provide viable and attractive mobility options
for visitors. Contact Jesus Guerra
at 305-375-2069 for complete details. Completed January 2005. Work by
Kimley-Horn & Associates. Download
the
Executive Summary (2005),
Final Report (December 2004),
Presentation (2005) RESULTS:
Water Transit Service Executive Summary Report (March 2007).
- Doral Circulator Study 2006 - Examined potential circulator
transit in the City of Doral by examining
the existing service, the population demographics of income and transit dependency,
as well as potential user groups. Started July 2006 and completed June 2007.
Work by The Corradino Group. The approximate
cost was $34,800. Download the
Final Report (May 2007). Contact Larry
Foutz at 305-375-1522 for complete details.
- Downtown Kendall Transportation Study 2002 - This
study provides the Miami-Dade Planning
& Zoning Department with documented information on the transportation related
impacts associated with modifying roads in the Downtown Kendall Urban Center
District. Work by Gannett Fleming.
Please
visit our office to view or receive a copy of this report. Contact
Carlos Roa at 305-375-4507 for complete
details.
- East West Corridor Study - The East-West Corridor is
a multimodal solution for severe traffic congestion along SR 836, the only east-west
expressway in central Miami-Dade County. The project combines highway and transit
improvements, running along SR 836 and connecting the
Florida International University, the
Miami Intermodal Center (MIC), downtown
Miami and the
Port of Miami. The estimated
cost is $1.7 billion. Download various study documents from our
MPO Library. (SkyDrive) RESULTS: Construction began January 2003
on the MIC or Orange Line Phase 1 by Earth
Tech. Tentative completion is May 2011. Preliminary engineering for the Orange
Line Phase 3 has begun. Contact Wilson
Fernandez at 305-375-1886 for complete details.
- Economic Impact of Parking Policy Options 1986 -
Conducted for the Miami Downtown Development
Authority's Parking Task Force to present a summary evaluation of the economic
impact of recommended parking policy alternatives for downtown
Miami. Completed October 1986. Work by
Zuchelli, Hunter & Associates. Download
the
Final Report (October 1986). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Effects of Transportation Plan Development on Minority
and Impoverished Urban Communities 1998 - Conducted for the
University of South Florida (USF) to determine
the effects of the transportation plan on minorities and impoverished urban
communities. Work by Beverly G. Ward and Eric T. Hill. Download the
Final Report (June 30, 1998). (SkyDrive) Contact
Elizabeth Rockwell at 305-375-1881
for complete details.
- Electric Transit Circulator Feasibility Study 2000
- Explored possibilities and problems of implementing local transit circulators
that would run on electric or hybrid-electric vehicles. Started in 2000 and
completed June 2001. Work by the Center for
Urban Transportation Research (CUTR). Download the
Final Report (June 2001) and
Presentation (2001). Contact Jesus
Guerra at 305-375-2069 for complete details.
- Electrowave Shuttle Report 1998 - This study summarized
the activities and results of the ELECTROWAVE shuttle service implemented in
the Miami Beach area during 1998.
Please
visit our office to view or receive a copy of this report. Contact Judy
Evans, Miami Beach TMA Executive Director, at 305.535.9160 for complete details.
- Evaluation of Current Methodology to Determine Traffic
Concurrency 2010 - ONGOING. The purpose of this study is to assess the current
methodology and recommend a preferred transportation concurrency management
system for Miami-Dade County. Started August 2011. Completion date set in 2012.
Work by Jacobs Engineering.
The budget is approximately $65,000. STATUS: 10% complete. (September 2011)
Contact Jesus Guerra at 305-375-2069
for complete details.
- Feasibility of Implementing Tech Centers in Miami-Dade
County 2004 - The objective was to assess the feasibility of implementing
technology centers to alleviate traffic congestion as an alternative means of
maximizing the efficient use and capacity of limited transportation recourses.
Completed in July 2006. Work by the Center
for Urban Transportation Research (CUTR). Download the
Executive Summary (July 2006) and
Final Report (July 2006). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Feasibility of Utilizing Miami-Dade County Waterways
for Urban Commuter Travel 2002 - This study assesses the feasibility of
using the existing waterways within the Urban Growth Boundary of Miami-Dade
County for commuter travel. Completed January 2003. Work by
Gannett Fleming. Download the
Final Report (January 2003). Contact
David Henderson at 305-375-1647 for
complete details.
- Feasibility Study: A Public-Private Partnership
for Transit Vehicle Purchasing and Leasing 1998 - Determine the feasibility
of using Miami-Dade Expressway Authority
(MDX) funds to serve as the local match for federal grants to purchase small
transit vehicles. These vehicles would then be leased to private or public sector
operators to provide additional public transit services that would complement
existing transit services. Started in 1998 and completed January 1999. Download
the
Report (January 1999). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for complete
details.
- Feasibility Study: Northside Intermodal Terminal 1985
- It recommends the construction of an intermodal transportation facility with
integrated parking structure at the
Northside Metrorail
Station. The proposed terminal would accommodate major
Metrobus operations
and a pedestrian overpass. Completed in 1986. Work by the Metro-Dade Transit
Administration (now Miami-Dade
Transit). Download the
Report (February 1986). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for complete
details.
- Fiber Optic Communications Concept Plan for Miami-Dade
County's Intelligent Transportation Infrastructure 1998 - Defining a conceptual
plan for establishing a fiber optic communications network capable to support
Miami-Dade County's intelligent transportation system infrastructure. Completed
in 1998. Work by Center for Urban Transportation
Research (CUTR). Download the
Final Report (June 1998). (SkyDrive) Contact
Carlos Roa at 305-375-4507 for complete
details.
- Flagler Street Reversible Flow Study 1992 - This
study would provide a more in-depth analysis of the pros and cons of providing
reversible traffic flow on certain lanes of West Flagler Street between 27th
Avenue and the Palmetto Expressway. Completed in May 1992. Work by Transport
Analysis Professionals, Inc. Download the
Final Report (May 1992). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Florida East Coast (FEC) Transit Connection Study 2009
- A status report on recent developments and evaluate the feasibility of implementing
transit services along FEC corridor from
MIA to the Dadeland area to complement
a planned bicycle trail facility also known as the Ludlam Trail project. Started
July 2008. Expected completion is July 2010. Work by
Kimley-Horn & Associates. The
approximate cost was $70,000. Download the
Executive Summary (December 2009) and
Final Report (December 2009). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Freight Movement Study 1996 - Review assumptions made
in the original Freight Movement Study concerning trucks and surface freight
movement in the MPO's urban area travel model; review the status of recommendations
made in the original study; investigate how e-business affects local area freight
movement; and reestablish the
Freight Transportation Advisory Committee (FTAC). Completed in December
1996. Work by The Corradino Group. Download
the
Executive Summary (December 1996) and
Final Report (December 1996). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for complete
details.
- Golden Glades Multimodal Transportation Facility Feasibility
Study 1994 - This study evaluates the feasibility of different conceptual
designs for developing a multimodal facility at the Golden Glades Interchange,
located in north central Miami-Dade County. Completed March 1994. Work by
ICF Kaiser. Download the
Executive Summary (March 1994) and
Final Report (March 1994). (SkyDrive) Contact
Carlos Roa at 305-375-4507 for complete
details.
- Health District Comprehensive Traffic Study 2008
- This study would document the traffic impacts of both the recent and forecast
growth within the Health District/Civic Center Area. Performed between February
2008 and May 2009. Work by The Corradino
Group. The approximate cost was $170,000. Download the
Final Report (May 2009). Contact Larry
Foutz at 305-375-1522 for complete details.
- Hialeah Transit System Express Service Feasibility
Study 2009 - This study is an examination of the
City of Hialeah's existing circulator
routes to optimize operations, maximizing its positive impact on the community.
Began June 2010 and completed December 2011. Work by
The Corradino Group for the
City of Hialeah. The estimated cost
is $20,000. Download the
Final Report (February 2011). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Hialeah Transit System Services And Opportunities
Study 2003 - This study looked into improving the
Hialeah Transit
Service (HTS) and evaluating performance of the newly implemented system
and recommending any adjustments. Completed December 2003. Work by
The Corradino Group. Download the
Final Report (December 2003). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- I-395 Alternatives Financial Assessment Study 2002
- The objectives were to review the three alternatives to replace the existing
I-395 structure, develop two new potential alternatives that can more effectively
meet the objectives of the stakeholders involved, and perform a financial analysis
to determine the financing necessary to implement the recommended solution.
