|
A giant 43-foot wide, 265-ton cutter head that's longer than a football field has been lowered into a pit on Watson Island. It's the crucial front piece of the massive boring machine that will dig the Port of Miami tunnel.The tunnel is slated for completion in 2014 and will give trucks direct access to the port and reduce traffic downtown.
|