The basic goal of this study is to reach a consensus among
FDOT, the MPO, and the
City of Miami as to a viable alternative,
which will allow FDOT’s I-395 Project
Development & Environment (PD&E) study to recommence. Started in 2002 and completed
April 2004. Work by Kimley-Horn &
Associates. Download the
Final Report (April 2004) and the
Pre-study Review (July 25, 2002). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Implementation of Advanced Warning in School Speed
Zones Study 2011 - Formerly called Implementation of Transitional Speed
Zones in School Zones Study. To evaluate the feasibility of creating an extended
school zone to reduce the speed limit of the roadway by 10 miles per hour (MPH)
as a buffer zone before the regular 15 mph school zones. Started February 2011
and completed March 2012. Work by
Marlin Engineering. The budget
is approximately $54,500, including contingencies. Download the
Executive Summary (March 2012) and
Final Report (March 2012). Contact
Wilson Fernandez at 305-375-1886 for complete details.
- Improving Access in FIU Biscayne Bay Campus Area
2010 - This study will evaluate the feasibility of adding another entrance
to the Florida International University (FIU)
Biscayne Bay Campus. Started August 2010. Expected completion in February 2011.
Work to be performed by Kimley-Horn
& Associates. The estimated cost is $55,000 ($35,000 for Phase I and $20,000
for Phase II). Download the
Executive Summary,
Final Report, and
Presentation (October 2011). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Improving Regional Transportation Planning 2012 -
PENDING. This study would document the traffic impacts of both the recent and
forecast growth within the Health District/Civic Center Area. Schedule to be
determined. Work by South Florida Regional Planning
Council. The budgeted cost is approximately $25,000. STATUS: Pending agreement.
(September 2011) Contact Susan Schreiber
at 305-375-1887 for complete details.
- Indirect Left Turns Study 2007 - This study will
address the potential of increasing efficiency and capacity at major intersections
in Miami-Dade County through the elimination of left turns and replacing them
with right turn loops. Started in November 2007 and completed December 2008.
Work by David Plummer & Associates. The
approximate cost was $50,000. Download the
Executive Summary (December 2008),
Final Report (December 2008), and
Presentation (2009). Contact Wilson
Fernandez at 305-375-1886 for complete details.
- Integrated Transportation Information System (ITIS) 2010
- ONGOING. Formally known as the Community Characteristics Program (CCP). It
is now a regional web-based tool, that enables transportation planners and public
involvement offices to create an effective public involvement program and identify
the attitudes and issues facing that particular community. PI strategies
are modified according to community characteristics, such as, but not limited
to, literacy rates, income levels, cultural composition and religious affiliation.
ITIS allows staff to tailor its outreach approach to determine a community’s
stand on a project and work with that community to gather support. Started July
2010. Expected completion is June 2012. Work by
Florida International University. The approximate cost is $120,000. STATUS:
65% completed. (September 2011) Contact
Elizabeth Rockwell at 305-375-1881 for complete details.
- Integrated Transportation Management System (ITMS) 1998
- The ITMS is based on a GIS platform which incorporates different data sources
to generate reports, tables, maps and graphics, as an excellent working tool
in the decision-making process. The ITMS includes the following management systems:
Congestion (CMS), Pavement (PMS), Intermodal (IMS), Public Transportation (PTMS),
Safety (SMS) and the Traffic Monitoring System for Highways (TMS/H). Work by
David Plummer & Associates. Download
the
Final Report (November 1998). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Intelligent Transportation System Plan for Dade County
1996 - Created to establish a general policy planning process for ITS projects,
and coordinate and integrate all efforts conducted by different entities in
the same area. Completed July 1996. Work by the MPO staff. Download the
Report (July 1996). (SkyDrive) Contact
Carlos Roa at 305-375-4507 for complete
details.
- Intelligent Transportation System Plan Update for
Miami-Dade County 1999 - Indentifies ITS enabling projects that are most
critical in deployment of a regional ITS system, as well as other ITS "enhancements"
to traditional transportation improvement projects and services that are location
specific. Work by the Center for Urban Transportation
Research. Download the
Final Report (June 1999). (SkyDrive) Contact
Carlos Roa at 305-375-4507 for complete
details.
- InteracTIP 2003 - This endeavor automated the
annual development of the TIP. Emphasis was made on improving consistency; making
the TIP book more user-friendly; creating special reports to answer questions
from the general public; facilitating the analysis of the data; and providing
easy access to information by the public on the internet via Miami-Dade's My
Neighborhood website. Updates: 2007 update - Completed in July 2007. Resulted
in the InteracTIP 2008 website (defunct). 2008 update - Developed from January
2008 to November 2008. The approximate cost was $54,700. Resulted in the InteracTIP
2009 website (defunct), and InteracTIP MAPS website (defunct). 2009 update -
Started March 2009 and completed January 2010. The cost was $55,000. Resulted
in the first version of the InteracTIP 2010 website (defunct). Completed in
January 2004. Work by David Plummer & Associates
and International Development Analysis Services
(IDAS). Download the
Executive Summary (2004),
Final Report (October 2003), and
Presentation (2004). RESULTS: InteracTIP website. Starting with the 2011
Transportation Improvement Program, the InteracTIP Project Tracking Program
will be conducted annually. Contact Carlos
Roa at 305-375-4507 for complete details.
- Interactive Transportation Information Systems (Kiosk)
1997 - To provide better information to travelers in the trip decision making
process, in order to increase overall mobility in the area. Completed in December
1997. Work by Center for Urban Transportation Research (CUTR). Please visit
our office to view or receive a copy of this report. Contact
Jesus Guerra at 305-375-2069 for complete
details.
- Investigation of Alternative TMAs 1994 - This study
was conducted to investigate alternative Transportation Management Associations
(TMA) whose programs were not solely employer-based. Started in 1994 and completed
October 1994. Work by Barton-Aschman & Associates. Download the
Report (October 1994). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Kendall Drive Mobility Enhancement Study 2002 -
This study was to develop improvement alternatives for potential
FDOT and
MDT work programs along Kendall
Drive (SW 88th Street/SR94). Completed September 2002. Work by
Gannett Fleming. Download the
Final Report (September 2002). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Kendall-Link Alternatives Analysis Study 2005 -
The study was a re-evaluation alternative analysis for rapid transit improvements
in the Kendall Corridor area (along Kendall Drive/SW 88th Street from the Dadeland
area to SW 157th Avenue) connecting both to existing and future Metrorail facilities
in the Dadeland and FIU areas. The study will lead to the selection of a locally
preferred alternative which will consist of rapid transit improvements. Started
November 2005 and completed September 2007. Work by
Edwards & Kelcey. The approximate cost
was $873,000. Download the
Kendall-Link documents. Contact Wilson
Fernandez at 305-375-1886 for complete details.
- LeJeune Road Corridor Traffic Impact Study 1996
- A study to identify and evaluate potential low-cost improvements for the area
defined by LeJeune Road, South Royal Poinciana Boulevard, and NW 36th Street.
Completed July 1996. Work by Kimley-Horn
& Associates. Download the
Draft Final Report (July 1996). (SkyDrive) Contact
Oscar Camejo at 305-375-1837 for complete
details.
- Local Municipal Transit Circulator Policy Study 2002
- The objectives of this study are: 1) to develop a set of guidelines and standards
for implementing transit circulators; and 2) to develop performance measures
for evaluating implemented transit circulators. Completed in June 2002. Work
by Kimley-Horn & Associates. Download
the
Executive Summary (2002) and
Final Report (2002). Contact Wilson
Fernandez at 305-375-1886 for complete details.
- Locate Sites for Bus Shelter Installations Study 2008
- Identify sites suitable for the immediate installation of bus shelters. Started
November 2008 and completed December 2009. Expected completion was July 2009.
Work by David Plummer & Associates. The
approximate cost was $56,448. Download the
Executive Summary (November 2009) and
Final Report (November 2009). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Ludlam Trail Non-Motorized Corridor Planning Environmental
Study 2003 - The Ludlam Trail is a non-motorized transportation route through
the county's urban core, expanding the traveler’s transportation options, enhancing
the quality of life, and reducing single-occupant automobiles. Running northward
from Dadeland
North Metrorail Station to NW 12th Street/Perimeter Road next to
MIA, it is 7 miles along the
FEC Railway parallel to and west of Ludlam
Road/67th Ave. Completed in March 2003. Work by
Reynolds, Smith & Hills, Inc. Download
the
Final Report (March 2003). Contact
David Henderson at 305-375-1647 for complete details.
- Metro-Dade Road Pricing Study 1994 - This studied
if the county's congestion could be mitigated through creative pricing solutions
that would provide motorists, particularly single occupant vehicles (or SOV),
with financial incentives sufficient to alter their travel behavior. Started
in 1994 and completed early-1995. Work by
Kimley-Horn & Associates, Barbara
Howard & Associates, and Kittelson
& Associates. Download the
Final Report (May 1995). (SkyDrive) Contact
MPO Staff at 305-375-4507 for complete
details.
- Metropolitan Dade County Comprehensive Bicycle Plan
1986 - Identifies projects and strategies to meet the most pressing needs
of bicyclists in the urban area. This plan represents the first major planning
effort addressing needed bicycling-related improvements in Dade County since
the publication of the 1972 Dade County Bikeways Plan. Download the
Comprehensive Bicycle Plan (August 1986). (SkyDrive) Contact
David Henderson at 305-375-1647 for
complete details.
- Metropolitan Planning Organization Congested Intersections
Study 1999 - This study was developed to support the Resourceful Use of
Streets and Highways (RUSH) Program recommended in the Miami-Dade Congestion
Management System (CMS). A criteria was developed to evaluate over 150 intersections.
Traffic improvements were recommended for 20 locations. Download the
Report (June 1999). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Metrorail M-Path Master Plan 2006 - It addresses
operational issues and problem areas within the M-Path bicycle/pedestrian corridor
originally created in 1983. The corridor runs from the Miami River to SW 67th
Avenue along US-1 (South Dixie Highway). Started August 2006 and completed July
2007. Performed by Kimley-Horn & Associates.
The approximate cost was $55,000. Download the
Executive Summary (July 2007) and
Final Report (July 2007). RESULTS: $1.7 million of GOB and FTA funds available
in current year for design and construction of recommended improvements. Project
management to be coordinated by CMO. Contact
David Henderson at 305-375-1647 for
complete details.
- Metrorail/Coconut Grove Connection Study Phase II
2004 - This study examines the feasibility of implementing an exclusive
right-of-way transit connection between the
Metrorail line
and the Coconut Grove Village Center. It looks at possible transit modes, local
systems implemented or planned, national and international research, and a comparative
analysis of transit alternatives for the project. Completed in January 2007.
Work by Reynolds, Smith & Hills, Inc.
The cost was approximately $75,000. Please
visit our office to view or receive a copy of this report. Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Miami Beach Intermodal Feasibility Study 1999 -
Requested by the City of Miami Beach
to perform an intermodal transit center feasibility study for it's electric
shuttle (ElectroWave). Completed August 2000. Work by
Corradino. Please
visit our office to view or receive a copy of this report. Contact
Susan Schreiber at 305-375-1887 for
complete details.
- Miami Beach Master Plan for the 16th Street Corridor
Study 2004 - Identified the needs and ascertain the feasibility of operational
improvements for the implementation of a pedestrian-friendly environment along
16th Street from Bay Road to Collins Avenue, in the
City of Miami Beach. Started September
2004 and completed March 2007. Work by McMahon
Associates. The study cost was $75,000. STATUS: Awaiting final report. Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Miami Civic Center Circulator Study 2005 - As part
of an economic development plan developed for the
City of Miami, this study would determine
the feasibility of a circulator system to serve the Civic Center area. Started
in 2005 and completed February 2006. Work by
The Corradino Group. Download the
Final Report (February 2006). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Miami Civic Center Circulator Study Phase II 2007
- As a continuation of Phase I, it will focus in more detail on implementation,
routes and cost estimates, contractual management and operation options analysis,
and financing plan. Started in April 2007 and completed December 2008. Work
by The Corradino Group and the
City of Miami's Office of Grant Administration.
The approximate cost was $48,000. Part of the
Municipal Grant Program. RESULTS: Preparation of a Request for Proposal
(RFP) that was submitted to the Florida Department of Transportation (FDOT)
for consideration and proper action. Contact
Larry Foutz at 305-375-1522 for complete
details.
- Miami Downtown Transportation Master Plan 2001 -
Cooperatively funded by the City of Miami,
the MPO, and FDOT. The DTMP will result
in a guide for the city and its transportation
planning partners in planning for the future downtown transportation system,
and provide help in evaluating project proposals at operational levels, and
to allow periodic updates to the transportation master plan as new development
occurs. Completed April 2003. Work by David
Plummer & Associates. Download the
Executive Summary (2003),
Final Report (April 2003), and
Presentation (2001). Contact Larry
Foutz at 305-375-1522 for complete details.
- Miami Gardens Circulator Feasibility Study 2006
- Develop a plan for the establishment of a transit circulator service, in the
City of Miami Gardens, that would
integrate with other transit services in the community. Started August 2006
and completed February 2008. Work by David
Plummer & Associates, The approximate cost was $50,000. Download the
Executive Summary (February 2008),
Final Report (February 2008), and
Presentation (February 2008). Contact
Carlos Roa at 305-375-4507 for complete details.
- Miami River Corridor Multimodal Transportation Plan
2006 - This plan identifies means to increase safety and mobility of freight,
pedestrians, transit, and vehicular traffic in the historic Miami River corridor.
Started April 2006 and completed August 2007. Work by
Kimley-Horn & Associates. The
approximate cost was $100,000. Download the
Final Report (August 2007), and
Appendices (August 2007). Contact
David Henderson at 305-375-1647 for complete details.
- Miami Springs Transit System Service and Opportunity
Study 2004 - Formerly called Miami Springs Mobility Master Plan 2004. This
study was part of the
Municipal Grant Program (MGP) to provide a factual basis for decision-makers
seeking to improve the quality of life in the
City of Miami Springs via improved
local transit. Completed November 2004. Work by
The Corradino Group. Download the
Final Report (November 2004). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Miami Surface Shuttle Services Technical Assistance
2000 - Evaluate the feasibility of implementing shuttle services for the
airport west and downtown Miami areas.
Completed June 2000. Work by Center for Urban
Transportation Research (CUTR). Download the
Report (June 2000). (SkyDrive) Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Miami-Dade County Bicycle and Pedestrian Facility
Maintenance Program 2008 - ONGOING. It's to develop a comprehensive maintenance
program to ensure the longevity and safety of greenway trails within the county.
Started in December 2008. Expected completion was September 2009. Work by
Florida International University. The approximately
cost $80,000. STATUS: 90% complete. (February 2010) Contact
David Henderson at 305-375-1647 for
complete details.
- Miami-Dade County Grade Separation Feasibility Study
2004 - This study was created to assess if the concept of grade separations
and urban interchanges is viable or fatally flawed for implementation on major
city streets along serving the main county travel corridors. These types of
roadway lanes will allow traffic to bypass sign and/or signal-controlled intersections.
The result is reduced congestion by way of continual traffic flow through an
intersection akin to expressway interchanges. Completed May 2005. Work by
Corradino. Download the
Final Report (July 2005). Contact
Jesus Guerra at 305-375-2069 for complete details.
- Miami-Dade County Typical Roadway Section and
Zoned Right-of-Way Update Study 2007 - To update typical streets section
standards through the County with special emphasis on the urban centers and
review countywide zoned right-of-ways widths, and recommend revised zoned R-O-W
for roadways in the county. Completed December 2007. Work by
Kimley-Horn & Associates. The
approximate cost was $110,000. Download the
Workbook (2007). RESULTS: Draft zoned R-O-W ordinance to be sent to BCC
via Department of Planning and Zoning. Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Miami-Dade Freight Plan 2007 - The objective of this
study is to develop a freight master plan that will feed projects into the
Long Range Transportation Plan. Started September 2007 and completed
September 2008. Work by Gannett Fleming.
The approximate cost was $124,929. Download the
Executive Summary (March 2009) and
Final Report (March 2009). Contact
Larry Foutz at 305-375-1522 for complete details.
- Miracle Mile Traffic Circulator Study 1993 - This
study described the methods that were used to develop traffic and parking improvements
plan that would return Miracle Mile (City
of Coral Gables) to a more pedestrian oriented, shopping friendly environment.
Completed in May 1994. Work by David Plummer
& Associates. Download the
Report (May 1994). Contact Irma San Roman
at 305-375-4507 for complete details.
- Mobility Management Process/Congestion Management System
1996 - In compliance with ISTEA,
Miami-Dade County developed a MMP/CMS for defining congested corridors and identifying
strategies for alleviating traffic congestion. Work by
David Plummer & Associates. Please
visit our office to view or receive a copy of this report. Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Model Validation to Cube Voyager 2007 - To review
and validate the Miami-Dade County model, currently under
FSUTMS and supported with TRANSPLAN,
to the new software engine of FSUTMS
called Cube Voyager. Started December 2007 and completed September 2008. Work
by The Corradino Group. The approximate
cost was $55,000. Download the
User's Guide (September 2008). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Modeling Support for Near Term Transportation Improvements
Study 2010 - Develop a 2 to 5 year plan for major public transportation
improvements by researching ways to develop new premium public transportation
services in high volume urban travel corridors working in conjunction with all
transportation agencies in the metropolitan area. This work activity would
allow for technical modeling support to complement the work of a multiagency
Near Term Public Transportation Planning Committee that has been constituted
to reassess existing public transportation services. Started May 2010 and completed
November 2010. Work by Gannett Fleming.
The budget is $104,946. Download the
Report (November 30, 2010). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Near-Term Plan for Improved Transportation Services
Study 2010 - Updating the Miami-Dade transportation service plan for the
next 2 to 5 years, in conjunction with all transportation agencies in the urban
area, based on the results of the 20-year Transportation Plan. Priorities in
the deployment of future urban transportation services include limited transit
funding for future expansion; raising new revenues through better management
of existing capacity in expressways; and, changing conditions in the marketplace
that require more “green” solutions in urban living. The update emphasizes
ways to establish premium public transportation services that are cost feasible
until it becomes possible to reconsider expansion of urban rapid rails. This
study seeks to use communication experts to work along with the multiagency
Short Term Transportation Improvement Plan Committee. Started March 2010 and
completed October 2010. Work by Jacobs Engineering.
The budget is $54,958. Download the
Final (October 2010),
"Get Going" Brochure (December 2010), and
"Get Going" booklet (December 2010). Contact
Larry Foutz at 305-375-1522 for complete
details.
- North Dade Greenways Master Plan 1997 - To provide
an integrated system of connectors for cyclists, joggers, equestrians, and pedestrians
along more than 300 miles of urban corridors. It will also seek to reconstruct
formerly connected landscapes and create new ecological corridors among them.
This landscape reconciliation will provide a variety of recreational experiences
within an ecologically driven area. Completed December 1997. Work by
Florida International University. Download
the
Master Plan (December 1997). Contact
David Henderson at 305-375-1647 for
complete details.
- North Miami Community Transit Circulator Study 2000
- An analysis of the need and feasibility of public community transit services
using minibuses, integrated with existing public and private transit services,
to serve the City of North Miami
and neighboring areas. The provision of coordinated community-level transit
service supports the major recommendation of the
Miami-Dade Transit’s
1995 Northeast Dade Transit Improvement Study. Completed April 2000. Work by
PRL & Associates, and North Meridian,
Inc. Download the
Final Report (April, 2000). Contact
Oscar Camejo at 305-375-1837 for complete
details.
- North Ponce de Leon Boulevard Median Evaluation 2002
- Development of a raised median on Ponce de Leon Blvd. between Alcazar Avenue
and 8th Street in Coral Gables. It
will review the capacities and service levels of the existing street cross sections,
crash-prone locations and pedestrian movements. And evaluate the
City of Coral Gables' transit circulator.
Work by David Plummer & Associates. Download
the
Executive Summary (November 2002) and
Final Report (November 2002). Contact
Irma San Roman at 305-375-4507 for complete details.
- Northeast Corridor Traffic Flow Implementation Plan
Study 2008 - This study will implement the improvements specified by the
Northeast Miami-Dade Traffic Flow Study 2006. Contact
Larry Foutz at 305-375-1522 for complete
details. Started December 2008 and completed January 2010. Work by
Kimley-Horn & Associates. The
approximate cost is $75,000. Download the
Executive Summary (January 2010) and
Final Report (January 2010).
- Northeast Miami-Dade Traffic Flow Study 2006 -
Improve traffic flow along the Miami-Dade northeast corridor. It will define
improvements that would accommodate future growth, protect and enhance mobility
and economic prosperity and quality of life within the study area. It will also
help municipalities identify areas of congestion and provide options to relieve
for the same. Started July 2006 and completed September 2007. Work by the
City of North Miami Beach.
The approximate cost was $67,200. Download the
Executive Summary, Task 1 and 2 reports, Task 3 report, Task 4 and 5 reports,
and Appendix A and B (September 2007). Contact
Larry Foutz at 305-375-1522 for complete
details.
- NW 7th Avenue Traffic and Pedestrians Study 2009
- This study is looking at the traffic impacts of the new Immigration Facility
on its immediate vicinity, long range traffic needs to handle the growth in
traffic in the corridor. The study also makes recommendations for improving
pedestrian amenities along the corridor. Started May 2009 and completed May
2010. Work by The Corradino Group. The
budgeted cost is approximately $90,000. Download the
Final Report (May 2010). Contact Larry
Foutz at 305-375-1522 for complete details.
- NW/NE 36th Street Study 2006 - Evaluate traffic
flow conditions along 36th Street and adjacent areas. Started August 2006 and
completed June 2007. Work by Kimley-Horn
& Associates. The approximate cost was $80,000. Download the
Executive Summary (June 2007) and
Final Report (June 2007). Contact
Larry Foutz at 305-375-1522 for complete details.
- On the Waterfront: Implementation Plan to Finish
15 Mile 2011 - ONGOING. Use ground and aerial pictures to depict the existing
conditions, ownership and potential for promenade development of every parcel
on the route of the Miami River Greenway and Baywalk from the Rickenbacker Causeway
to NW 36th Street. Started January 2011. Expected completion was September 2011.
Work by University of Miami. The approximate
cost is $25,000. STATUS: 90% complete. (September 2011) Contact
David Henderson at 305-375-1647 for
complete details.
- Opa-Locka Circulator/Transit Improvement Feasibility
Study 2008 - Also known as the City of Opa-Locka Transit Circulator System
Study. Develop a transit system within the limits of the
City of Opa-Locka. Alternatives should
be developed considering different modes. Started November 2008 and completed
March 2010. Work by the City of Opa-Locka
through Kimley-Horn & Associates.
The approximate cost is $70,000. Download the
Final Report (March 2010) and
Presentation (May 10, 2010). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Origin Destination Study for the 95 Express 2010
- ONGOING. This study will survey the riders the
95 Express and
South Dade Busway
express bus routes to determine how they are arriving and how far they are actually
traveling to reach the express bus stop. Miami Dade County is planning an expansion
of express bus service and needed information about the willingness of commuters
to drive beyond a certain distance to access a park and ride facility and switch
modes. This data collection effort will include operational data from the
95 Express by
FDOT to be reporting to
FTA. Started March 2011 and scheduled
for a January 2012 completion. Work by
HTNB. The budget is approximately
$90,000. STATUS: 80% complete. (September 2011) Contact
Larry Foutz at 305-375-1522 for complete
details.
- Palmetto Bay Transportation Master Plan Study 2004
- Palmetto Bay has adopted a master
planning strategy to identify its existing and future transportation system
deficiencies. It is expected that thousands of homes will be developed to the
south of the city in the coming years. Started February 2004 and completed in
2004. Work by The Corradino Group (under
contract with the Village of Palmetto
Bay). Download the
Executive Summary (2004),
Final Report (2004), and its
Appendix B: Stakeholders List (Traffic Data Collection & Analysis) 2004.
Contact Larry Foutz at 305-375-1522
for complete details.
- Palmetto Corridor Light Rail Transit Feasibility Study
1996 - Evaluating the feasibility of implementing a light rail transit project
along the Palmetto Expressway (SR 826). Two alternatives were considered: A)
Dadeland
North Metrorail Station to SR 836 and then to the proposed MIC and; B)
Dadeland
North Metrorail Station to
Okeechobee Metrorail
Station along the Palmetto Expressway. Alternative "A" was included for
consideration in the
LRTP. Completed in January 1997. Work by
Gannett Fleming. Download the
Final Report (January 1997). (SkyDrive) Contact
Carlos Roa at 305-375-4507 for complete
details.
- Pedestrian Safety Around High Risk Schools Study 2010
- Prepare school –based Safe Routes to School plans and funding applications
for schools identified as priorities for child safety and mobility. Started
May 2011 and completed February 2012. Work by
Kimley-Horn & Associates.
The budget is approximately $100,000. Download the
Report . Contact David Henderson
at 305-375-1647 for complete details.
- Pedestrian/Bicycle Safety Study 2007 - ONGOING. This
study will document existing traffic operations conditions and alternative modes
of transportation (bus transit, pedestrian ways, bicycle connections, etc.)
at NE 163rd Street and Biscayne Boulevard; and develop feasible alternatives.
Started October 2007. Expected completion was September 2008 Work by the
City of North Miami Beach.
The projected cost is approximately $20,000. STATUS: Study in progress. (April
2010) Contact David Henderson at 305-375-1647
for complete details.
- Port of Miami City Street Improvements 2000 - Also
known as Seaport Truck Study. This study evaluated existing truck traffic movement
in and out of the seaport and recommend alternatives to improve mobility within
the downtown area. Completed September 2000. Work by
Beiswenger Hoch & Associates. Download
the
Final Report (September 2009). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Port of Miami Freight Access Study 2006 - Evaluate
a variety of intermodal alternatives for improving freight access to and from
the Port of Miami. Studied
from April 2006 to February 2007. Work by Cambridge
Systematics. Download the
Draft Executive Summary (January 2007) and
Final Report (February 2007). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Post Hurricane Short Range Transportation Study 1995
- It was created to define the existing transportation conditions in the West
Miami-Dade Area. Recommendations were made to maintain acceptable levels of
service on roadways that improve mobility options in the area. Improvements
include short and long term projects. Please
visit our office to view or receive a copy of this report. Contact
Carlos Roa at 305-375-4507 for complete
details.
- Public Involvement Effectiveness Evaluation Program
2001 - The purpose of this study was to establish an evaluation program
that can measure the effectiveness of the Miami-Dade MPO Public Involvement
Program. The MPO Board approved and incorporated the program as part of the
Miami-Dade Prospectus for Transportation. Innovative strategies were included
as part of the plan that was fully endorsed by the
Federal Highway Administration (FHWA).
Work by Gannett Fleming. Download
the
Report (November 2001). Contact Elizabeth
Rockwell at 305-375-1881 for complete details.
- Rail Convertibility Study 2003 - Also called Rails
to Trails; or Converting Rails to Transit, Bike & Pedestrian Facilities Study.
This study will provide a comprehensive assessment of abandoned and underutilized
rail right-of-way for potential public transportation uses. Previous related
work can be found in the Railroad Rights-of-Way Assessment
Study (1993). Started October 2003 and completed September 2004. Work by
The Corradino Group. Download the
Final Report (November 2004). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Railroad Rights-Of-Way Assessment Study 1993 -
This study would create an inventory of all railroads in Miami-Dade County;
examine for potential use in public transportation; and develop recommendations
for particular corridors to be studied in detail. Completed August 1993. Work
by ICF Kaiser Engineers. Download the
Report (August 1993). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for complete
details.
- Regional Freight Plan 2008 - This study will analyze
existing and new data and, in conjunction with the regional visioning process,
develop a regional freight strategy and make implementation recommendations.
Started May 2008 and completed December 2009. Work by
Kimley-Horn & Associates (via
FDOT). The approximate cost is $33,000
(the MPO's share of a tri-regional effort totaling $198,791). Download the
Report (March 2010). Contact Larry
Foutz at 305-375-1522 for complete details.
- Regional Long Range Transportation Plan 2007 - This
plan provides a prioritized set of highway and transit improvements for Miami-Dade,
Broward, and Palm Beach counties, recognizing the regional characteristics of
many travel needs. Started December 2007. Expected completion is now May 2010.
Work by Kittelson and Associates. The
total estimated cost is approximately $450,000 (Miami-Dade's share is $150,000
with remaining amount being provided in equal parts by the Broward and Palm
Beach MPOs). STATUS: Awaiting final report. (December 2010) Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Safe Routes to Parks Study 2009 - Also known as the
Pedestrian Safety at Miami-Dade Regional Parks Study. Improve pedestrian safety
around parks to help create more "walkable" communities and reduce traffic congestion
by developing pedestrian safety plans for the following county parks:
Tropical,
Partners
for Youth,
Francisco Human Rights,
Little River,
Country Village,
and Goulds.
As well as countermeasures that can be used to guide pedestrian safety improvements
at additional county parks. Started in May 2009 and completed July 2010. Work
by David Plummer & Associates. The cost
is $56,496. Download the
Final Report (March 2010). Contact
David Henderson at 305-375-1647 for complete details.
- Safe Routes to School Online Map System Pilot Program
2009 - ONGOING. Also known as the Online Safe Routes to School Pilot Program.
To develop an online program for selected public elementary schools. The system
will allow a user to select an individualized walking route between a student’s
home and his/her school based on infrastructure and traffic factors including,
but not limited to, existing sidewalks, crosswalks, school speed zones, traffic
signals, and speed limits. In addition to a printable walking route map and
written directions, students and parents will be able to get pedestrian safety
information from the WalkSafe program developed by the
University of Miami’s
Miller School of Medicine. Started April
2010. Scheduled completion was April 2011. Work by
Florida International University, College
of Engineering and Computing. The cost is $75,000. STATUS: Awaiting final
report. (September 2011) Contact David
Henderson at 305-375-1647 for complete details.
- Safe Routes to School Program Study 2003 - To identify
and propose corrective measures on existing student pedestrian safety hazards
along designated Safe Routes to School in selected high student pedestrian crash
areas. An existing Safe Routes to School Program is in place, but has not been
updated for several years. Started April 2003 and completed September 2006.
Work by Reynolds, Smith & Hills, Inc.
Download the
Executive Summary (September 2005),
Presentation (September 2005), and
Technical Memorandum No. 3 (September 2005). Contact
David Henderson at 305-375-1647 for
complete details.
- Safe Routes to School Program Study 2006 - This
would prepare “safe routes to school” plans for elementary schools that identify
a safe route and infrastructure improvements within the attendance boundary.
Completed July 2007. Work by Reynolds, Smith
& Hills, Inc. The approximate cost was $60,000. Download the
District-wide Traffic Operations Studies No. 25 and
District-wide Traffic Operations Studies No. 26. RESULTS: $2.2 million programmed
for design and construction of 15 Liberty City-area elementary schools in the
current year (FM #4208811). Contact David
Henderson at 305-375-1647 for complete details.
- Safe Routes to School Program Study 2007 - This
would prepare “safe routes to school” plans for elementary schools that identify
a safe route and infrastructure improvements within the attendance boundary.
Contact David Henderson at 305-375-1647
for complete details. Started in October 2007 and completed in July 2008. Work
by The Corradino Group. The approximate
cost was $55,000. Download the
Report (2008). RESULTS: Safe Routes to
School Program to run annually when funds are available. Contact
David Henderson at 305-375-1647 for
complete details.
- Senior High School Student Safety Campaign 2008
- ONGOING. This study will develop a student pedestrian and vehicular safety
campaign program targeting senior high school students. Started November 2008.
Expected completion was June 2009. Work by
Miami-Dade County Public Schools.
The approximate cost is $25,000. Download the
Teen Driver Safety Week Poster (October 2009). STATUS: 90% complete. Contact
David Henderson at 305-375-1647 for
complete details.
- School Zone Traffic Congestion Study 2002 - Study
the alternatives for transportation operations and design for improved access
and area traffic flow surrounding public schools. Completed in July 2002. Work
by David Plummer & Associates. Download
the
Executive Summary (July 2002),
Final Report (July 2002), and
Presentation (July 2002). Contact
Larry Foutz at 305-375-1522 for complete details.
- Service Enhancements to the Hialeah Transit System 2007
- Also known as the Hialeah Transit System Express Bus Route and Enhanced Service.
This study examines potential HTS express transit service by examining the existing
service with the intention of providing services on less congested roads on
the periphery of the city and linking key attractions and destinations. Started
January 2007 and completed March 2008. Work by the
City of Hialeah. The approximate cost
is $20,000, part of the
Municipal Grant Program. Download the
Draft Final Report (March 2008). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Short Range Truck Traffic Study for the Airport West
Area 2002 - Develop a set of standards and an implementation plan to better
accommodate truck traffic and commercial truckers needs in the Airport West
area. Completed in July 2002. Work by David
Plummer & Associates. Download the
Executive Summary (2002),
Final Report (2002), and
Presentation (July 2002). Contact
Larry Foutz at 305-375-1522 for complete details.
- Signage Program for the Miami Health District 2011
- Provide a comprehensive implementation plan that would identify exact
locations for new signage with descriptive, specific wording for each sign
throughout the district. Completed in March 2013. Work by
Marlin Engineering. Download the
Signage Program for the Miami Health District, Final, 3/2013. Contact
Jesus Guerra
at 305.375.2069 for complete details.
- Simulation and Analysis of Potential Mass Evacuation
of Miami-Dade Residents 2006 - Requested by
CTAC in response to the mass evacuation that followed Hurricane Katrina's
impact on New Orleans and Hurricane Rita's impact on Houston. Completed June
2007. Work by Gannett Fleming and
Advanced Transportation Engineering Consultants.
Download the
Final Report (June 2007). Contact Oscar
Camejo at 305-375-1837 for complete details.
- Snake Creek Bike Trail Planning and Feasibility Study
2004 - Formerly Snake Creek Canal Bikeway Planning and Feasibility Study.
This study will plan for two segments of a non-motorized trail within the Snake
Creek canal right-of-way. A portion contains the Snake Creek Bike Path and will
look at expanding the bike path to connect similar facilities in
North Miami Beach and the proposed
Florida Turnpike greenway. Started
August 2004 and completed June 2005. Work by
Kimley-Horn & Associates. Download
the
Final Report (2005). RESULTS: $3.7 million programmed for design and construction
in fiscal years 2010-2012 (FM #2512003). Contact
David Henderson at 305-375-1647 for
complete details.
- Snapper Creek Park & Ride Feasibility Study 1998
- To assess the feasibility of implementing a park and ride facility at the
Snapper Creek Service Plaza on Florida's
Turnpike. The feasibility considerations include the demand for the facility,
and accessibility and operational impacts on the
Turnpike and the Service Plaza.
Started in 1998 and completed January 1999. Download the
Final Report (January 1999). (SkyDrive) Contact
FDOT at 1.800.435.2368 for complete
details.
- Snapper Creek Trail Segment A Planning Study 2007
- This study will help establish ways to bring the existing trail up to current
standards for amenities and crossings safety, improve access, and determine
best side of canal for new trail portions where needed. Started July 2007 and
completed March 2009. Work by Kimley-Horn
& Associates. The approximate cost was $55,000. Download the
Executive Summary (October 2008) and
Final Report (October 2008). Contact
David Henderson at 305-375-1647 for
complete details.
- Sociocultural Effects Program 2003 - Formerly Community
Impact Assessment Program. Studied from July 2003 to April 2005 (in two phases)
by FIU Metropolitan Center;
FIU GIS RS Center; and Urbana Research
and Consulting, Inc. Connected to the Community Characteristics Project (CCP).
The CCP is a tool which enables the Public Involvement Office (PIO) to review
the social, economic, and geographic characteristics of an area before public
involvement (PI) outreach is initiated. Phase I is a rudimentary web-based program
utilizing ArcExplorer
(shareware); while Phase II is program customized with added functionalities
for a customer friendly environment. Contact
Elizabeth Rockwell at 305-375-1881
for complete details.
- South Beach Bicycle and Pedestrian Study 1994 -
Work by Barton-Aschman Associates. Undertaken as part of the MPO’s assistance
to the South Beach Transportation Management Association. The traditional grid
roadway system, high percentage of recreational trips, parking demand, short
trip distances, extensive transit services and low income employment are ideal
for promoting programs to encourage cycling and walking. Download the
Report (January 1995). (SkyDrive) Contact
David Henderson at 305-375-1647 for
complete details.
- South Dade Greenway Network Master Plan 1994 -
Out of the chaos of Hurricane Andrew, a community desire emerged to create a
comprehensive system of multi-purpose trails in South Dade County that would
provide scenic, recreational and utilitarian corridors to be enjoyed by both
residents and visitors. Contact David
Henderson at 305-375-1647 for complete details. Completed in 1994. Work
by The Redland Conservancy. Download the
Final Report (November 1994). (SkyDrive)
- South Dade Managed Lanes 2007 - The objective of
this study is to identify reasonable alternatives for developing of managed
lanes in the right-of-way of the South Dade Busway and to evaluate the revenue
generating potential. Started July 2007 and completed September 2008. Work by
Kimley-Horn & Associates. The
approximate cost was $80,000. Download the
Executive Summary (September 2008),
Final Report (September 2008), and
Presentation (November 2008). Contact
Larry Foutz at 305-375-1522 for complete
details.
- South Florida Clean Energy and Greenhouse Gas Emission
Reduction Program 2009 - ONGOING. It will accelerate the growth and development
of alternative fuel fleets, fuel suppliers and awareness in the four county
regions. Started April 2009. Expected completion in March 2010. Work by the
South Florida Regional Planning Council
(SFRPC). The approximate cost is $50,000. STATUS: 80% complete. Contact
Susan Schreiber at 305-375-1887 for
complete details.
- South Link (South Miami-Dade Transit Corridor Study
2004) - An alternative analysis to develop transportation improvements for the
corridor that stretches from the Dadeland South Metrorail Station to Florida
City. The focus was on those projects already funded and under construction,
in order to keep pace with the rapid population growth and forecasted travel
needs for the South Miami-Dade area. Completed January 2006. Work by
The Corradino Group. Download the
South Link documents. Contact Wilson
Fernandez at 305-375-1886 for complete details.
- Special Use Lane Study 2004 - Also called Reversible
Lanes. This study makes a quick examination of freeway facilities and major
arterials that have the potential to accommodate special use lanes, which could
be reversible or could be used by regular traffic, high-occupancy vehicles (HOV),
bus rapid transit, or some mixture of the three. Completed in 2004. Work by
The Corradino Group and
PMG Associates, Inc. Download the
Brochure (2004) and
Executive Summary (2004). Contact
Jesus Guerra at 305-375-2069 for complete details.
- Special Use Lanes Study: Transit Use of Shoulder
By-Pass Lanes 2005 - This study evaluates the condition of the shoulders
along the expressway system for allowing transit buses to use it as a by-pass
lane for traffic congestion. Segments were identified, as appropriate and an
action plan was developed. A pilot project will be implemented in phases. Completed
in November 2005. Work by The Corradino
Group. Download the
Final Report (November 2005). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- SR-826 and Biscayne Boulevard Pedestrian & Bicycle
Safety Study 2007 - Also known as the City of North Miami Beach Pedestrian/Bicycle
Safety Study and the North Miami Beach US-1/NE 163rd Street Intersection Study.
The purpose was to investigate and document existing traffic operations conditions,
alternative modes of transportation; i.e., bus transit, pedestrian ways, bicycle
connections, etc, and develop alternative solutions that are economically and
environmentally feasible. Started October 2007 and completed May 2008. Work
by URS Corporation, in conjunction with
the City of North Miami Beach.
The cost is part of the
Municipal Grant Program. Download the
Report (March 2008). Contact David
Henderson at 305-375-1647 for complete details.
- Strategies for Integration of Sustainability and the
Transportation System 2010 - Identify and evaluate several strategies to
improve the sustainability of the county’s transportation system with an emphasis
on accommodating future travel needs using primarily transportation demand management
strategies. A scenario system planning approach will be employed to assess
the effectiveness of various strategies for Miami-Dade County that have been
planned or implemented elsewhere. Started December 2010 and completed November
2011. Work by Jacobs Engineering. The budget
is approximately $112,488. Download the
Final Report - Executive Summary (December 2011). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Superarterial Network Study 1996 - This study identifies
corridors and improvements for developing a superarterial network to alleviate
existing traffic congestion along the expressway system. Completed October 1998.
Work by Parsons, Brinckerhoff, Quade & Douglas,
Inc. Download the
Final Report (October 1998). (SkyDrive) Contact
Larry Foutz at 305-375-1522 for complete
details.
- SW 152nd Street Corridor Transportation Study 2007
- Identify alternatives for improving traffic flow along SW 152nd Street, from
US-1 to 162nd Avenue. Started March 2007 and completed July 2008. Work
by Gannett Fleming. The approximate
cost was $80,000. Download the
Executive Summary Report (July 2008) and
Final Report (July 2008). Contact
Jesus Guerra at 305-375-2069 for complete details.
- Town of Cutler Bay Transportation Master Plan 2008
- Study the existing and future conditions of the transportation system within
the Town of Cutler Bay. Started
September 2008 and completed April 2009. Work by
The Corradino Group for the
Town of Cutler Bay. The approximate
cost is $100,000. Download the
Final Report, July 2009. Contact Wilson
Fernandez at 305-375-1886 for complete details.
- Town of Medley NW 116th Way Corridor Study 2009
- As part of the
Municipal Grant Program, the Town
of Medley will have detailed traffic study performed for the major intersections
along the corridor and will identify improvements. Started December 2009 and
completed July 2010. Work by the Town
of Medley and Calvin, Giordano
& Associates. The budgeted cost is $31,335. Download the
Appendix, June 2010. Contact Larry
Foutz at 305-375-1522 for complete details.
- Town of Medley NW South River Drive Corridor Study
2003 - Also called South River Drive Corridor. This study was to provide
the Town of Medley and the Miami-Dade
MPO with information on the existing conditions along NW South River Drive,
between NW 107th Avenue and the Palmetto Expressway, and the need for improvements.
Completed December 2003. Work by Corzo Castella
Carballo Thompson Salman, P.A. Download the
Volume 1 Engineering Analysis (December 2003). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Town of Medley NW South River Drive Corridor Area
Expansion Study 2005 - Also called Medley, Phase II or South River Drive
Corridor II. This was created to investigate transportation characteristics
and deficiencies associated with the
Town of Medley's westernmost industrial area and its interaction with SR-25.
Completed November 2005. Work by Corzo Castella
Carballo Thompson Salman, P.A. Download the
Volume 1: Engineering Analysis (November 2005) and
Volume 2: Traffic Report (November 2005). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Town of Medley Transit Circulator Services Implementation
Study 2005 - It provided the Town
of Medley and the MPO with a comprehensive evaluation of existing public
transportation system deficiencies; determine existing and potential transit
needs; recommend a transit circulator system and strategy; and, a preliminary
cost estimate and potential funding sources. Started August 2005 and completed
September 2006. Work by BCC Engineering
and Westhorp & Associates. Download the
Executive Summary (2006) and
Full Report (2006). Contact Jesus
Guerra at 305-375-2069 for complete details.
- Town of Miami Lakes Transportation Master Plan 2004
- This was to develop a plan for the Town
of Miami Lakes to accommodate local mobility needs. Completed in February
2004. Work by Kimley-Horn & Associates.
Download the
Final Report (February 2004). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Traffic Calming for Pedestrians at Miami-Dade Community
College Wolfson Campus Study 2003 - Pedestrian-oriented traffic calming
and mitigation study of the area adjacent to and surrounding the downtown Wolfson
campus of Miami-Dade College including mitigating
car and truck traffic impacts accessing the
Port of Miami and downtown
Miami. Started November 2003 and completed
June 2004. Work by HDR, Inc. Download the
Executive Summary (September 2004),
Presentation (2004), and
Technical Memorandum 3: Final Report (September 2004). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Traffic Safety Plan for Elderly Pedestrians in Miami-Dade
County 2010 - Formerly called Miami-Dade Most Dangerous Locations for Elderly
Pedestrians. To investigate the safety of elderly pedestrians at road segments
and intersections. A two-fold approach is proposed: 1) identify the most dangerous
locations using crash, Annual Average Daily Traffic (AADT), and related data
from Miami-Dade Public Works;
and 2) provide engineering or intervention (e.g., education) countermeasures
towards improving the safety of elderly pedestrians. Started March 2010 and
completed October 2010. Work by
Miami-Dade Public Works and Florida International
University. The budgeted cost is approximately $67,000. (FIU
will provide $50,000 through Public
Works.) Download the
Report (March 2011). Contact David
Henderson at 305-375-1647 for complete details.
- Traffic Signs Research Study for Miami-Dade County
2006 - Evaluate a set of feasible alternatives for improving withstanding
capabilities, in the event of a hurricane, of the street signs without making
the installation process more difficult. Completed in 2007. Work by the
Center for Urban Transportation Research
and the University of South Florida. Download
the
Final Report (May 2007)
and
Presentation (June 11, 2007). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Transit Center Connections Study 2003 - Also called
Connecting Traffic Generators Study 2003. This study identifies opportunities
for improved intermodal connections and develop a tool for easy access to information
regarding opportunities for such connections. The intermodal connections or
“Transit Centers” are defined as transportation transfer points, providing access
to transportation services, multiple services or modes. Studied from August
2003 to August 2004. Work by Cambridge Systematics.
Download the
Brochure (2004) and
Final Report (December 2004). Contact
Carlos Roa at 305-375-4507 for complete details.
- Transit Contraflow Feasibility Study 2002 - Evaluate
the feasibility of a bus transit contra flow facility in Miami-Dade County,
and select and recommend a specific highway or highway corridor for further
study and implementation. Completed in 2002. Work by
Kimley-Horn & Associates. Download
the
Executive Summary (June 2002) and
Final Report (June 2002). Contact Jesus
Guerra at 305-375-2069 for complete details.
- Transit Corridors Transitional Study 1994 - This
study compared the costs, revenues, ridership, and benefits between the Northeast,
North, West, Kendall, Homestead,
and Miami Beach transit corridors.
No priorities were derived from the study. Please
visit our office to view or receive a copy of this report. Contact
Larry Foutz at 305-375-1522 for complete
details.
- Transit Hub Evaluation Study 2008 - Develop a comprehensive
transit hub system plan that will best serve transit patrons and ease of travel.
Started April 2008 and completed May 2009. Work by
The Corradino Group. The approximate
cost was $60,000. Download the
Final Report (May 2009). Contact Wilson
Fernandez at 305-375-1886 for complete details.
- Transit On-Board Survey 2008 - The objective of this
study was to develop a data collection program that meets FTA guidelines to
support transit modeling efforts. Started October 2008 and completed July 2009.
The approximate cost is $150,000. Download the
Final Report (July 2009). Contact
Larry Foutz at 305-375-1522 for complete details.
- Transit Oriented Development Master Plans for Exclusive
Busway Corridors Study 2003 - To complete master plans and implementing
regulations for two planned Community Urban Centers (CUCs) designated in the
Miami-Dade’s Adopted 2005-2015 Land Use Plan along the programmed Exclusive
Busway Extension located along US1 at the intersections of SW 216th (Goulds)
and 248th (Princeton) streets. The aforementioned will implement the county’s
Comprehensive Development Master Plan (CDMP) provisions governing planned CUC
and the CDMP Guidelines for Urban Form which seek to promote pedestrian-friendly,
mixed-use and transit-supportive development in connection with the Busway.
Completed November 2003. Work by
Miami-Dade Planning & Zoning.
Download the Download the
Goulds Community Urban Center Citizens’ Master Plan Final Report (July 23, 2003),
Goulds Community Urban Center Zoning District Ordinance (2007),
Princeton Charrette Report (January 2004), and
Princeton Community Urban Center Zoning District Ordinance (2007). Contact
Susan Schreiber at 305-375-1887 for
complete details.
- Transit Service Evaluation Study 2009 - Formerly
called Evaluation of Miami-Dade Transit's Trunk and Feeder Bus System Study.
The objectives of this study are to evaluate service changes implemented by
Miami-Dade Transit (MDT) in December
2009 and to develop an continuous monitoring program. As well as to develop
standards for the installation, relocation and elimination of bus stops, benches
and shelters. Started June 2010. Completed October 2011. Work by
Gannett Fleming. The budgeted cost
is approximately $124,634. Download the
Executive Summary (October 2011),
Final Report (October 2011), and
Appendices (October 2011). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Transportation and Economic Impact Analysis for Freight
Industry 2010 - Also known as the Transportation and Economic Impacts of
the Freight Industry in Miami-Dade County. Examines the impacts of the freight
industry in Miami-Dade County by track the amount and nature of goods moving
from the source to market; the amount of warehousing real estate; and, the number
of jobs at the airport, seaport, in warehousing, rock mining, rail transport,
and trucking. The secondary impacts (vehicle sales, real estate, fuel, material,
permits, licenses, maintenance, and taxes) will also be analyzed. Economic multipliers
are then applied to all the aforementioned impacts to determine the full impact
on the economy of South Florida including potential impacts of future Post-Panamax
shipping at the Port of Miami.
Started August 2010. Expected completion was July 2011. Work by
Marlin Engineering. The budget
is $120,000. Download the
Final Report (December 2011),
Executive Summary (December 2011), and
Presentation (December 7, 2011). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Transportation Data Management System (TDMS) 2001
- Implement a flexible, expandable, computer-based electronic MPO-resident relational
database to hold and husband transportation and transportation-related data
that will allow statistical, temporal, and geographic analyses, and be capable
of report, tabular, graph, and map presentation of information. Contact
Jesus Guerra at 305-375-2069 for
complete details. Completed March 2002. Work by
David Plummer & Associates, and
International Development Analysis Services.
Download the
Executive Summary (March 2002) and
Final Report (March 2002).
- Transportation Demands of the 21st Century 2007
- Formerly called Transportation Innovations in the 21st Century. This study
will develop a menu of innovative cutting edge strategies for enhancing the
county's transportation system in order to meet current and future transportation
needs using strategies that employ state-of the art concepts in the areas of
land use, safety, technology and environmental protection. The November 2007
completion not reached due to a scope revision. Started May 2007 and completed
January 2009. Work by the Center for Urban
Transportation Research (CUTR). The expected cost is approximately $56,560.
Download the
Executive Summary (January 2010) and
Final Report (January 2010). Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Transportation Financial Analyses and Assessments Study
1997 - This study addresses the process in Miami-Dade County that leads
to fundamental decisions about which transportation projects are implemented,
the manner and sequential order in which they are implemented and the structuring
of funding and financing of these projects. Work by
KPMG. Download the
Executive Summary (July 1997). (SkyDrive) Contact
Carlos Roa at 305-375-4507 for complete
details.
- Transportation System Hurricane Emergency Preparedness
Plan 1995 - A review of the transportation system during hurricane conditions.
The results included a full inventory of the county's traffic signals and projected
pre-storm evacuation roadway clearance times, among other things. Download the
Plan (1995). (SkyDrive) Contact Larry
Foutz at 305-375-1522 for complete details.
- Transportation System Performance Monitoring 2007
- This study would identify a series of performance measures that can be collected
on an annual basis to have a method of tracking changes in the quality and level
of service on the transportation system. Started September 2007 and completed
February 2009. Work by Gannett Fleming.
The approximate cost was $59,912. Download the
Report (November 2008) and
State of the County (November 2008). Contact
Larry Foutz at 305-375-1522 for complete
details.
- Trends in Heavy Truck Traffic Management Study 2003
- This study will research current trends in the management of such heavy truck
traffic in major metropolitan areas to see what approaches work best to reduce
motorists’ concerns while maintaining the flow of goods and services. Two freight
and trucking-oriented studies have been previously conducted. The main focus
was not on specifics of heavy truck operations on expressways and major arterials.
Started June 2003 and completed October 2004. Work by
Cambridge Systematics. Download the
Executive Summary (2005),
Final Report (2005), and
Presentation (2005). Contact Larry
Foutz at 305-375-1522 for complete details.
- Truck Route System for Miami-Dade County 2006 -
It's task was to identify current and future corridors for heavy truck traffic
and to preserve roadways for such vehicles by designating them as truck routes.
Started August 2006 and completed June 2007. Work by
The Corradino Group. The approximate
cost was $53,000. Download the
Executive Summary (June 2007) and
Final Report (June 2007). Contact
Larry Foutz at 305-375-1522 for complete details.
- Update of the Miami-Dade County GIS Crash Data
System 2009 - The purpose of this project was to update and maintain the
Crash Data System for Miami-Dade
County Traffic Engineering and MPO. The Miami-Dade crash data system is
developed and hosted at the University of Florida.
The system allows users to identify and map high crash locations in all the
county roads based on number of crashes and injury severity. In addition, the
system provides crash intersection diagrams, tables, charts and summarized reports
as well as access to individual crash reports. The system is accessed via internet
through a web browser. Miami-Dade
County Traffic Engineering manages the access privileges for the users of
the system. During the 2009-2010 contract University
of Florida obtained, processed, mapped and loaded the long form crashes
for year 2009. This included automobile, bicycle and pedestrian crashes. The
raw crash data was obtained from Florida Department
of Highway Safety and Motor Vehicles (DHSMV). The data was converted in
a suitable database format and was mapped to the Miami-Dade streets. Additionally,
new software features were added to the system. They include ability to produce
reports with an expanded list of attributes for bicycle and pedestrian crashes
and the ability to export the full set of crash attributes.
University of Florida provided on-site training
for the Traffic Engineering
and MPO users. The current crash database includes long form crashes in
all Miami-Dade roads for years 2005 through 2009. The crash data system
is functional and available for Miami-Dade County users. The budgeted cost is
approximately $50,000. (UF will provide $35,640
through Miami-Dade Public Works).
Download the
Presentation (March 8, 2009). RESULTS:
Miami-Dade Geographical Information
Systems (GIS) crash data system was updated. No final report necessary.
Contact Carlos Roa at 305-375-4507 for
complete details.
- US-1 Intersection Improvements Study 2007 - This
study investigates the operational and safety needs and improvement alternatives
for 12 intersections along US 1, between SW 72nd Avenue and SW 136th Street,
on the eastern boundary of the Village
of Pinecrest. Completion is tentative on study presentation to committee.
Started September 2007 and completed April 2008. Work by the
Village of Pinecrest and
Florida International University. The approximate
cost was $30,000. Download the
Report (April 2008) and
Presentation (May 10, 2008). Contact
Oscar Camejo at 305-375-1837 for complete details.
- US-1 Reversible Flow Lane Study 2006 - Study the
feasibility of developing a master plan for the addition of two reversible lanes
along US 1 between I-95 and Bird Road. Started August 2006 and completed December
2007. Work by The Corradino Group. The
approximate cost was $55,000. Download the
Executive Summary (October 2007),
Final Report (December 2007) and
Presentation (January 7, 2007). Contact
Larry Foutz at 305-375-1522 for complete
details.
- US-1/SR-878 Intersection Sub-Area Traffic Study
2009 - Develop several conceptual improvement strategies to alleviate traffic
congestion along US-1 in the vicinity of State Road 878. Started May 2009 and
completed December 2009. Work by David Plummer
& Associates. The budgeted cost is approximately $62,000. Download the
Final Report (March 2010) and
Presentation (September 2, 2009). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
- Vanpool Demonstration Program 1996 - Provide vans
to individuals traveling together on a regular basis to work, as well as institutions,
businesses, agencies and other organizations. This program is a result of the
Congestion Mitigation: Public-Private Partnerships Study conducted for the MPO
in March 1994. Completed in January 1997. Work by
Vanpool Services Incorporated.
Please
visit our office to view or receive a copy of this report. Contact
Jesus Guerra at 305-375-2069 for
complete details.
- Village of Palmetto Bay Bicycle and Pedestrian Master
Plan 2008 - It's objective is to create a vision of non-motorized transportation
within Palmetto Bay boundaries.
Started November 2008 and completed June 2009. Work by the
Village of Palmetto Bay. The approximate
cost was $50,000. Download the
Master Plan (August 2009). Contact
David Henderson at 305-375-1647 for complete details.
- Village of Palmetto Bay Safe Routes to School Program
Study 2009 - ONGOING. To prepare a Safe Routes to School plan for four schools
within the Village of Palmetto Bay
that have identified the need for a Safe Route within the school attendance
boundary. This will include infrastructure improvements along the route, as
well as cost estimates. The second phase is to prepare a FDOT Safe Routes to
School Infrastructure Funding Application for each school, for particular items
that are not within Village jurisdiction. The desired outcomes include increased
bicycle, pedestrian, and traffic safety; decreased traffic congestion and improved
childhood health. Started February 2010. Scheduled completion was July 2010.
Work by the Village of Palmetto Bay.
The budgeted cost is approximately $38,742. STATUS: 95% completed. (December
2010) Contact David Henderson at 305-375-1647
for complete details.
- Village of Pinecrest Safe Routes to School Study 2010
- PENDING. Prepare Safe Routes to School plans for Pinecrest Elementary, and
Palmetto Elementary, Middle and Senior High School. Scheduled to start January
2011 and completed August 2011. Work by the
Village of Pinecrest. The budgeted
cost is approximately $40,000. STATUS: Scheduled to start. (December 2010) Contact
David Henderson at 305-375-1647 for
complete details.
- Web-based Bicycle Route Planning Tool 2010 - Develop
an online system that prepares a suggested bicycle route along streets and other
bike facilities which connects start and end points selected by the user. Because
it will create routes that meet a users preferences the system will remove a
significant information barrier to practical bicycle use. The project will be
completed by the University of Florida’s
Geomatics Program. This study
will be consistent with a similar system developed for the
Broward County MPO and have linked
inter-county origins and destinations. Started February 2010 and completed September
2010. Work by the University of Florida. The
approximate cost was $50,000. Download the
Final Report (September 2010). Contact
David Henderson at 305-375-1647 for
complete details.
- Welfare to Work: Transportation Issues and Opportunities
in Miami-Dade County 1998 - The main purpose of this study was to compile
basic information concerning welfare recipients in Miami-Dade County who were
eligible for the Work and Gain Economic Self-Sufficiency (WAGES) Program. Completed
in December 1998. Work by FIU Metropolitan
Center. Download the
Final Report (December 4, 1998). (SkyDrive) Contact
Elizabeth Rockwell at 305-375-1881
for complete details.
- West Flagler Street Corridor Study 1997 - Seek solutions
to mobility problems and promote transportation modes other than single-occupancy
vehicles along West Flagler Street. Started in 1997 and completed September
1998. Work by Miami-Dade's Planning, Development and Regulation (now
Miami-Dade Planning & Zoning Department).
Download the
Final Report (September 1997) and
Implementation Measures (September 1998). (SkyDrive) Contact
Susan Schreiber at 305-375-1887 for
complete details.
- Westchester Traffic Impact Study 2007 - The study
will evaluate current and future traffic conditions as a result of new development
and roadway improvements in the Westchester area. The area is defined as: Palmetto
Expressway to the east, Krome Avenue to the west, S.R. 836 to the north, and
Miller Drive/SW 56th Street to the south. Started April 2007 and completed June
2008. Work by Gannett Fleming.
The final cost was $54,986. Download the
Final Report (June 2008). Contact
Wilson Fernandez at 305-375-1886 for
complete details.
Search
Translate
Copyright © 1977-2010 Metropolitan Planning Organization for the Miami Urbanized
Area